[
 {
  "record": "AFR-P-0001",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-PAPSS-COVERAGE-2026-06",
  "source_title": "PAPSS Payments Network Coverage, June 2026",
  "publisher": "Pan-African Payment and Settlement System (Afreximbank)",
  "source_tier": "primary",
  "source_url": "https://papss.com/wp-content/uploads/2026/06/PAPSS-PAYMENTS-NETWORK-COVERAGE_JUNE2026-5.pdf",
  "locator": "PDF p.3 (headline figures); live participants from the coverage pages, pp.4-5 and 7-30",
  "says": "lists live participants in Djibouti, Gambia, Ghana, Guinea, Kenya, Liberia, Malawi, Nigeria, Rwanda, Sierra Leone, Tanzania, Uganda, Zambia and Zimbabwe; headline figures of \"190+\" institutions signed up and \"31\" African countries reachable",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0001",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-PAPSS-COVERAGE-2026-06",
  "source_title": "PAPSS Payments Network Coverage, June 2026",
  "publisher": "Pan-African Payment and Settlement System (Afreximbank)",
  "source_tier": "primary",
  "source_url": "https://papss.com/wp-content/uploads/2026/06/PAPSS-PAYMENTS-NETWORK-COVERAGE_JUNE2026-5.pdf",
  "locator": "PDF p.25 (South Africa, 22 banks reachable); PDF p.4 (the asterisk's note)",
  "says": "\"South Africa*\" is listed among countries reachable through the Extended Network (inbound only), with \"22 banks reachable\"; the asterisk's note reads \"Requires additional integration where applicable\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0001",
  "path": "evidence[0]",
  "source": "S-PAPSS-ROLLOUT-2021",
  "source_title": "Afreximbank and AfCFTA announce the Operational Roll-out of the Pan-African Payment and Settlement System (PAPSS)",
  "publisher": "Pan-African Payment and Settlement System (Afreximbank and the AfCFTA Secretariat)",
  "source_tier": "primary",
  "source_url": "https://papss.com/media/afreximbank-and-afcfta-announce-the-operational-roll-out-of-the-pan-african-payment-and-settlement-system-papss/",
  "locator": "press release, third paragraph and closing section",
  "says": "\"The implementation of the infrastructure is taking place in collaboration with the African Continental Free Trade Area (AfCFTA) Secretariat with the endorsement of the African Union (AU)\"; Afreximbank and the AU \"first announced PAPSS at the Twelfth Extraordinary Summit of the African Union held on July 7, 2019, in Niamey, Niger Republic, therefore adopting PAPSS as a key instrument for the implementation of the African Continental Free Trade Agreement (AfCFTA)\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0001",
  "path": "evidence[1]",
  "source": "S-PAPSS-MOU-2023-06",
  "source_title": "Five African Multinational Commercial Banking Groups Embrace PAPSS New Settlement Model",
  "publisher": "Pan-African Payment and Settlement System (Afreximbank)",
  "source_tier": "primary",
  "source_url": "https://papss.com/media/five-african-multinational-commercial-banking-groups-embrace-papss-new-settlement-model/",
  "locator": "press release, first and second paragraphs, and the paragraph on putting the memoranda into effect",
  "says": "PAPSS announced \"the signing of Memorandums of Understanding (MOUs) with five African multinational commercial banking groups: Access Bank Group, Ecobank Group, KCB Group, Standard Bank Group, and UBA Group\", signed on 19 June 2023 in Accra; \"These MOUs will be put into effect gradually in partnership with central banks in the countries where the 5 Group Banks operate.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0002",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-ATI-RLSF-2022",
  "source_title": "ATI press release on the Regional Liquidity Support Facility (Lilongwe, 29 March 2022)",
  "publisher": "African Trade and Investment Development Insurance (ATI)",
  "source_tier": "primary",
  "source_url": "https://atidi.africa/?p=6907",
  "locator": "press release text",
  "says": "\"a guarantee instrument designed to address the short-term liquidity risks\" faced by renewable power producers selling to state-owned utilities; standby letters of credit \"can be drawn by the IPPs following any delayed payments by the state-owned offtakers\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0002",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-ATI-RLSF-2022",
  "source_title": "ATI press release on the Regional Liquidity Support Facility (Lilongwe, 29 March 2022)",
  "publisher": "African Trade and Investment Development Insurance (ATI)",
  "source_tier": "primary",
  "source_url": "https://atidi.africa/?p=6907",
  "locator": "press release text",
  "says": "Malawi signed the facility's memorandum of understanding on 30 November 2018",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0002",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-ATI-RLSF-2022",
  "source_title": "ATI press release on the Regional Liquidity Support Facility (Lilongwe, 29 March 2022)",
  "publisher": "African Trade and Investment Development Insurance (ATI)",
  "source_tier": "primary",
  "source_url": "https://atidi.africa/?p=6907",
  "locator": "press release text",
  "says": "\"Currently, seven of ATI's member countries have signed the MoU and can benefit from RLSF\": Benin, Burundi, Côte d'Ivoire, Madagascar, Malawi, Uganda and Zambia",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0002",
  "path": "tracks.delivery.evidence[3]",
  "source": "S-ATI-RLSF-2022",
  "source_title": "ATI press release on the Regional Liquidity Support Facility (Lilongwe, 29 March 2022)",
  "publisher": "African Trade and Investment Development Insurance (ATI)",
  "source_tier": "primary",
  "source_url": "https://atidi.africa/?p=6907",
  "locator": "press release text",
  "says": "the second phase was \"recently announced by ATI and its partners\"; the new structure \"will no longer involve an LC issuing bank\", and contracts are to be signed between ATI and the power producers",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0002",
  "path": "tracks.delivery.evidence[4]",
  "source": "S-ATI-RLSF-2022",
  "source_title": "ATI press release on the Regional Liquidity Support Facility (Lilongwe, 29 March 2022)",
  "publisher": "African Trade and Investment Development Insurance (ATI)",
  "source_tier": "primary",
  "source_url": "https://atidi.africa/?p=6907",
  "locator": "press release text",
  "says": "\"ATI has provided instrumental guarantees in support of three projects in Malawi\": the Nkhotakota, Salima and Golomoti solar power plants, \"enabling these projects, with a combined installed capacity of 101 MW, to achieve financial close\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0002",
  "path": "bankability.basis[0]",
  "source": "S-ATI-RLSF-2022",
  "source_title": "ATI press release on the Regional Liquidity Support Facility (Lilongwe, 29 March 2022)",
  "publisher": "African Trade and Investment Development Insurance (ATI)",
  "source_tier": "primary",
  "source_url": "https://atidi.africa/?p=6907",
  "locator": "press release text",
  "says": "\"a guarantee instrument designed to address the short-term liquidity risks\" faced by renewable power producers selling to state-owned utilities; standby letters of credit \"can be drawn by the IPPs following any delayed payments by the state-owned offtakers\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0002",
  "path": "bankability.basis[1]",
  "source": "S-ATI-RLSF-2022",
  "source_title": "ATI press release on the Regional Liquidity Support Facility (Lilongwe, 29 March 2022)",
  "publisher": "African Trade and Investment Development Insurance (ATI)",
  "source_tier": "primary",
  "source_url": "https://atidi.africa/?p=6907",
  "locator": "press release text",
  "says": "\"Currently, seven of ATI's member countries have signed the MoU and can benefit from RLSF\": Benin, Burundi, Côte d'Ivoire, Madagascar, Malawi, Uganda and Zambia",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0002",
  "path": "bankability.basis[2]",
  "source": "S-ATI-RLSF-2022",
  "source_title": "ATI press release on the Regional Liquidity Support Facility (Lilongwe, 29 March 2022)",
  "publisher": "African Trade and Investment Development Insurance (ATI)",
  "source_tier": "primary",
  "source_url": "https://atidi.africa/?p=6907",
  "locator": "press release text",
  "says": "\"ATI has provided instrumental guarantees in support of three projects in Malawi\": the Nkhotakota, Salima and Golomoti solar power plants, \"enabling these projects, with a combined installed capacity of 101 MW, to achieve financial close\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0002",
  "path": "bankability.basis[3]",
  "source": "S-ATI-RLSF-2022",
  "source_title": "ATI press release on the Regional Liquidity Support Facility (Lilongwe, 29 March 2022)",
  "publisher": "African Trade and Investment Development Insurance (ATI)",
  "source_tier": "primary",
  "source_url": "https://atidi.africa/?p=6907",
  "locator": "press release text",
  "says": "the second phase was \"recently announced by ATI and its partners\"; the new structure \"will no longer involve an LC issuing bank\", and contracts are to be signed between ATI and the power producers",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0002",
  "path": "bankability.risk_and_cost[0]",
  "source": "S-ATI-RLSF-2022",
  "source_title": "ATI press release on the Regional Liquidity Support Facility (Lilongwe, 29 March 2022)",
  "publisher": "African Trade and Investment Development Insurance (ATI)",
  "source_tier": "primary",
  "source_url": "https://atidi.africa/?p=6907",
  "locator": "press release text",
  "says": "in the first phase ATI and KfW provided collateral to Absa South Africa, which issued the standby letters of credit",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "AFR-P-0002",
  "path": "bankability.risk_and_cost[1]",
  "source": "S-ATI-RLSF-2022",
  "source_title": "ATI press release on the Regional Liquidity Support Facility (Lilongwe, 29 March 2022)",
  "publisher": "African Trade and Investment Development Insurance (ATI)",
  "source_tier": "primary",
  "source_url": "https://atidi.africa/?p=6907",
  "locator": "press release text",
  "says": "the second phase is expected to reduce \"the cost of RLSF cover\" because \"any fees currently charged by the LC issuing bank will no longer be applied\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0001",
  "path": "tracks.legal.evidence[0]",
  "source": "S-AU-AFCFTA-SL-2026-05",
  "source_title": "List of countries which have signed, ratified/acceded to the Agreement Establishing the African Continental Free Trade Area",
  "publisher": "African Union Commission (depositary)",
  "source_tier": "primary",
  "source_url": "https://au.int/sites/default/files/treaties/36437-sl-AGREEMENT_ESTABLISHING_THE_AFRICAN_CONTINENTAL_FREE_TRADE_AREA_1.pdf",
  "locator": "PDF p.2 of 2 (note under the table)",
  "says": "\"ENTERED INTO FORCE ON 30th MAY 2019\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0001",
  "path": "tracks.legal.evidence[1]",
  "source": "S-AU-AFCFTA-SL-2026-05",
  "source_title": "List of countries which have signed, ratified/acceded to the Agreement Establishing the African Continental Free Trade Area",
  "publisher": "African Union Commission (depositary)",
  "source_tier": "primary",
  "source_url": "https://au.int/sites/default/files/treaties/36437-sl-AGREEMENT_ESTABLISHING_THE_AFRICAN_CONTINENTAL_FREE_TRADE_AREA_1.pdf",
  "locator": "PDF p.2 of 2 (totals row); list dated 22/05/2026",
  "says": "\"Total countries : 55\", \"of signature : 54\", \"of ratification : 49\", \"of deposit : 49\"; the rows for Benin, Libya, Somalia, South Sudan and Sudan show no ratification",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0001",
  "path": "tracks.legal.evidence[2]",
  "source": "S-AU-DEC975-2026",
  "source_title": "Decision on the report of the first meeting of the Assembly Committee of Heads of State and Government on the implementation of the AfCFTA, Assembly/AU/Dec.975(XXXIX)",
  "publisher": "African Union Assembly",
  "source_tier": "primary",
  "source_url": "https://tinyurl.com/54e26uvx",
  "locator": "paragraph 10, PDF p.2 of 5",
  "says": "the Assembly \"COMMENDS the Republic of Madagascar for ratifying the Agreement Establishing the AfCFTA and for having deposited its Instrument of Ratification; FURTHER COMMENDS the Federal Republic of Somalia for ratifying the Agreement Establishing the AfCFTA and encourages expeditious deposit of its Instrument of Ratification\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0001",
  "path": "tracks.legal.evidence[3]",
  "source": "S-AFCFTA-TARIFF-2026-07",
  "source_title": "Status of Tariff Offers: July 2026",
  "publisher": "AfCFTA Secretariat",
  "source_tier": "primary",
  "source_url": "https://au-afcfta.org/status-of-tariff-offers-july-2026/",
  "locator": "stage 01, \"State Parties that have ratified the Agreement\", and the note under \"About these figures\"",
  "says": "stage 01 lists \"50 countries\", among them \"Somalia*\", with the note: \"Somalia has completed its parliamentary ratification process. The AfCFTA Secretariat has not yet received official notification that its instrument of ratification has been deposited with the African Union Commission.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0001",
  "path": "tracks.legal.evidence[4]",
  "source": "S-TRALAC-FAQ-2026-09",
  "source_title": "AfCFTA: Frequently Asked Questions, updated September 2026",
  "publisher": "tralac (Trade Law Centre)",
  "source_tier": "secondary",
  "source_url": "https://www.tralac.org/documents/resources/faqs/7994-afcfta-frequently-asked-questions-updated-september-2026.html",
  "locator": "PDF p.2, question 2 (second column; the text carries a footnote marker after \"ratification\", pointing to a post on X)",
  "says": "\"As at mid-September 2026, 50 of the 54 signatories had deposited their instruments of ratification. Somalia deposited its instrument of ratification with the depositary (the Chair of the African Union Commission) on 4 September 2026.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0001",
  "path": "evidence[0]",
  "source": "S-AU-AFCFTA-TEXT",
  "source_title": "Agreement Establishing the African Continental Free Trade Area (consolidated text)",
  "publisher": "African Union",
  "source_tier": "primary",
  "source_url": "https://au.int/sites/default/files/treaties/36437-treaty-consolidated_text_on_cfta_-_en.pdf",
  "locator": "Article 19(2), PDF p.14 of 78",
  "says": "\"State Parties that are members of other regional economic communities, regional trading arrangements and custom unions, which have attained among themselves higher levels of regional integration than under this Agreement, shall maintain such higher levels among themselves.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.rules.evidence[0]",
  "source": "S-ZA-SARS-AFCFTA-2024",
  "source_title": "Letter to trade: Implementation of the African Continental Free Trade Area (AfCFTA) Agreement",
  "publisher": "South African Revenue Service (Rules of Origin and Trade Agreements)",
  "source_tier": "primary",
  "source_url": "https://www.sars.gov.za/wp-content/uploads/Docs/CandE/Letter-to-Trader-Implementation-of-AfCFTA-Agreement-1-Feb-2024.pdf",
  "locator": "PDF p.1 of 2",
  "says": "\"In October 2021, the AfCFTA Council of Ministers (CoM) for Trade adopted the Ministerial Directive on the Provisional Application of Schedules of Tariff Concessions.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.rules.evidence[1]",
  "source": "S-ZA-SARS-AFCFTA-2024",
  "source_title": "Letter to trade: Implementation of the African Continental Free Trade Area (AfCFTA) Agreement",
  "publisher": "South African Revenue Service (Rules of Origin and Trade Agreements)",
  "source_tier": "primary",
  "source_url": "https://www.sars.gov.za/wp-content/uploads/Docs/CandE/Letter-to-Trader-Implementation-of-AfCFTA-Agreement-1-Feb-2024.pdf",
  "locator": "PDF p.1 of 2",
  "says": "\"The Assembly of Heads of State and Government adopted the Ministerial Directive in February 2022.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.rules.evidence[2]",
  "source": "S-AFCFTA-TARIFF-2026-07",
  "source_title": "Status of Tariff Offers: July 2026",
  "publisher": "AfCFTA Secretariat",
  "source_tier": "primary",
  "source_url": "https://au-afcfta.org/status-of-tariff-offers-july-2026/",
  "locator": "\"About these figures\" (\"From adoption to trade\")",
  "says": "\"Once their tariff schedules are verified and adopted, State Parties must gazette them to domesticate them in national law. Each State Party then submits a copy of the official Gazette and the gazetted tariff schedule to the AfCFTA Secretariat, which circulates them to all State Parties.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-AFCFTA-SG-2025-07",
  "source_title": "Progress report on the implementation of the African Continental Free Trade Area (AfCFTA) to the Executive Council, EX.CL/1625(XLVII)",
  "publisher": "AfCFTA Secretariat (report of the Secretary-General to the AU Executive Council)",
  "source_tier": "primary",
  "source_url": "https://www.tralac.org/documents/resources/cfta/7851-progress-report-of-the-african-continental-free-trade-area-july-2025.html",
  "locator": "paragraphs 3-4, printed p.1 / PDF p.3 of 18",
  "says": "\"49 Provisional Schedules of Tariff Concessions (PSTCs) have been submitted, and 48 of them have been adopted\"; \"Of the 48 verified and adopted offers, only 17 State Parties have submitted full Schedules of Tariff Concessions (STCs) covering Categories A, B, and C. Most of the remaining 31 are Category A only, mainly from Customs Unions (EAC, ECOWAS, SACU).\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-AFCFTA-SG-2025-07",
  "source_title": "Progress report on the implementation of the African Continental Free Trade Area (AfCFTA) to the Executive Council, EX.CL/1625(XLVII)",
  "publisher": "AfCFTA Secretariat (report of the Secretary-General to the AU Executive Council)",
  "source_tier": "primary",
  "source_url": "https://www.tralac.org/documents/resources/cfta/7851-progress-report-of-the-african-continental-free-trade-area-july-2025.html",
  "locator": "paragraph 5, printed p.2 / PDF p.4 of 18",
  "says": "\"the Secretariat has received gazette notices from 24 State Parties that have completed the domestication process for the implementation of the AfCFTA thus confirming their readiness to trade under AfCFTA regime\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-AU-DEC975-2026",
  "source_title": "Decision on the report of the first meeting of the Assembly Committee of Heads of State and Government on the implementation of the AfCFTA, Assembly/AU/Dec.975(XXXIX)",
  "publisher": "African Union Assembly",
  "source_tier": "primary",
  "source_url": "https://tinyurl.com/54e26uvx",
  "locator": "paragraph 11, PDF p.2 of 5",
  "says": "the Assembly \"FURTHER COMMENDS the Federal Republic of Nigeria, the Federal Democratic Republic of Ethiopia and the Republics of Mozambique and Namibia for completing their domestic process of gazetting the Provisional Schedule of Tariff Concessions\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.delivery.evidence[3]",
  "source": "S-AU-DEC975-2026",
  "source_title": "Decision on the report of the first meeting of the Assembly Committee of Heads of State and Government on the implementation of the AfCFTA, Assembly/AU/Dec.975(XXXIX)",
  "publisher": "African Union Assembly",
  "source_tier": "primary",
  "source_url": "https://tinyurl.com/54e26uvx",
  "locator": "paragraph 11, PDF p.2 of 5",
  "says": "the Assembly \"URGES the remaining State Parties that are yet to gazette their respective Provisional Schedule of Tariff Concessions to complete their domestic processes and finalise internal procedures to initiate trade under the rules of the Agreement Establishing the AfCFTA, by the end of 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.delivery.evidence[4]",
  "source": "S-AFCFTA-TARIFF-2026-07",
  "source_title": "Status of Tariff Offers: July 2026",
  "publisher": "AfCFTA Secretariat",
  "source_tier": "primary",
  "source_url": "https://au-afcfta.org/status-of-tariff-offers-july-2026/",
  "locator": "stage 04, \"Gazetted PSTCs: domesticated and ready to trade\"",
  "says": "\"26 countries\": Algeria, Botswana, Burundi, Cameroon, Egypt, Eswatini, Ethiopia, Ghana, Kenya, Lesotho, Malawi, Mauritius, Morocco, Mozambique, Namibia, Nigeria, Rwanda, Seychelles, Tanzania, The Gambia, Tunisia, Uganda, South Africa, South Sudan, Zambia and Sierra Leone",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.delivery.evidence[5]",
  "source": "S-AFCFTA-TARIFF-2026-07",
  "source_title": "Status of Tariff Offers: July 2026",
  "publisher": "AfCFTA Secretariat",
  "source_tier": "primary",
  "source_url": "https://au-afcfta.org/status-of-tariff-offers-july-2026/",
  "locator": "stage 03, \"Adopted PSTCs, yet to be gazetted\"",
  "says": "\"22 countries\": Angola, Benin, Burkina Faso, Cabo Verde, Central African Republic, Chad, Comoros, Congo, Côte d'Ivoire, DR Congo, Equatorial Guinea, Gabon, Liberia, Madagascar, Mali, Mauritania, Niger, Senegal, Togo, Zimbabwe, Guinea and Guinea-Bissau",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.delivery.evidence[6]",
  "source": "S-AFCFTA-TARIFF-2026-07",
  "source_title": "Status of Tariff Offers: July 2026",
  "publisher": "AfCFTA Secretariat",
  "source_tier": "primary",
  "source_url": "https://au-afcfta.org/status-of-tariff-offers-july-2026/",
  "locator": "stage 05, \"Notified the Secretariat of trading under the AfCFTA\"",
  "says": "\"State Parties that have formally notified the AfCFTA Secretariat that they are trading under AfCFTA preferences\": 12 countries, namely Cameroon, Egypt, Ethiopia, Ghana, Kenya, Mauritius, Namibia, Nigeria, Rwanda, Tanzania, Tunisia and South Africa",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.delivery.evidence[7]",
  "source": "S-AFCFTA-GTI-PAGE",
  "source_title": "Guided Trade Initiative",
  "publisher": "AfCFTA Secretariat",
  "source_tier": "primary",
  "source_url": "https://au-afcfta.org/guided-trade-initiative/",
  "locator": "page text, first paragraph",
  "says": "\"The AfCFTA Guided Trade Initiative (GTI), launched on October 7, 2022, represents a strategic approach to initiate commercially significant trade under the AfCFTA preferences.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.delivery.evidence[8]",
  "source": "S-AFCFTA-GTI-2022",
  "source_title": "What is the AfCFTA Guided Trade Initiative all about?",
  "publisher": "AfCFTA Secretariat",
  "source_tier": "primary",
  "source_url": "https://au-afcfta.org/2022/10/what-is-the-afcfta-guided-trade-initiative-all-about/",
  "locator": "article text, second paragraph",
  "says": "\"Rwanda is among eight state parties – Cameroon, Egypt, Ghana, Kenya, Mauritius, Rwanda, Tanzania and Tunisia – participating in the AfCFTA Guided Trade Initiative.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.delivery.evidence[9]",
  "source": "S-AFCFTA-SG-2025-07",
  "source_title": "Progress report on the implementation of the African Continental Free Trade Area (AfCFTA) to the Executive Council, EX.CL/1625(XLVII)",
  "publisher": "AfCFTA Secretariat (report of the Secretary-General to the AU Executive Council)",
  "source_tier": "primary",
  "source_url": "https://www.tralac.org/documents/resources/cfta/7851-progress-report-of-the-african-continental-free-trade-area-july-2025.html",
  "locator": "paragraphs 22 and 24, printed p.5 / PDF p.7 of 18",
  "says": "\"The Guided Trade Initiative (GTI) expanded from 7 to 39 participating countries\"; \"Over 1,200 Certificates of Origin were issued, reflecting active trade in diverse products\"; \"Having achieved its objectives, the GTI has concluded.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "tracks.delivery.evidence[10]",
  "source": "S-AFCFTA-COM18-2026",
  "source_title": "AfCFTA Council of Ministers concludes 18th Meeting in Abuja (press release)",
  "publisher": "AfCFTA Secretariat (AfCFTA Media Hub)",
  "source_tier": "primary",
  "source_url": "https://afcfta.media/press-release/afcfta-council-of-ministers-concludes-18th-meeting-in-abuja/",
  "locator": "press release, seventh paragraph",
  "says": "the Secretary-General pointed to \"more than 12,000 Certificates of Origin issued under the Agreement and notified to the Secretariat as of March 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "observations[0]",
  "source": "S-AFCFTA-TARIFF-2026-07",
  "source_title": "Status of Tariff Offers: July 2026",
  "publisher": "AfCFTA Secretariat",
  "source_tier": "primary",
  "source_url": "https://au-afcfta.org/status-of-tariff-offers-july-2026/",
  "locator": "stage 01",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "observations[1]",
  "source": "S-AFCFTA-TARIFF-2026-07",
  "source_title": "Status of Tariff Offers: July 2026",
  "publisher": "AfCFTA Secretariat",
  "source_tier": "primary",
  "source_url": "https://au-afcfta.org/status-of-tariff-offers-july-2026/",
  "locator": "stage 02",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "observations[2]",
  "source": "S-AFCFTA-TARIFF-2026-07",
  "source_title": "Status of Tariff Offers: July 2026",
  "publisher": "AfCFTA Secretariat",
  "source_tier": "primary",
  "source_url": "https://au-afcfta.org/status-of-tariff-offers-july-2026/",
  "locator": "stage 03",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "observations[3]",
  "source": "S-AFCFTA-TARIFF-2026-07",
  "source_title": "Status of Tariff Offers: July 2026",
  "publisher": "AfCFTA Secretariat",
  "source_tier": "primary",
  "source_url": "https://au-afcfta.org/status-of-tariff-offers-july-2026/",
  "locator": "stage 04",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0002",
  "path": "observations[4]",
  "source": "S-AFCFTA-TARIFF-2026-07",
  "source_title": "Status of Tariff Offers: July 2026",
  "publisher": "AfCFTA Secretariat",
  "source_tier": "primary",
  "source_url": "https://au-afcfta.org/status-of-tariff-offers-july-2026/",
  "locator": "stage 05",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0003",
  "path": "tracks.rules.evidence[0]",
  "source": "S-AFCFTA-SG-2025-07",
  "source_title": "Progress report on the implementation of the African Continental Free Trade Area (AfCFTA) to the Executive Council, EX.CL/1625(XLVII)",
  "publisher": "AfCFTA Secretariat (report of the Secretary-General to the AU Executive Council)",
  "source_tier": "primary",
  "source_url": "https://www.tralac.org/documents/resources/cfta/7851-progress-report-of-the-african-continental-free-trade-area-july-2025.html",
  "locator": "paragraph 6, printed p.2 / PDF p.4 of 18",
  "says": "\"the percentage of agreed tariff lines remains at 92.43% (including chapters 61 and 62) due to pending conclusion of negotiations on textiles and automotives rules of origin\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0003",
  "path": "tracks.rules.evidence[1]",
  "source": "S-AU-DECISIONS-2026-02",
  "source_title": "Decisions, declarations and resolutions of the 39th Ordinary Session of the Assembly of the Union (14-15 February 2026)",
  "publisher": "African Union Assembly",
  "source_tier": "primary",
  "source_url": "https://tinyurl.com/48nkdb5d",
  "locator": "Assembly/AU/Dec.956(XXXIX), paragraph 10, decision p.2 / PDF p.35 of 225",
  "says": "under \"ADOPTS\", the Assembly lists \"The agreed rules in Appendix IV on Rules of Origin approved by the Council of Ministers\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0003",
  "path": "tracks.rules.evidence[2]",
  "source": "S-AU-DECISIONS-2026-02",
  "source_title": "Decisions, declarations and resolutions of the 39th Ordinary Session of the Assembly of the Union (14-15 February 2026)",
  "publisher": "African Union Assembly",
  "source_tier": "primary",
  "source_url": "https://tinyurl.com/48nkdb5d",
  "locator": "Assembly/AU/Dec.956(XXXIX), paragraph 2, decision p.1 / PDF p.34 of 225",
  "says": "the Assembly \"TAKES NOTE of the Ministerial Directive on the Application of the Provisional Rules of Origin for Textiles and Apparel adopted by the Council of Ministers.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0003",
  "path": "tracks.rules.evidence[3]",
  "source": "S-TRALAC-FAQ-2026-09",
  "source_title": "AfCFTA: Frequently Asked Questions, updated September 2026",
  "publisher": "tralac (Trade Law Centre)",
  "source_tier": "secondary",
  "source_url": "https://www.tralac.org/documents/resources/faqs/7994-afcfta-frequently-asked-questions-updated-september-2026.html",
  "locator": "PDF p.6, question 8",
  "says": "\"The AU Assembly, at its February 2026 meeting, adopted the out-standing rules of origin for the automotive, clothing and textiles sectors. As a result, 100% of the AfCFTA rules of origin have now been agreed.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0004",
  "path": "tracks.rules.evidence[0]",
  "source": "S-AFCFTA-SG-2025-07",
  "source_title": "Progress report on the implementation of the African Continental Free Trade Area (AfCFTA) to the Executive Council, EX.CL/1625(XLVII)",
  "publisher": "AfCFTA Secretariat (report of the Secretary-General to the AU Executive Council)",
  "source_tier": "primary",
  "source_url": "https://www.tralac.org/documents/resources/cfta/7851-progress-report-of-the-african-continental-free-trade-area-july-2025.html",
  "locator": "paragraph 35, printed p.7 / PDF p.9 of 18",
  "says": "\"the 16th Meeting of the Council of Ministers adopted key instruments, including the Draft AfCFTA Regulations for the Establishment of a Continental Transit Guarantee System, the AfCFTA Transit Document, and an accompanying implementation roadmap. These developments represent a major milestone by laying the groundwork for a single bond guarantee scheme across the continent.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0004",
  "path": "tracks.rules.evidence[1]",
  "source": "S-AFCFTA-SG-2025-07",
  "source_title": "Progress report on the implementation of the African Continental Free Trade Area (AfCFTA) to the Executive Council, EX.CL/1625(XLVII)",
  "publisher": "AfCFTA Secretariat (report of the Secretary-General to the AU Executive Council)",
  "source_tier": "primary",
  "source_url": "https://www.tralac.org/documents/resources/cfta/7851-progress-report-of-the-african-continental-free-trade-area-july-2025.html",
  "locator": "paragraph 41, printed p.8 / PDF p.10 of 18",
  "says": "\"the Secretariat and Afreximbank have finalised a Regulatory Framework for a Continental Transit Guarantee Scheme, based on the COMESA model, to streamline procedures and reduce delays\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0004",
  "path": "evidence[0]",
  "source": "S-AFCFTA-SG-2025-07",
  "source_title": "Progress report on the implementation of the African Continental Free Trade Area (AfCFTA) to the Executive Council, EX.CL/1625(XLVII)",
  "publisher": "AfCFTA Secretariat (report of the Secretary-General to the AU Executive Council)",
  "source_tier": "primary",
  "source_url": "https://www.tralac.org/documents/resources/cfta/7851-progress-report-of-the-african-continental-free-trade-area-july-2025.html",
  "locator": "paragraphs 38-39, printed pp.7-8 / PDF p.10 of 18",
  "says": "the Ras-Jedir border post project \"has progressed to the proof-of-concept stage\"; experts are being engaged \"to develop a Continental Regulatory Framework for One-Stop Border Posts (OSBPs)\"; training is planned \"along the Abidjan–Lagos Corridor and at Kasumbalesa Border Post\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "tracks.legal.evidence[0]",
  "source": "S-AFCFTA-INV-PROTOCOL",
  "source_title": "Protocol to the Agreement Establishing the African Continental Free Trade Area on Investment",
  "publisher": "African Union",
  "source_tier": "primary",
  "source_url": "https://rtais.wto.org/rtadocs/1086/AnnexAndRelatedDocs/English/4.%20EN-AfCFTA-Protocol-on-Investment-Feb2023.pdf",
  "locator": "closing line, printed p.30 / PDF p.31 of 32",
  "says": "\"ADOPTED BY THE 36TH ORDINARY SESSION OF THE ASSEMBLY, HELD IN ADDIS ABABA, ETHIOPIA, ON 19 FEBRUARY 2023\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "tracks.legal.evidence[1]",
  "source": "S-AU-DEC975-2026",
  "source_title": "Decision on the report of the first meeting of the Assembly Committee of Heads of State and Government on the implementation of the AfCFTA, Assembly/AU/Dec.975(XXXIX)",
  "publisher": "African Union Assembly",
  "source_tier": "primary",
  "source_url": "https://tinyurl.com/54e26uvx",
  "locator": "paragraph 5, PDF p.1 of 5",
  "says": "the Assembly \"STRONGLY URGES Member States to ratify the AfCFTA Protocols on Investment, Competition Policy, Intellectual Property Rights, Digital Trade, and Women and Youth in Trade by the end of 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "tracks.legal.evidence[2]",
  "source": "S-ZA-DTIC-NW640-2025",
  "source_title": "Reply to question NW640, Minister of Trade, Industry and Competition (National Assembly)",
  "publisher": "Minister of Trade, Industry and Competition (reproduced by the Parliamentary Monitoring Group)",
  "source_tier": "primary",
  "source_url": "https://pmg.org.za/committee-question/29536/",
  "locator": "reply text, list of outstanding items",
  "says": "\"Ratification of Protocol on Investment and Protocol on Intellectual Property Rights pending finalisation of the Annexes and adoption by the AU Summit\"; the annexes \"will be submitted for ratification by SA Parliament once adopted by the African Union Heads of State and Government (expected by 2027)\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "tracks.rules.evidence[0]",
  "source": "S-AFCFTA-SG-2025-07",
  "source_title": "Progress report on the implementation of the African Continental Free Trade Area (AfCFTA) to the Executive Council, EX.CL/1625(XLVII)",
  "publisher": "AfCFTA Secretariat (report of the Secretary-General to the AU Executive Council)",
  "source_tier": "primary",
  "source_url": "https://www.tralac.org/documents/resources/cfta/7851-progress-report-of-the-african-continental-free-trade-area-july-2025.html",
  "locator": "paragraph 48, printed p.9 / PDF p.11 of 18",
  "says": "\"Negotiations for the Draft Annex on the Rules and Procedures for the Prevention, Management, and Resolution of Disputes to the Protocol on Investment are ongoing. While significant progress has been made, a request by 5 Member States on the inclusion of Investor-State Arbitration (ISDS) in the Annex constitutes an area of ongoing negotiations.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "tracks.rules.evidence[1]",
  "source": "S-AFCFTA-SG-2025-07",
  "source_title": "Progress report on the implementation of the African Continental Free Trade Area (AfCFTA) to the Executive Council, EX.CL/1625(XLVII)",
  "publisher": "AfCFTA Secretariat (report of the Secretary-General to the AU Executive Council)",
  "source_tier": "primary",
  "source_url": "https://www.tralac.org/documents/resources/cfta/7851-progress-report-of-the-african-continental-free-trade-area-july-2025.html",
  "locator": "paragraph 48, printed pp.9-10 / PDF pp.11-12 of 18",
  "says": "the Assembly \"directed the Council of Ministers to finalise negotiations on the Annex\" by \"its next session in February 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "tracks.rules.evidence[2]",
  "source": "S-AFCFTA-COM18-2026",
  "source_title": "AfCFTA Council of Ministers concludes 18th Meeting in Abuja (press release)",
  "publisher": "AfCFTA Secretariat (AfCFTA Media Hub)",
  "source_tier": "primary",
  "source_url": "https://afcfta.media/press-release/afcfta-council-of-ministers-concludes-18th-meeting-in-abuja/",
  "locator": "press release, second paragraph",
  "says": "\"A limited number of legal instruments remain under negotiation — notably an outstanding Annex to the Investment Protocol and a remaining Annex to the Protocol on Intellectual Property Rights — which State Parties are working to finalise.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "evidence[0]",
  "source": "S-AFCFTA-SG-2025-07",
  "source_title": "Progress report on the implementation of the African Continental Free Trade Area (AfCFTA) to the Executive Council, EX.CL/1625(XLVII)",
  "publisher": "AfCFTA Secretariat (report of the Secretary-General to the AU Executive Council)",
  "source_tier": "primary",
  "source_url": "https://www.tralac.org/documents/resources/cfta/7851-progress-report-of-the-african-continental-free-trade-area-july-2025.html",
  "locator": "paragraph 47, printed p.9 / PDF p.11 of 18",
  "says": "\"The AfCFTA Protocol on Investment is a binding legal instrument adopted in February 2024.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "evidence[1]",
  "source": "S-AFCFTA-INV-PROTOCOL",
  "source_title": "Protocol to the Agreement Establishing the African Continental Free Trade Area on Investment",
  "publisher": "African Union",
  "source_tier": "primary",
  "source_url": "https://rtais.wto.org/rtadocs/1086/AnnexAndRelatedDocs/English/4.%20EN-AfCFTA-Protocol-on-Investment-Feb2023.pdf",
  "locator": "Article 48(2), printed p.28 / PDF p.29 of 32",
  "says": "\"This Protocol shall enter into force in accordance with the provisions of paragraphs 2 and 4 of Article 23 of the AfCFTA Agreement.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "evidence[2]",
  "source": "S-AU-AFCFTA-TEXT",
  "source_title": "Agreement Establishing the African Continental Free Trade Area (consolidated text)",
  "publisher": "African Union",
  "source_tier": "primary",
  "source_url": "https://au.int/sites/default/files/treaties/36437-treaty-consolidated_text_on_cfta_-_en.pdf",
  "locator": "Article 23(2), PDF p.15 of 78",
  "says": "\"The Protocols on Investment, Intellectual Property Rights, Competition Policy and any other Instrument within the scope of this Agreement deemed necessary, shall enter into force thirty (30) days after the deposit of the twenty second (22nd) instrument of ratification.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "evidence[3]",
  "source": "S-AFCFTA-INV-PROTOCOL",
  "source_title": "Protocol to the Agreement Establishing the African Continental Free Trade Area on Investment",
  "publisher": "African Union",
  "source_tier": "primary",
  "source_url": "https://rtais.wto.org/rtadocs/1086/AnnexAndRelatedDocs/English/4.%20EN-AfCFTA-Protocol-on-Investment-Feb2023.pdf",
  "locator": "Article 49(1), printed p.28 / PDF p.29 of 32",
  "says": "\"Existing bilateral investment treaties concluded between the State Parties shall be terminated within five (5) years from the entry into force of this Protocol.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "evidence[4]",
  "source": "S-AFCFTA-INV-PROTOCOL",
  "source_title": "Protocol to the Agreement Establishing the African Continental Free Trade Area on Investment",
  "publisher": "African Union",
  "source_tier": "primary",
  "source_url": "https://rtais.wto.org/rtadocs/1086/AnnexAndRelatedDocs/English/4.%20EN-AfCFTA-Protocol-on-Investment-Feb2023.pdf",
  "locator": "Article 49(2), printed p.28 / PDF p.29 of 32",
  "says": "\"State Parties shall not conclude new bilateral investment treaties among themselves after the adoption of this Protocol.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "evidence[5]",
  "source": "S-AFCFTA-INV-PROTOCOL",
  "source_title": "Protocol to the Agreement Establishing the African Continental Free Trade Area on Investment",
  "publisher": "African Union",
  "source_tier": "primary",
  "source_url": "https://rtais.wto.org/rtadocs/1086/AnnexAndRelatedDocs/English/4.%20EN-AfCFTA-Protocol-on-Investment-Feb2023.pdf",
  "locator": "Article 49(3), printed p.28 / PDF p.29 of 32",
  "says": "\"State Parties shall make best endeavours to review and revise relevant existing regional investment agreements adopted by the Regional Economic Communities to achieve alignment with the Protocol within a period between five (5) to ten (10) years from the entry into force of this Protocol.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "evidence[6]",
  "source": "S-AFCFTA-INV-PROTOCOL",
  "source_title": "Protocol to the Agreement Establishing the African Continental Free Trade Area on Investment",
  "publisher": "African Union",
  "source_tier": "primary",
  "source_url": "https://rtais.wto.org/rtadocs/1086/AnnexAndRelatedDocs/English/4.%20EN-AfCFTA-Protocol-on-Investment-Feb2023.pdf",
  "locator": "Article 49(4), printed p.29 / PDF p.30 of 32",
  "says": "\"State Parties may take into account the requirements of this Protocol when negotiating international investment agreements and when reviewing existing international investment agreements concluded with Third Parties.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "AFR-T-0005",
  "path": "evidence[7]",
  "source": "S-AFCFTA-INV-PROTOCOL",
  "source_title": "Protocol to the Agreement Establishing the African Continental Free Trade Area on Investment",
  "publisher": "African Union",
  "source_tier": "primary",
  "source_url": "https://rtais.wto.org/rtadocs/1086/AnnexAndRelatedDocs/English/4.%20EN-AfCFTA-Protocol-on-Investment-Feb2023.pdf",
  "locator": "Article 51(2), printed p.29 / PDF p.30 of 32",
  "says": "\"Each State Party shall notify the AfCFTA Secretariat of any international and regional agreements pertaining to or affecting investment with other State Parties and Third Parties to which it is signatory prior to or after the entry into force of this Protocol.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-K-0001",
  "path": "evidence[0]",
  "source": "S-MZ-HCB-RC-2024",
  "source_title": "Relatório e Contas 2024 | Annual Report 2024",
  "publisher": "Hidroeléctrica de Cahora Bassa, S.A. (HCB)",
  "source_tier": "primary",
  "source_url": "https://hcbadm.mzbusiness.com/wp-content/uploads/2025/08/Relatorio-e-Contas-2024-Bilingue-VF-1.pdf",
  "locator": "beside Table 6 (Balanço Energético | Power Balance), printed p.73 / PDF p.38",
  "says": "\"With regard to firm power contracts, during the year 66% were allocated to Eskom, 30% to EDM and 4% to ZESA.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-K-0001",
  "path": "evidence[1]",
  "source": "S-MZ-HCB-RC-2024",
  "source_title": "Relatório e Contas 2024 | Annual Report 2024",
  "publisher": "Hidroeléctrica de Cahora Bassa, S.A. (HCB)",
  "source_tier": "primary",
  "source_url": "https://hcbadm.mzbusiness.com/wp-content/uploads/2025/08/Relatorio-e-Contas-2024-Bilingue-VF-1.pdf",
  "locator": "below Table 7, printed p.74 / PDF p.39",
  "says": "\"It should be noted that the downward trend in supply to Eskom results from load growth in the domestic market, which is why sales to EDM grew by 13%.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-K-0001",
  "path": "evidence[2]",
  "source": "S-LUSA-HCB-2025",
  "source_title": "Lusa news digest, 7 November 2025: HCB deliveries and the end of the Eskom contract",
  "publisher": "Lusa, as reprinted by AMAN Alliance",
  "source_tier": "secondary",
  "source_url": "https://www.aman-alliance.org/Home/ContentDetail/92258",
  "locator": "article text",
  "says": "President Daniel Chapo confirmed on 23 June 2025 that the supply contract with Eskom, in force since 1979, would be reversed in 2030",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "MOZ-K-0001",
  "path": "observations[0]",
  "source": "S-MZ-HCB-RC-2024",
  "source_title": "Relatório e Contas 2024 | Annual Report 2024",
  "publisher": "Hidroeléctrica de Cahora Bassa, S.A. (HCB)",
  "source_tier": "primary",
  "source_url": "https://hcbadm.mzbusiness.com/wp-content/uploads/2025/08/Relatorio-e-Contas-2024-Bilingue-VF-1.pdf",
  "locator": "Table 7 (Venda de Energia | Power Sales), printed p.74 / PDF p.39",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-K-0001",
  "path": "observations[1]",
  "source": "S-MZ-HCB-RC-2024",
  "source_title": "Relatório e Contas 2024 | Annual Report 2024",
  "publisher": "Hidroeléctrica de Cahora Bassa, S.A. (HCB)",
  "source_tier": "primary",
  "source_url": "https://hcbadm.mzbusiness.com/wp-content/uploads/2025/08/Relatorio-e-Contas-2024-Bilingue-VF-1.pdf",
  "locator": "Table 7, printed p.74 / PDF p.39",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-K-0001",
  "path": "observations[2]",
  "source": "S-MZ-HCB-RC-2024",
  "source_title": "Relatório e Contas 2024 | Annual Report 2024",
  "publisher": "Hidroeléctrica de Cahora Bassa, S.A. (HCB)",
  "source_tier": "primary",
  "source_url": "https://hcbadm.mzbusiness.com/wp-content/uploads/2025/08/Relatorio-e-Contas-2024-Bilingue-VF-1.pdf",
  "locator": "Table 7, printed p.74 / PDF p.39",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-K-0001",
  "path": "observations[3]",
  "source": "S-MZ-HCB-RC-2024",
  "source_title": "Relatório e Contas 2024 | Annual Report 2024",
  "publisher": "Hidroeléctrica de Cahora Bassa, S.A. (HCB)",
  "source_tier": "primary",
  "source_url": "https://hcbadm.mzbusiness.com/wp-content/uploads/2025/08/Relatorio-e-Contas-2024-Bilingue-VF-1.pdf",
  "locator": "Table 7, printed p.74 / PDF p.39",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-K-0002",
  "path": "evidence[0]",
  "source": "S-S32-MOZAL-2026",
  "source_title": "Mozal Aluminium placed on care and maintenance (JSE SENS announcement)",
  "publisher": "South32 Limited",
  "source_tier": "primary",
  "source_url": "https://www.sharedata.co.za/sens.asp?id=541988",
  "locator": "announcement text",
  "says": "South32 placed Mozal Aluminium on care and maintenance on 15 March 2026, after six years of engagement with the Government of Mozambique, Eskom and other stakeholders",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "MOZ-K-0002",
  "path": "evidence[1]",
  "source": "S-S32-MOZAL-2026",
  "source_title": "Mozal Aluminium placed on care and maintenance (JSE SENS announcement)",
  "publisher": "South32 Limited",
  "source_tier": "primary",
  "source_url": "https://www.sharedata.co.za/sens.asp?id=541988",
  "locator": "announcement text, statement by the chief executive, Graham Kerr",
  "says": "\"unable to secure sufficient and affordable power supply for Mozal beyond March 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-P-0001",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-FN-RESSANO-2026",
  "source_title": "Work starts on Ressano Garcia border upgrade",
  "publisher": "Freight News",
  "source_tier": "secondary",
  "source_url": "https://www.freightnews.co.za/article/work-starts-on-ressano-garcia-border-upgrade",
  "locator": "article text",
  "says": "\"Mozambique has broken ground on a 980-million-metical (about R260m) modernisation of the Ressano Garcia border post\"; the project was launched on 17 August",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-P-0001",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-FN-RESSANO-2026",
  "source_title": "Work starts on Ressano Garcia border upgrade",
  "publisher": "Freight News",
  "source_tier": "secondary",
  "source_url": "https://www.freightnews.co.za/article/work-starts-on-ressano-garcia-border-upgrade",
  "locator": "article text",
  "says": "\"A one-stop border model will allow travellers to complete South African and Mozambican entry and exit procedures at a single facility\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-P-0001",
  "path": "financing.costs[0].cite",
  "source": "S-FN-RESSANO-2026",
  "source_title": "Work starts on Ressano Garcia border upgrade",
  "publisher": "Freight News",
  "source_tier": "secondary",
  "source_url": "https://www.freightnews.co.za/article/work-starts-on-ressano-garcia-border-upgrade",
  "locator": "article text",
  "says": "\"Mozambique has broken ground on a 980-million-metical (about R260m) modernisation of the Ressano Garcia border post\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-P-0002",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-AFD-MAPUTO-RAIL",
  "source_title": "Modernization and capacity increase of the Maputo-Ressano Garcia railway (project page)",
  "publisher": "Agence Française de Développement",
  "source_tier": "primary",
  "source_url": "https://www.afd.fr/en/projects/modernization-and-capacity-increase-maputo-ressano-garcia-railway",
  "locator": "project page, key data",
  "says": "\"Project start date July 18, 2025\"; \"Project end date July 18, 2030\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-P-0002",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-AFD-MAPUTO-RAIL",
  "source_title": "Modernization and capacity increase of the Maputo-Ressano Garcia railway (project page)",
  "publisher": "Agence Française de Développement",
  "source_tier": "primary",
  "source_url": "https://www.afd.fr/en/projects/modernization-and-capacity-increase-maputo-ressano-garcia-railway",
  "locator": "project page, context",
  "says": "\"The Ressano Garcia rail line (88 km) links Maputo, the country's capital, to the South African border\"; it mainly carries ores such as magnetite, coal and chrome",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-P-0002",
  "path": "financing.money[0].evidence[0]",
  "source": "S-AFD-MAPUTO-RAIL",
  "source_title": "Modernization and capacity increase of the Maputo-Ressano Garcia railway (project page)",
  "publisher": "Agence Française de Développement",
  "source_tier": "primary",
  "source_url": "https://www.afd.fr/en/projects/modernization-and-capacity-increase-maputo-ressano-garcia-railway",
  "locator": "project page, description",
  "says": "\"CFM has applied for financing from AFD, Agence française de développement, and the European Union\"; the financing plan includes \"Two non-sovereign loans from AFD to CFM for a total of 133.4 MUSD\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-P-0002",
  "path": "financing.money[1].evidence[0]",
  "source": "S-AFD-MAPUTO-RAIL",
  "source_title": "Modernization and capacity increase of the Maputo-Ressano Garcia railway (project page)",
  "publisher": "Agence Française de Développement",
  "source_tier": "primary",
  "source_url": "https://www.afd.fr/en/projects/modernization-and-capacity-increase-maputo-ressano-garcia-railway",
  "locator": "project page, description",
  "says": "\"CFM has applied for financing from AFD, Agence française de développement, and the European Union\"; the financing plan includes \"a €30 million grant from the European Union\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-P-0003",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-MW-NATION-INTERCONNECTOR-2026",
  "source_title": "Malawi-Mozambique power line passes test",
  "publisher": "The Nation (Nation Online, Malawi)",
  "source_tier": "secondary",
  "source_url": "https://mwnation.com/malawi-mozambique-power-line-passes-test/",
  "locator": "article text",
  "says": "\"transmission line from Matambo Substation in Mozambique to Phombeya Substation in Malawi energised on August 8 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-P-0003",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-MW-NATION-INTERCONNECTOR-2026",
  "source_title": "Malawi-Mozambique power line passes test",
  "publisher": "The Nation (Nation Online, Malawi)",
  "source_tier": "secondary",
  "source_url": "https://mwnation.com/malawi-mozambique-power-line-passes-test/",
  "locator": "article text",
  "says": "\"Malawi and Mozambique Power Interconnector went live on test basis with a transfer of five megawatts\"; the import was \"symbolic to test and commission commercial metering equipment\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-P-0003",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-MW-NATION-INTERCONNECTOR-2026",
  "source_title": "Malawi-Mozambique power line passes test",
  "publisher": "The Nation (Nation Online, Malawi)",
  "source_tier": "secondary",
  "source_url": "https://mwnation.com/malawi-mozambique-power-line-passes-test/",
  "locator": "article text, attributed to the Ministry of Energy; report of 1 September 2026",
  "says": "\"is currently finalising discussions on the tariff and other arrangements required\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-P-0003",
  "path": "tracks.delivery.evidence[3]",
  "source": "S-GT-INTERCONNECTOR-2026",
  "source_title": "Malawi–Mozambique interconnector commissioned after construction delays",
  "publisher": "Global Transmission Report",
  "source_tier": "secondary",
  "source_url": "https://globaltransmission.info/malawi-mozambique-interconnector-commissioned-after-construction-delays/",
  "locator": "first paragraph",
  "says": "\"the 218-km Mozambique–Malawi transmission interconnector, which was commissioned on August 10, 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-P-0003",
  "path": "evidence[0]",
  "source": "S-MW-NYASA-INTERCONNECTOR-2026",
  "source_title": "Malawi's Power Crisis Deepens As Mozambique Lifeline Misses Third Deadline",
  "publisher": "Nyasa Times, distributed by allAfrica",
  "source_tier": "secondary",
  "source_url": "https://allafrica.com/stories/202608200278.html",
  "locator": "article text",
  "says": "\"has passed without a single megawatt flowing into Malawi.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-R-0001",
  "path": "tracks.legal.evidence[0]",
  "source": "S-MZ-LEI-12-2022",
  "source_title": "Lei n.º 12/2022, de 11 de Julho, Lei de Electricidade (Boletim da República, I Série, n.º 132)",
  "publisher": "Assembleia da República; copy hosted by ARENE (Autoridade Reguladora de Energia)",
  "source_tier": "primary",
  "source_url": "https://arene.org.mz/wp-content/uploads/2022/08/Lei-de-Electricidade-2022.pdf",
  "locator": "printed p.1140 / PDF p.6",
  "says": "\"O concessionário de transporte e/ou distribuição de energia eléctrica não pode recusar a outro concessionário ou consumidor, havendo disponibilidade técnica e desde que não afecte negativamente as suas obrigações de qualidade de serviço, o acesso e trânsito de energia eléctrica na sua instalação eléctrica.\"; \"O concessionário de transporte e/ou distribuição de energia eléctrica concede, sem discriminação, o acesso e trânsito a outro concessionário ou consumidor em condições comparáveis\"; \"O trânsito de energia eléctrica através das instalações de um terceiro é feito mediante o pagamento de uma tarifa de trânsito aprovada pela ARENE.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-R-0001",
  "path": "tracks.legal.evidence[1]",
  "source": "S-MZ-LEI-12-2022",
  "source_title": "Lei n.º 12/2022, de 11 de Julho, Lei de Electricidade (Boletim da República, I Série, n.º 132)",
  "publisher": "Assembleia da República; copy hosted by ARENE (Autoridade Reguladora de Energia)",
  "source_tier": "primary",
  "source_url": "https://arene.org.mz/wp-content/uploads/2022/08/Lei-de-Electricidade-2022.pdf",
  "locator": "printed p.1146 / PDF p.12",
  "says": "\"A presente Lei entra em vigor 90 dias após a data da sua publicação.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-R-0001",
  "path": "tracks.rules.evidence[0]",
  "source": "S-MZ-DEC-31-2026",
  "source_title": "Decreto n.º 31/2026, de 7 de Julho, Regulamento para a Atribuição, Execução e Extinção de Concessões para a Produção, Transporte, Distribuição, Comercialização, Armazenamento, Importação e Exportação de Energia Eléctrica (Boletim da República, I Série, n.º 127)",
  "publisher": "Conselho de Ministros; copy hosted by ARENE",
  "source_tier": "primary",
  "source_url": "https://arene.org.mz/wp-content/uploads/2026/08/Decreto-31-2026-Regulamento-da-Lei-da-Electricidade.pdf",
  "locator": "printed p.1081 / PDF p.19",
  "says": "\"A concessionária de transporte e distribuição e o Gestor do Sistema Eléctrico Nacional devem permitir o acesso à respectiva rede de transporte a terceiros, de forma não discriminatória e em condições equiparáveis de qualidade, desde que haja capacidade disponível e não afecte os níveis regulamentares de qualidade, eficiência, segurança e fiabilidade do serviço e da operação do Sistema Eléctrico Nacional, mediante o pagamento de uma tarifa de trânsito.\"; \"feito mediante o pagamento de uma tarifa de trânsito fixada em termos a regulamentar pela Autoridade Reguladora de Energia.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-R-0001",
  "path": "tracks.rules.evidence[1]",
  "source": "S-MZ-DEC-31-2026",
  "source_title": "Decreto n.º 31/2026, de 7 de Julho, Regulamento para a Atribuição, Execução e Extinção de Concessões para a Produção, Transporte, Distribuição, Comercialização, Armazenamento, Importação e Exportação de Energia Eléctrica (Boletim da República, I Série, n.º 127)",
  "publisher": "Conselho de Ministros; copy hosted by ARENE",
  "source_tier": "primary",
  "source_url": "https://arene.org.mz/wp-content/uploads/2026/08/Decreto-31-2026-Regulamento-da-Lei-da-Electricidade.pdf",
  "locator": "printed p.1063 / PDF p.1",
  "says": "\"As actividades de transporte e distribuição de energia eléctrica são objecto de regulamentação complementar.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-R-0002",
  "path": "tracks.legal.evidence[0]",
  "source": "S-MZ-LEI-12-2022",
  "source_title": "Lei n.º 12/2022, de 11 de Julho, Lei de Electricidade (Boletim da República, I Série, n.º 132)",
  "publisher": "Assembleia da República; copy hosted by ARENE (Autoridade Reguladora de Energia)",
  "source_tier": "primary",
  "source_url": "https://arene.org.mz/wp-content/uploads/2022/08/Lei-de-Electricidade-2022.pdf",
  "locator": "printed p.1136 / PDF p.2",
  "says": "\"A gestão do Sistema Eléctrico Nacional é atribuída a uma pessoa colectiva de Direito Público, com autonomia administrativa, financeira e patrimonial\"; \"O Gestor do Sistema Eléctrico Nacional exerce as funções de Operação de Sistema e de Operação do Mercado\"; \"Compete ao Conselho de Ministros aprovar o estatuto\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-R-0002",
  "path": "tracks.legal.evidence[1]",
  "source": "S-MZ-LEI-12-2022",
  "source_title": "Lei n.º 12/2022, de 11 de Julho, Lei de Electricidade (Boletim da República, I Série, n.º 132)",
  "publisher": "Assembleia da República; copy hosted by ARENE (Autoridade Reguladora de Energia)",
  "source_tier": "primary",
  "source_url": "https://arene.org.mz/wp-content/uploads/2022/08/Lei-de-Electricidade-2022.pdf",
  "locator": "printed p.1146 / PDF p.12",
  "says": "\"A presente Lei entra em vigor 90 dias após a data da sua publicação.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-R-0002",
  "path": "tracks.rules.evidence[0]",
  "source": "S-MZ-DEC-31-2026",
  "source_title": "Decreto n.º 31/2026, de 7 de Julho, Regulamento para a Atribuição, Execução e Extinção de Concessões para a Produção, Transporte, Distribuição, Comercialização, Armazenamento, Importação e Exportação de Energia Eléctrica (Boletim da República, I Série, n.º 127)",
  "publisher": "Conselho de Ministros; copy hosted by ARENE",
  "source_tier": "primary",
  "source_url": "https://arene.org.mz/wp-content/uploads/2026/08/Decreto-31-2026-Regulamento-da-Lei-da-Electricidade.pdf",
  "locator": "printed p.1063 / PDF p.1",
  "says": "\"As funções do Gestor do Sistema Eléctrico Nacional são exercidas pela Electricidade de Moçambique, E.P, enquanto não for aprovado o estatuto as competências e a estrutura orgânica do Gestor do Sistema Eléctrico Nacional\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-R-0002",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-MZ-DEC-31-2026",
  "source_title": "Decreto n.º 31/2026, de 7 de Julho, Regulamento para a Atribuição, Execução e Extinção de Concessões para a Produção, Transporte, Distribuição, Comercialização, Armazenamento, Importação e Exportação de Energia Eléctrica (Boletim da República, I Série, n.º 127)",
  "publisher": "Conselho de Ministros; copy hosted by ARENE",
  "source_tier": "primary",
  "source_url": "https://arene.org.mz/wp-content/uploads/2026/08/Decreto-31-2026-Regulamento-da-Lei-da-Electricidade.pdf",
  "locator": "printed p.1063 / PDF p.1, decree article 3",
  "says": "\"As funções do Gestor do Sistema Eléctrico Nacional são exercidas pela Electricidade de Moçambique, E.P\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-R-0003",
  "path": "tracks.legal.evidence[0]",
  "source": "S-MZ-LEI-12-2022",
  "source_title": "Lei n.º 12/2022, de 11 de Julho, Lei de Electricidade (Boletim da República, I Série, n.º 132)",
  "publisher": "Assembleia da República; copy hosted by ARENE (Autoridade Reguladora de Energia)",
  "source_tier": "primary",
  "source_url": "https://arene.org.mz/wp-content/uploads/2022/08/Lei-de-Electricidade-2022.pdf",
  "locator": "printed p.1138 / PDF p.4",
  "says": "\"A exportação de energia elétrica deve ser feita sem prejuízo da Segurança Energética Nacional.\"; \"As tarifas de exportação não podem ser subsidiadas em prejuízo do mercado nacional.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-R-0003",
  "path": "tracks.legal.evidence[1]",
  "source": "S-MZ-LEI-12-2022",
  "source_title": "Lei n.º 12/2022, de 11 de Julho, Lei de Electricidade (Boletim da República, I Série, n.º 132)",
  "publisher": "Assembleia da República; copy hosted by ARENE (Autoridade Reguladora de Energia)",
  "source_tier": "primary",
  "source_url": "https://arene.org.mz/wp-content/uploads/2022/08/Lei-de-Electricidade-2022.pdf",
  "locator": "printed p.1138 / PDF p.4",
  "says": "\"A importação de energia eléctrica é feita pelos concessionários de produção, transporte e distribuição, quando o respectivo contrato de concessão especificamente assim o autorize e para assegurar o fornecimento de energia aos respectivos consumidores.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-R-0003",
  "path": "tracks.legal.evidence[2]",
  "source": "S-MZ-LEI-12-2022",
  "source_title": "Lei n.º 12/2022, de 11 de Julho, Lei de Electricidade (Boletim da República, I Série, n.º 132)",
  "publisher": "Assembleia da República; copy hosted by ARENE (Autoridade Reguladora de Energia)",
  "source_tier": "primary",
  "source_url": "https://arene.org.mz/wp-content/uploads/2022/08/Lei-de-Electricidade-2022.pdf",
  "locator": "printed p.1146 / PDF p.12",
  "says": "\"A presente Lei entra em vigor 90 dias após a data da sua publicação.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "MOZ-R-0003",
  "path": "tracks.rules.evidence[0]",
  "source": "S-MZ-DEC-31-2026",
  "source_title": "Decreto n.º 31/2026, de 7 de Julho, Regulamento para a Atribuição, Execução e Extinção de Concessões para a Produção, Transporte, Distribuição, Comercialização, Armazenamento, Importação e Exportação de Energia Eléctrica (Boletim da República, I Série, n.º 127)",
  "publisher": "Conselho de Ministros; copy hosted by ARENE",
  "source_tier": "primary",
  "source_url": "https://arene.org.mz/wp-content/uploads/2026/08/Decreto-31-2026-Regulamento-da-Lei-da-Electricidade.pdf",
  "locator": "printed p.1063 / PDF p.1",
  "says": "\"O presente Regulamento estabelece os procedimentos e competências relativos à atribuição, execução e extinção de concessões para a produção, armazenamento, transporte, distribuição e comercialização de energia eléctrica, incluindo a importação e exportação de energia eléctrica.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-K-0001",
  "path": "observations[0]",
  "source": "S-NA-NAMPOWER-IAR-2024",
  "source_title": "NamPower Integrated Annual Report 2024 (year to 30 June 2024)",
  "publisher": "NamPower",
  "source_tier": "primary",
  "source_url": "https://www.nampower.com.na/Media/Document/559400c8-51a9-427d-8cbc-62021aac8d82.pdf",
  "locator": "p.14 (headline) and p.23 (units into system)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-K-0001",
  "path": "observations[1]",
  "source": "S-NA-NAMPOWER-IAR-2024",
  "source_title": "NamPower Integrated Annual Report 2024 (year to 30 June 2024)",
  "publisher": "NamPower",
  "source_tier": "primary",
  "source_url": "https://www.nampower.com.na/Media/Document/559400c8-51a9-427d-8cbc-62021aac8d82.pdf",
  "locator": "p.23, Units into system (GWh)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-K-0001",
  "path": "observations[2]",
  "source": "S-NA-BRIEF-NSA-2026-01",
  "source_title": "Namibia imports over half of electricity in January",
  "publisher": "The Brief",
  "source_tier": "secondary",
  "source_url": "https://thebrief.com.na/2026/03/namibia-imports-over-half-of-electricity-in-january/",
  "locator": "article text",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-K-0001",
  "path": "observations[3]",
  "source": "S-NA-ME-NSA-2026-08",
  "source_title": "Namibia relies on imports for 65% of electricity supply in August",
  "publisher": "Mining & Energy (Namibia)",
  "source_tier": "secondary",
  "source_url": "https://miningandenergy.com.na/namibia-relies-on-imports-for-65-of-electricity-supply-in-august/",
  "locator": "article text",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-K-0001",
  "path": "observations[4]",
  "source": "S-NA-ME-NSA-2026-08",
  "source_title": "Namibia relies on imports for 65% of electricity supply in August",
  "publisher": "Mining & Energy (Namibia)",
  "source_tier": "secondary",
  "source_url": "https://miningandenergy.com.na/namibia-relies-on-imports-for-65-of-electricity-supply-in-august/",
  "locator": "article text",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-K-0001",
  "path": "observations[5]",
  "source": "S-NA-NAMPOWER-IAR-2024",
  "source_title": "NamPower Integrated Annual Report 2024 (year to 30 June 2024)",
  "publisher": "NamPower",
  "source_tier": "primary",
  "source_url": "https://www.nampower.com.na/Media/Document/559400c8-51a9-427d-8cbc-62021aac8d82.pdf",
  "locator": "p.14",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-K-0002",
  "path": "evidence[0]",
  "source": "S-NA-NAMIBIAN-BLACKOUT-2026",
  "source_title": "NamPower apologises after midnight blackout hits central, coast",
  "publisher": "The Namibian",
  "source_tier": "secondary",
  "source_url": "https://www.namibian.com.na/nampower-apologises-after-midnight-blackout-hits-central-coast/",
  "locator": "article text",
  "says": "\"The outage, which struck at 01h31, was caused by a fault on the 400kV system at Kokerboom substation\"; \"Power was restored across the affected network at 01h49, bringing the partial blackout to an end after 18 minutes.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-K-0002",
  "path": "evidence[1]",
  "source": "S-SAPP-MR-2026-08",
  "source_title": "SAPP Monthly Report, August 2026 (R08)",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/R08-SAPP%20MONTHLY%20REPORT%20AUGUST%202026.pdf",
  "locator": "Table 3, p.5 (inferred)",
  "says": "a planned outage on 17-18 October 2026 of \"The 400kV Kokerboom - Aries (South Africa – Namibia) interconnector for maintenance\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-P-0001",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-NA-NAMPOWER-PROJECTS",
  "source_title": "NamPower projects page (Obib-Oranjemund 400 kV interconnector; Auas-Kokerboom)",
  "publisher": "NamPower",
  "source_tier": "primary",
  "source_url": "https://www.nampower.com.na/Projects/",
  "locator": "projects page, Obib-Oranjemund entry",
  "says": "NamPower's section was built between November 2024 and May 2025, as the \"second interconnector to Eskom\"",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "NAM-P-0001",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-NA-NAMPOWER-PROJECTS",
  "source_title": "NamPower projects page (Obib-Oranjemund 400 kV interconnector; Auas-Kokerboom)",
  "publisher": "NamPower",
  "source_tier": "primary",
  "source_url": "https://www.nampower.com.na/Projects/",
  "locator": "projects page, Obib-Oranjemund entry",
  "says": "the third portion \"is the construction by Eskom of the line from Orange River to the Oranjemond substation in South Africa - however this portion has not yet been completed\" (the page spells it Oranjemond)",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-P-0001",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-NA-NAMPOWER-PROJECTS",
  "source_title": "NamPower projects page (Obib-Oranjemund 400 kV interconnector; Auas-Kokerboom)",
  "publisher": "NamPower",
  "source_tier": "primary",
  "source_url": "https://www.nampower.com.na/Projects/",
  "locator": "projects page, Obib-Oranjemund entry",
  "says": "commissioning targeted for July 2026",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "NAM-P-0001",
  "path": "financing.costs[0].cite",
  "source": "S-NA-NAMPOWER-PROJECTS",
  "source_title": "NamPower projects page (Obib-Oranjemund 400 kV interconnector; Auas-Kokerboom)",
  "publisher": "NamPower",
  "source_tier": "primary",
  "source_url": "https://www.nampower.com.na/Projects/",
  "locator": "projects page, Obib-Oranjemund entry",
  "says": "NamPower gives the cost of its section as N$1.2 billion",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0001",
  "path": "tracks.legal.evidence[0]",
  "source": "S-NA-ELEC-ACT-2007",
  "source_title": "Electricity Act 4 of 2007 (annotated statute)",
  "publisher": "Legal Assistance Centre (annotated copy of the Government Gazette text)",
  "source_tier": "primary",
  "source_url": "https://www.lac.org.na/laws/annoSTAT/Electricity%20Act%204%20of%202007.pdf",
  "locator": "commencement note (Government Notice 201 of 2007, Gazette 3933)",
  "says": "the Act came into force on 15 November 2007",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0001",
  "path": "tracks.legal.evidence[1]",
  "source": "S-NA-NAMIBIAN-CABINET-2019",
  "source_title": "Namibia: Cabinet Approves Revised Electricity Supply Model (The Namibian, via allAfrica)",
  "publisher": "The Namibian / allAfrica",
  "source_tier": "secondary",
  "source_url": "https://allafrica.com/stories/201904240293.html",
  "locator": "article text",
  "says": "\"Cabinet has approved a revised single buyer market model for the supply of electricity\", at \"the sixth Cabinet meeting last Tuesday\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0001",
  "path": "tracks.legal.evidence[2]",
  "source": "S-NA-ME-NERA-2026",
  "source_title": "Namibia moves to establish fully empowered energy regulator",
  "publisher": "Mining & Energy (Namibia)",
  "source_tier": "secondary",
  "source_url": "https://miningandenergy.com.na/namibia-moves-to-establish-fully-empowered-energy-regulator/",
  "locator": "article text (published 3 March 2026)",
  "says": "the ECB's chief executive said the bills had been finalised among the three parties involved and were awaiting the Minister; tribunal provisions were still being resolved (the state reported in March 2026)",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0001",
  "path": "tracks.rules.evidence[0]",
  "source": "S-NA-MSB-RULES-2022",
  "source_title": "Modified Single Buyer Market Rules, General Notice 736 of 2022",
  "publisher": "Electricity Control Board, Government Gazette 7983",
  "source_tier": "primary",
  "source_url": "https://www.lac.org.na/laws/2022/7983.pdf",
  "locator": "Gazette 7983, title page",
  "says": "the ECB's Modified Single Buyer Market Rules, published as General Notice 736 of 2022 in Government Gazette 7983",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0001",
  "path": "tracks.rules.evidence[1]",
  "source": "S-NA-MSB-RULES-2022",
  "source_title": "Modified Single Buyer Market Rules, General Notice 736 of 2022",
  "publisher": "Electricity Control Board, Government Gazette 7983",
  "source_tier": "primary",
  "source_url": "https://www.lac.org.na/laws/2022/7983.pdf",
  "locator": "rule 4(1)(b)(i), p.8 (inferred)",
  "says": "\"transmission connected customers may purchase up to 30% of their energy demand from eligible generators\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0001",
  "path": "tracks.rules.evidence[2]",
  "source": "S-NA-MSB-RULES-2022",
  "source_title": "Modified Single Buyer Market Rules, General Notice 736 of 2022",
  "publisher": "Electricity Control Board, Government Gazette 7983",
  "source_tier": "primary",
  "source_url": "https://www.lac.org.na/laws/2022/7983.pdf",
  "locator": "rule 4(1)(e), p.8 (inferred)",
  "says": "\"Phase 2 will commence on 1 July 2026.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0001",
  "path": "tracks.rules.evidence[3]",
  "source": "S-NA-ECON-GRIDCODE-2025",
  "source_title": "Electricity regulator approves revised Transmission Grid Code for enhanced power system",
  "publisher": "The Economist (Namibia)",
  "source_tier": "secondary",
  "source_url": "https://economist.com.na/electricity-regulator-approves-revised-transmission-grid-code-for-enhanced-power-system/",
  "locator": "article text",
  "says": "the ECB Board approved the revised wheeling framework and grid codes at a meeting \"held on 27 March\"; the Board also reviewed \"the NamPower MSB office\", including \"the progress status regarding the establishment of a distinct structure\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0001",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-NA-ECB-MSB-PAGE",
  "source_title": "Modified Single Buyer (MSB) market model, consumer education page",
  "publisher": "Electricity Control Board",
  "source_tier": "primary",
  "source_url": "https://www.ecb.org.na/ces-campaign/ces-msb/",
  "locator": "web page text",
  "says": "the MSB was \"implemented in September 2019\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0001",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-NA-MSB-RULES-2022",
  "source_title": "Modified Single Buyer Market Rules, General Notice 736 of 2022",
  "publisher": "Electricity Control Board, Government Gazette 7983",
  "source_tier": "primary",
  "source_url": "https://www.lac.org.na/laws/2022/7983.pdf",
  "locator": "rule 4(1)(a), p.8 (inferred)",
  "says": "\"Phase 1a is effective from 1 September 2019 to 30 June 2021.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0001",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-NA-BRIEF-MSB-2025",
  "source_title": "Namibia to add 93MW in renewables, cutting power imports",
  "publisher": "The Brief",
  "source_tier": "secondary",
  "source_url": "https://thebrief.com.na/2025/05/namibia-to-add-93mw-in-renewables-cutting-power-imports",
  "locator": "article text (published May 2025)",
  "says": "the ECB's chief executive: \"There are currently seven solar PV plants with a combined 28MW operating under the MSB model.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0002",
  "path": "tracks.rules.evidence[0]",
  "source": "S-NA-BRIEF-MORATORIUM-2024",
  "source_title": "Namibia halts issuance of licences to export electricity",
  "publisher": "The Brief",
  "source_tier": "secondary",
  "source_url": "https://thebrief.com.na/2024/04/namibia-halts-issuance-of-licences-to-export-electricity/",
  "locator": "article text",
  "says": "a moratorium effective 5 March 2024 for 18 months, imposed on the ECB's suggestion, citing \"constrained transmission capacity on interconnections\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0002",
  "path": "tracks.rules.evidence[1]",
  "source": "S-NA-NEWERA-MORATORIUM-2026",
  "source_title": "ECB renews moratorium on electricity generation licences for exports",
  "publisher": "New Era",
  "source_tier": "secondary",
  "source_url": "https://neweralive.na/ecb-renews-moratorium-on-electricity-generation-licences-for-exports/",
  "locator": "article text",
  "says": "the Minister renewed the moratorium on the ECB's recommendation, effective 5 September 2025, for 40 months",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0002",
  "path": "tracks.rules.evidence[2]",
  "source": "S-NA-NEWERA-MORATORIUM-2026",
  "source_title": "ECB renews moratorium on electricity generation licences for exports",
  "publisher": "New Era",
  "source_tier": "secondary",
  "source_url": "https://neweralive.na/ecb-renews-moratorium-on-electricity-generation-licences-for-exports/",
  "locator": "article text",
  "says": "the moratorium runs to 5 January 2029 \"or until the existing transmission network constraints are alleviated\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0002",
  "path": "tracks.rules.evidence[3]",
  "source": "S-NA-NEWERA-MORATORIUM-2026",
  "source_title": "ECB renews moratorium on electricity generation licences for exports",
  "publisher": "New Era",
  "source_tier": "secondary",
  "source_url": "https://neweralive.na/ecb-renews-moratorium-on-electricity-generation-licences-for-exports/",
  "locator": "article text",
  "says": "\"limited transmission capacity on interconnectors in neighbouring South Africa continues to restrict electricity exports\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "NAM-R-0002",
  "path": "tracks.rules.evidence[4]",
  "source": "S-NA-NEWERA-MORATORIUM-2026",
  "source_title": "ECB renews moratorium on electricity generation licences for exports",
  "publisher": "New Era",
  "source_tier": "secondary",
  "source_url": "https://neweralive.na/ecb-renews-moratorium-on-electricity-generation-licences-for-exports/",
  "locator": "article text",
  "says": "exempted are plants with battery storage \"intended specifically for night-time electricity export to the SAPP\" (no condition attached), and IPPs taking part in NTCSA network upgrades, \"subject to formal confirmation from the South African utility\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0001",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-SARB-SADCRTGS-2026-09",
  "source_title": "SADC-RTGS Settlement Statistics and Indicators, September 2026",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-rtgs/2026-stats/SADC-RTGS%20Settlement%20Statistics%20and%20Indicators%20-%20September%202026.pdf",
  "locator": "PDF p.1 (as the web reader returned it; a reviewer reports p.2, so confirm against the PDF)",
  "says": "\"The SADC-RTGS processed 163,588 transactions to the value of ZAR 279.5 Billion\"; \"Total number of participating countries: 15\"; \"Total number of participating Banks (including central banks): 88\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0001",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-SARB-SADCRTGS-2026-09",
  "source_title": "SADC-RTGS Settlement Statistics and Indicators, September 2026",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-rtgs/2026-stats/SADC-RTGS%20Settlement%20Statistics%20and%20Indicators%20-%20September%202026.pdf",
  "locator": "PDF p.1 (as the web reader returned it; a reviewer reports p.2, so confirm against the PDF)",
  "says": "\"The total number of transactions settled to date is 7,518,029\", with a cumulative value of about R20.7 trillion converted at 30 September 2026 rates",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0001",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-SARB-KWANZA-2026",
  "source_title": "Introduction of the Angolan kwanza into the SADC-RTGS system (media release)",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/en/home/publications/publication-detail-pages/media-releases/2026/kwanza-rtgs",
  "locator": "media release text",
  "says": "the system \"has settled transactions exclusively in South African rand since its inception in 2013\"; the governors of the two central banks \"today formally announced\" the kwanza as a settlement currency",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0001",
  "path": "tracks.delivery.evidence[3]",
  "source": "S-SARB-KWANZA-2026",
  "source_title": "Introduction of the Angolan kwanza into the SADC-RTGS system (media release)",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/en/home/publications/publication-detail-pages/media-releases/2026/kwanza-rtgs",
  "locator": "media release text",
  "says": "the Reserve Bank intends to add other regional currencies, such as the Botswana pula, \"in due course\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0001",
  "path": "evidence[0]",
  "source": "S-SARB-KWANZA-2026",
  "source_title": "Introduction of the Angolan kwanza into the SADC-RTGS system (media release)",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/en/home/publications/publication-detail-pages/media-releases/2026/kwanza-rtgs",
  "locator": "media release text",
  "says": "direct settlement in kwanza lets participants avoid foreign-exchange conversions and so lowers transaction costs, in the release's account",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0001",
  "path": "observations[0]",
  "source": "S-SARB-SADCRTGS-2026-09",
  "source_title": "SADC-RTGS Settlement Statistics and Indicators, September 2026",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-rtgs/2026-stats/SADC-RTGS%20Settlement%20Statistics%20and%20Indicators%20-%20September%202026.pdf",
  "locator": "PDF p.1 (as the web reader returned it; a reviewer reports p.2, so confirm against the PDF)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0001",
  "path": "observations[1]",
  "source": "S-SARB-SADCRTGS-2026-09",
  "source_title": "SADC-RTGS Settlement Statistics and Indicators, September 2026",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-rtgs/2026-stats/SADC-RTGS%20Settlement%20Statistics%20and%20Indicators%20-%20September%202026.pdf",
  "locator": "PDF p.1 (as the web reader returned it; a reviewer reports p.2, so confirm against the PDF)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0001",
  "path": "observations[2]",
  "source": "S-SARB-SADCRTGS-2026-09",
  "source_title": "SADC-RTGS Settlement Statistics and Indicators, September 2026",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-rtgs/2026-stats/SADC-RTGS%20Settlement%20Statistics%20and%20Indicators%20-%20September%202026.pdf",
  "locator": "PDF p.1 (as the web reader returned it; a reviewer reports p.2, so confirm against the PDF)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0001",
  "path": "observations[3]",
  "source": "S-SARB-SADCRTGS-2026-09",
  "source_title": "SADC-RTGS Settlement Statistics and Indicators, September 2026",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-rtgs/2026-stats/SADC-RTGS%20Settlement%20Statistics%20and%20Indicators%20-%20September%202026.pdf",
  "locator": "PDF p.1 (as the web reader returned it; a reviewer reports p.2, so confirm against the PDF)",
  "says": "",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0001",
  "path": "observations[4]",
  "source": "S-SARB-SADCRTGS-2026-09",
  "source_title": "SADC-RTGS Settlement Statistics and Indicators, September 2026",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-rtgs/2026-stats/SADC-RTGS%20Settlement%20Statistics%20and%20Indicators%20-%20September%202026.pdf",
  "locator": "PDF p.1 (as the web reader returned it; a reviewer reports p.2, so confirm against the PDF)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0001",
  "path": "observations[5]",
  "source": "S-SARB-SADCRTGS-2026-09",
  "source_title": "SADC-RTGS Settlement Statistics and Indicators, September 2026",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-rtgs/2026-stats/SADC-RTGS%20Settlement%20Statistics%20and%20Indicators%20-%20September%202026.pdf",
  "locator": "PDF p.1 (as the web reader returned it; a reviewer reports p.2, so confirm against the PDF)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0002",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-SARB-SADCRTGS-2026-09",
  "source_title": "SADC-RTGS Settlement Statistics and Indicators, September 2026",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-rtgs/2026-stats/SADC-RTGS%20Settlement%20Statistics%20and%20Indicators%20-%20September%202026.pdf",
  "locator": "PDF p.1 (as the web reader returned it; a reviewer reports p.2, so confirm against the PDF)",
  "says": "\"Total volume settled on the TCIB payments scheme was 302 transactions\", worth ZAR 306,258,398.29, with 8 TCIB payment scheme participants",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0002",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-SADC-PSOC-2024",
  "source_title": "SADC Payment System Oversight Committee Report, April 2021 to June 2024",
  "publisher": "SADC Committee of Central Bank Governors (produced by the South African Reserve Bank)",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-psoc-activities/SADCPSOC%20Report%20April%202021%20-%20June%202024.pdf",
  "locator": "printed p.22 (text beside Figure 5, and Figure 6)",
  "says": "\"The SADC PSOC appointed and mandated BankservAfrica (Pty) Limited\" and authorised it as the SADC Regional Clearing and Settlement System Operator; \"The TCIB Payment Scheme is managed by BankservAfrica as appointed and mandated by the SADC PSOC\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0002",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-SADC-PSOC-2024",
  "source_title": "SADC Payment System Oversight Committee Report, April 2021 to June 2024",
  "publisher": "SADC Committee of Central Bank Governors (produced by the South African Reserve Bank)",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-psoc-activities/SADCPSOC%20Report%20April%202021%20-%20June%202024.pdf",
  "locator": "printed p.3 (foreword)",
  "says": "\"The TCIB Payment Scheme was launched in a controlled live environment with two countries, namely Namibia and Zimbabwe, in November 2021.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0002",
  "path": "observations[0]",
  "source": "S-SARB-SADCRTGS-2026-09",
  "source_title": "SADC-RTGS Settlement Statistics and Indicators, September 2026",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-rtgs/2026-stats/SADC-RTGS%20Settlement%20Statistics%20and%20Indicators%20-%20September%202026.pdf",
  "locator": "PDF p.1 (as the web reader returned it; a reviewer reports p.2, so confirm against the PDF)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0002",
  "path": "observations[1]",
  "source": "S-SARB-SADCRTGS-2026-09",
  "source_title": "SADC-RTGS Settlement Statistics and Indicators, September 2026",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-rtgs/2026-stats/SADC-RTGS%20Settlement%20Statistics%20and%20Indicators%20-%20September%202026.pdf",
  "locator": "PDF p.1 (as the web reader returned it; a reviewer reports p.2, so confirm against the PDF)",
  "says": "",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0002",
  "path": "observations[2]",
  "source": "S-SARB-SADCRTGS-2026-09",
  "source_title": "SADC-RTGS Settlement Statistics and Indicators, September 2026",
  "publisher": "South African Reserve Bank",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/payments-and-settlements/settlement-services/sadc-rtgs/2026-stats/SADC-RTGS%20Settlement%20Statistics%20and%20Indicators%20-%20September%202026.pdf",
  "locator": "PDF p.1 (as the web reader returned it; a reviewer reports p.2, so confirm against the PDF)",
  "says": "",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0003",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-SADC-PPDF-2021",
  "source_title": "SADC Project Preparation Development Facility continues to support Member States",
  "publisher": "SADC Secretariat",
  "source_tier": "primary",
  "source_url": "https://sadc.int/latest-news/sadc-project-preparation-development-facility-continues-support-member-states",
  "locator": "news item text",
  "says": "the facility had \"approved a total of Euro 20 million for the preparation of 13 regional projects\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0003",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-SADC-SUMMIT-2022",
  "source_title": "42nd SADC Summit, Democratic Republic of Congo, 17-18 August 2022 (Summit brochure)",
  "publisher": "SADC Secretariat",
  "source_tier": "primary",
  "source_url": "https://www.sadc.int/sites/default/files/2022-08/42nd%20Summit%20Brochure%20English.pdf",
  "locator": "printed p.50 (PDF p.52), Development Finance",
  "says": "\"As of March 2022, PPDF had approved a total of US$20.2 million (after savings and cancellation) for the preparation of 12 regional projects covering energy, transport and water sectors\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0003",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-DBSA-PPDF-MOZISA",
  "source_title": "SADC approves more than US$3m towards regional interconnector project",
  "publisher": "Development Bank of Southern Africa (SADC PPDF site)",
  "source_tier": "primary",
  "source_url": "https://sadcppdf.dbsa.org/article/sadc-approves-more-us3m-towards-regional-interconnector-project",
  "locator": "article text",
  "says": "US$3.5 million, the facility's first allocation, for the \"appointment of a Transaction Advisor to assist SAPP\" on the Mozambique–Zimbabwe–South Africa interconnector, with a bankable feasibility study among the deliverables",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0003",
  "path": "tracks.delivery.evidence[3]",
  "source": "S-SADC-PPDF-2021",
  "source_title": "SADC Project Preparation Development Facility continues to support Member States",
  "publisher": "SADC Secretariat",
  "source_tier": "primary",
  "source_url": "https://sadc.int/latest-news/sadc-project-preparation-development-facility-continues-support-member-states",
  "locator": "news item text",
  "says": "the funds are \"administered, managed and disbursed by the Development Bank of Southern Africa (DBSA)\" on behalf of the SADC Secretariat",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0003",
  "path": "financing.money[0].evidence[0]",
  "source": "S-SADC-PPDF-2021",
  "source_title": "SADC Project Preparation Development Facility continues to support Member States",
  "publisher": "SADC Secretariat",
  "source_tier": "primary",
  "source_url": "https://sadc.int/latest-news/sadc-project-preparation-development-facility-continues-support-member-states",
  "locator": "news item text",
  "says": "the European Union provides 11.5 million euros to the facility",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0003",
  "path": "financing.money[1].evidence[0]",
  "source": "S-SADC-PPDF-2021",
  "source_title": "SADC Project Preparation Development Facility continues to support Member States",
  "publisher": "SADC Secretariat",
  "source_tier": "primary",
  "source_url": "https://sadc.int/latest-news/sadc-project-preparation-development-facility-continues-support-member-states",
  "locator": "news item text",
  "says": "KfW Development Bank provides 10.1 million euros to the facility",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0003",
  "path": "bankability.basis[0]",
  "source": "S-SADC-PPDF-2021",
  "source_title": "SADC Project Preparation Development Facility continues to support Member States",
  "publisher": "SADC Secretariat",
  "source_tier": "primary",
  "source_url": "https://sadc.int/latest-news/sadc-project-preparation-development-facility-continues-support-member-states",
  "locator": "news item text",
  "says": "the facility had \"approved a total of Euro 20 million for the preparation of 13 regional projects\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SADC-P-0003",
  "path": "bankability.basis[1]",
  "source": "S-DBSA-PPDF-MOZISA",
  "source_title": "SADC approves more than US$3m towards regional interconnector project",
  "publisher": "Development Bank of Southern Africa (SADC PPDF site)",
  "source_tier": "primary",
  "source_url": "https://sadcppdf.dbsa.org/article/sadc-approves-more-us3m-towards-regional-interconnector-project",
  "locator": "article text",
  "says": "US$3.5 million, the facility's first allocation, for the \"appointment of a Transaction Advisor to assist SAPP\" on the Mozambique–Zimbabwe–South Africa interconnector, with a bankable feasibility study among the deliverables",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "evidence[0]",
  "source": "S-SAPP-Q-2026Q2",
  "source_title": "SAPP Quarterly Report, April to June 2026 (Issue Q1-2026/27)",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/Q1%20-%20SAPP%20QUARTERLY%20REPORT%20April%20to%20June%202026.pdf",
  "locator": "printed p.13",
  "says": "\"No significant market distortions attributable to outage events were identified during the reporting period.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "evidence[1]",
  "source": "S-SAPP-MR-2026-08",
  "source_title": "SAPP Monthly Report, August 2026 (R08)",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/R08-SAPP%20MONTHLY%20REPORT%20AUGUST%202026.pdf",
  "locator": "printed p.7",
  "says": "\"significant transmission and generator outages were recorded in the ZESA and NTCSA control areas which affected SAPP Trades\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "evidence[2]",
  "source": "S-SAPP-MR-2026-08",
  "source_title": "SAPP Monthly Report, August 2026 (R08)",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/R08-SAPP%20MONTHLY%20REPORT%20AUGUST%202026.pdf",
  "locator": "printed p.6",
  "says": "\"A total of 191.2 GWh was traded in August 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "located_at[0]",
  "source": "S-SAPP-MPR-2025-11",
  "source_title": "SAPP Market Performance Report, November 2025",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20November%202025.pdf",
  "locator": "p.4 (inferred)",
  "says": "\"The primary bottleneck was located along the central corridor, specifically at the interconnectors between Botswana and Zimbabwe, as well as between Zimbabwe and Zambia.\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "located_at[1]",
  "source": "S-SAPP-MPR-2026-01",
  "source_title": "SAPP Market Performance Report, January 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20January%202026.pdf",
  "locator": "p.4 (inferred)",
  "says": "\"The primary bottleneck was located along the central corridor\", at \"the interconnectors between Botswana and Zimbabwe, as well as between Zimbabwe and Zambia.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "located_at[2]",
  "source": "S-SAPP-MPR-2026-03",
  "source_title": "SAPP Market Performance Report, March 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20March%202026_.pdf",
  "locator": "PDF p.3",
  "says": "\"The major bottleneck was on the Zimbabwe – Zambia interconnector.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "located_at[3]",
  "source": "S-SAPP-MPR-2026-06",
  "source_title": "SAPP Market Performance Report, June 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20June%202026.pdf",
  "locator": "p.4 (inferred); same sentence in the April and May reports",
  "says": "\"The primary bottleneck was located along the central corridor, specifically at the interconnectors between Zimbabwe and Zambia.\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "located_at[4]",
  "source": "S-SAPP-MPR-2026-08",
  "source_title": "SAPP Market Performance Report, August 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP-Market-Performance-Report-August-2026.pdf",
  "locator": "printed p.1 / PDF p.2, Outlook",
  "says": "names the \"central corridor\" only; no interconnector",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[0]",
  "source": "S-SAPP-MPR-2025-11",
  "source_title": "SAPP Market Performance Report, November 2025",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20November%202025.pdf",
  "locator": "p.4 (inferred)",
  "says": "",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[1]",
  "source": "S-SAPP-MPR-2025-11",
  "source_title": "SAPP Market Performance Report, November 2025",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20November%202025.pdf",
  "locator": "PDF p.3, Demand and Supply: DAM",
  "says": "",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[2]",
  "source": "S-SAPP-MPR-2026-01",
  "source_title": "SAPP Market Performance Report, January 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20January%202026.pdf",
  "locator": "Impact of Transmission Constraints, p.4 (inferred)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[3]",
  "source": "S-SAPP-MPR-2026-01",
  "source_title": "SAPP Market Performance Report, January 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20January%202026.pdf",
  "locator": "PDF p.3 (headline sentence)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[4]",
  "source": "S-SAPP-MPR-2026-02",
  "source_title": "SAPP Market Performance Report, February 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20February%202026.pdf",
  "locator": "p.4 (inferred)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[5]",
  "source": "S-SAPP-MPR-2026-02",
  "source_title": "SAPP Market Performance Report, February 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20February%202026.pdf",
  "locator": "PDF p.3 (headline sentence)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[6]",
  "source": "S-SAPP-MPR-2026-03",
  "source_title": "SAPP Market Performance Report, March 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20March%202026_.pdf",
  "locator": "p.4 (inferred)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[7]",
  "source": "S-SAPP-MPR-2026-03",
  "source_title": "SAPP Market Performance Report, March 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20March%202026_.pdf",
  "locator": "PDF p.3 (headline sentence)",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[8]",
  "source": "S-SAPP-MPR-2026-04",
  "source_title": "SAPP Market Performance Report, April 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20April%202026.pdf",
  "locator": "p.4 (inferred)",
  "says": "",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[9]",
  "source": "S-SAPP-MPR-2026-05",
  "source_title": "SAPP Market Performance Report, May 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20May%202026.pdf",
  "locator": "p.4 (inferred)",
  "says": "",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[10]",
  "source": "S-SAPP-MPR-2026-05",
  "source_title": "SAPP Market Performance Report, May 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20May%202026.pdf",
  "locator": "p.3 (inferred)",
  "says": "",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[11]",
  "source": "S-SAPP-MPR-2026-06",
  "source_title": "SAPP Market Performance Report, June 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20June%202026.pdf",
  "locator": "p.4 (inferred)",
  "says": "",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[12]",
  "source": "S-SAPP-MPR-2026-08",
  "source_title": "SAPP Market Performance Report, August 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP-Market-Performance-Report-August-2026.pdf",
  "locator": "printed p.3 / PDF p.4, Order Matching and Trading, Total row",
  "says": "",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0001",
  "path": "observations[13]",
  "source": "S-SAPP-MPR-2026-08",
  "source_title": "SAPP Market Performance Report, August 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP-Market-Performance-Report-August-2026.pdf",
  "locator": "printed p.1 / PDF p.2, Outlook",
  "says": "",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0002",
  "path": "evidence[0]",
  "source": "S-SAPP-MPR-2025-11",
  "source_title": "SAPP Market Performance Report, November 2025",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/SAPP%20Market%20Performance%20Report%20-%20November%202025.pdf",
  "locator": "PDF p.5, Outages",
  "says": "\"On November 11 and 13, 2025, there was an outage in the Nampower network that affected the transmission of power from NTCSA to ZESCO and from ZPC to Nampower.\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0003",
  "path": "evidence[0]",
  "source": "S-SAPP-Q-2025Q4",
  "source_title": "SAPP Quarterly Report, October to December 2025",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://sapp.co.zw/sites/default/files/Q3-SAPP%20QUARTERLY%20REPORT%20Oct%20to%20Dec%202025.pdf",
  "locator": "p.9 (by index)",
  "says": "\"11&13 November NamPower Caprivi Link HVDC Converter at Zambezi and Gerus substations to implement control … system modifications required for operation in reduced voltage mode\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0003",
  "path": "evidence[1]",
  "source": "S-SAPP-Q-2026Q1",
  "source_title": "SAPP Quarterly Report, January to March 2026",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/Q4%20-%20SAPP%20QUARTERLY%20REPORT%20Jan%20to%20March%202026.pdf",
  "locator": "p.14",
  "says": "further Gerus-Zambezi HVDC outages on 11 March and 15 to 29 March 2026",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "SAPP-K-0003",
  "path": "evidence[2]",
  "source": "S-SAPP-Q-2026Q2",
  "source_title": "SAPP Quarterly Report, April to June 2026 (Issue Q1-2026/27)",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://www.sapp.co.zw/sites/default/files/Q1%20-%20SAPP%20QUARTERLY%20REPORT%20April%20to%20June%202026.pdf",
  "locator": "p.9",
  "says": "a planned Gerus-Zambezi HVDC outage on 22 July 2026",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-ZA-GBA-WHEELING",
  "source_title": "Electricity wheeling could unlock regional power trade in Southern Africa",
  "publisher": "Green Building Africa",
  "source_tier": "secondary",
  "source_url": "https://www.greenbuildingafrica.co.za/electricity-wheeling-could-unlock-regional-power-trade-in-southern-africa/",
  "locator": "article text",
  "says": "\"Construction is scheduled to begin in 2026, with commercial operations anticipated from 2028.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-SAPP-Q-2025Q4",
  "source_title": "SAPP Quarterly Report, October to December 2025",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://sapp.co.zw/sites/default/files/Q3-SAPP%20QUARTERLY%20REPORT%20Oct%20to%20Dec%202025.pdf",
  "locator": "p.8 (PDF page; printed page may differ)",
  "says": "\"This is expected to relieve transmission congestion in the central corridor.\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-PIDA-ZIZABONA",
  "source_title": "ZiZaBoNa Transmission Project, PIDA project database entry",
  "publisher": "African Union Development Agency (PIDA)",
  "source_tier": "secondary",
  "source_url": "https://map.au-pida.org/projects/show/7270001",
  "locator": "project page, stage field (page carries no update date)",
  "says": "\"S3B: Transaction Support & Financial Close (2019)\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.delivery.evidence[3]",
  "source": "S-PIDA-PROSPECTUS-ZIZABONA",
  "source_title": "Zimbabwe Zambia Botswana Namibia (ZIZABONA) Interconnector Project, PIDA Investment Prospectus",
  "publisher": "African Union Development Agency (PIDA Investment Prospectus)",
  "source_tier": "secondary",
  "source_url": "https://au-pida.org/prospectus/project.php?id=100",
  "locator": "project header and Project Status History",
  "says": "\"Current Stage: Structuring\"; the status history gives \"Structuring\" for 2020, 2022 and 2024",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.delivery.evidence[4]",
  "source": "S-PIDA-PROSPECTUS-ZIZABONA",
  "source_title": "Zimbabwe Zambia Botswana Namibia (ZIZABONA) Interconnector Project, PIDA Investment Prospectus",
  "publisher": "African Union Development Agency (PIDA Investment Prospectus)",
  "source_tier": "secondary",
  "source_url": "https://au-pida.org/prospectus/project.php?id=100",
  "locator": "Latest Implementation Updates",
  "says": "\"2024-01-23: AfDB procured consultancy to update ZIZABONA feasibility & ESIA studies\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.delivery.evidence[5]",
  "source": "S-AFDB-ZIZABONA-AWARD-2024",
  "source_title": "Publication of contract award - ZiZaBoNa Project Preparation Support (PPS) under the Africa Energy Transition Catalyst Program",
  "publisher": "African Development Bank",
  "source_tier": "primary",
  "source_url": "https://www.afdb.org/sites/default/files/documents/project-related-procurement/publication_of_award_-_zizabona_project_preparation_support_pps_002.pdf",
  "locator": "award notice, single page (notice published 19 January 2024; the award date itself is not stated)",
  "says": "\"Name of Consultant Selected: Studio Pietrangeli\"; \"Contract Amount: 384463,51\"; \"Contract Commencement Date: 15/01/2024\"; \"Contract Duration: 12 Months\"; the assignment \"comprises the review of a feasibility study that was completed in 2017; as well as Environmental and Social Impact Assessment (ESIA) studies that were completed in 2012 and 2016.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.delivery.evidence[6]",
  "source": "S-AFDB-RISP-MTR-2024",
  "source_title": "Southern Africa - Joint Regional Integration Strategy Paper 2020-2026, Mid-Term Review and 2023 Regional Portfolio Performance Review Report",
  "publisher": "African Development Bank",
  "source_tier": "primary",
  "source_url": "https://www.afdb.org/sites/default/files/documents/projects-and-operations/southern_africa-joint_regional_integration_strategy_paper_2020-2026_mid-term_review_and_2023_regional_portfolio_performance_review_report.pdf",
  "locator": "PDF p.49 [XIX], indicative operational programme table, row 5 \"ZIZABONA Power Interconnection\"",
  "says": "\"Feasibility and EISA studies completed in 2018 supported with funding from NEPAD IPPF. The studies are being updated with support from the Green Gris Initiative including assessing the project for decarbonization potential. Long lead ESIA studies are expected in early 2025.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.delivery.evidence[7]",
  "source": "S-AFDB-ZM-CSP-2024",
  "source_title": "Zambia - Country Strategy Paper 2024-2029",
  "publisher": "African Development Bank",
  "source_tier": "primary",
  "source_url": "https://www.afdb.org/sites/default/files/documents/projects-and-operations/zambia_-_country_strategy_paper_2024-2029_0.pdf",
  "locator": "PDF p.29 [II], results-based framework, interventions column",
  "says": "\"ZIZABONA 330kV Transmission Line Project A (2026)\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.delivery.evidence[8]",
  "source": "S-ZM-M300-COMPACT",
  "source_title": "National Energy Compact for Zambia (Mission 300)",
  "publisher": "Government of Zambia (hosted by the World Bank)",
  "source_tier": "primary",
  "source_url": "https://www.worldbank.org/content/dam/theworldbankgroupasset/document/2026/m300-energy-compacts/Zambia-M300-AES-Compact.pdf",
  "locator": "PDF p.37, interconnector projects table, row 13",
  "says": "status \"AFDB advertised for consultants to update the feasibility and ESIA reports\", with ZESCO as the responsible office",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.delivery.evidence[9]",
  "source": "S-ZM-M300-COMPACT",
  "source_title": "National Energy Compact for Zambia (Mission 300)",
  "publisher": "Government of Zambia (hosted by the World Bank)",
  "source_tier": "primary",
  "source_url": "https://www.worldbank.org/content/dam/theworldbankgroupasset/document/2026/m300-energy-compacts/Zambia-M300-AES-Compact.pdf",
  "locator": "PDF p.37, interconnector projects table, row 13, Date of Start of Operation",
  "says": "\"2028\" in the column \"Date of Start of Operation\" for the ZIZABONA Interconnector",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.delivery.evidence[10]",
  "source": "S-SARDC-ZIZABONA-2012",
  "source_title": "SADC lures investors for ZiZaBoNa energy project (Southern African News Features, SANF 12 No 28)",
  "publisher": "SARDC (Kizito Sikuka)",
  "source_tier": "secondary",
  "source_url": "https://sardc.net/en/southern-african-news-features/sadc-lures-investors-for-zizabona-energy-project/",
  "locator": "feature text",
  "says": "according to SAPP, \"the project should be ready for implementation between 2014 and 2015\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.funding.evidence[0]",
  "source": "S-SAPP-Q-2025Q4",
  "source_title": "SAPP Quarterly Report, October to December 2025",
  "publisher": "Southern African Power Pool",
  "source_tier": "primary",
  "source_url": "https://sapp.co.zw/sites/default/files/Q3-SAPP%20QUARTERLY%20REPORT%20Oct%20to%20Dec%202025.pdf",
  "locator": "p.7 (PDF page; printed page may differ)",
  "says": "SAPP and ZESA held a technical consultative meeting on 17 December 2025 \"to explore readiness to mobilise financial resources and accelerate investment\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.funding.evidence[1]",
  "source": "S-SARDC-ZIZABONA-2012",
  "source_title": "SADC lures investors for ZiZaBoNa energy project (Southern African News Features, SANF 12 No 28)",
  "publisher": "SARDC (Kizito Sikuka)",
  "source_tier": "secondary",
  "source_url": "https://sardc.net/en/southern-african-news-features/sadc-lures-investors-for-zizabona-energy-project/",
  "locator": "feature text, paragraphs 2 and 4",
  "says": "\"The five investors – the African Development Bank (AfDB), Development Bank of Southern Africa (DBSA), European Investment Bank (EIB), French Development Agency and Stanbic Botswana – pledged more than US$160 million towards the project.\" The pledges were made at \"a recent investor’s roundtable held in Swakopmund, Namibia\".",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.funding.evidence[2]",
  "source": "S-SARDC-ZIZABONA-2012",
  "source_title": "SADC lures investors for ZiZaBoNa energy project (Southern African News Features, SANF 12 No 28)",
  "publisher": "SARDC (Kizito Sikuka)",
  "source_tier": "secondary",
  "source_url": "https://sardc.net/en/southern-african-news-features/sadc-lures-investors-for-zizabona-energy-project/",
  "locator": "feature text, last paragraph",
  "says": "\"Financing and contracting will take place in 2013.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.funding.evidence[3]",
  "source": "S-PIDA-ZIZABONA",
  "source_title": "ZiZaBoNa Transmission Project, PIDA project database entry",
  "publisher": "African Union Development Agency (PIDA)",
  "source_tier": "secondary",
  "source_url": "https://map.au-pida.org/projects/show/7270001",
  "locator": "project page, Comments on finance",
  "says": "\"FUNDING OF APPROXIMATELY USD 34 MILLION HAS BEEN SECURED FOR COMPONENT A FROM THE AFRICAN DEVELOPMENT BANK (AFDB). SAPP IS MOBILISING RESOURCES FOR PROJECT FUNDING FOR COMPONENT B AND C AND IS HAVING DISCUSSIONS WITH THE AFDB IN THIS REGARD.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.funding.evidence[4]",
  "source": "S-PIDA-PROSPECTUS-ZIZABONA",
  "source_title": "Zimbabwe Zambia Botswana Namibia (ZIZABONA) Interconnector Project, PIDA Investment Prospectus",
  "publisher": "African Union Development Agency (PIDA Investment Prospectus)",
  "source_tier": "secondary",
  "source_url": "https://au-pida.org/prospectus/project.php?id=100",
  "locator": "Development, Implementation and Financial Details",
  "says": "\"Project structuring to be completed by 2024, with financial close targeted for 2025.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.funding.evidence[5]",
  "source": "S-ZW-M300-COMPACT",
  "source_title": "National Energy Compact for the Republic of Zimbabwe (Mission 300)",
  "publisher": "Government of Zimbabwe (hosted by the World Bank)",
  "source_tier": "primary",
  "source_url": "https://thedocs.worldbank.org/en/doc/0c714e463c17130c6415ac2ffeafff6d-0010012025/original/Zimbabwe-National-Energy-Compact-Mission-300.pdf",
  "locator": "PDF p.33, Pillar II, Regional Integration",
  "says": "\"Mobilize resources for the implementation of the prioritized Central Transmission Corridor such as MOZISA and ZIZABONA by Q4 2027.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.funding.evidence[6]",
  "source": "S-AFDB-P-Z1-F00-043",
  "source_title": "ZIZABONA Power Interconnection Project (P-Z1-F00-043), project page",
  "publisher": "African Development Bank",
  "source_tier": "primary",
  "source_url": "https://www.afdb.org/en/projects-and-operations/p-z1-f00-043",
  "locator": "project details table",
  "says": "Status Completed; approval date 18-Dec-2012; total cost 1294874.7, currency UAC; implementing agency Southern Africa Power Pool (SAPP)",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.funding.evidence[7]",
  "source": "S-AFDB-ZM-CSP-2024",
  "source_title": "Zambia - Country Strategy Paper 2024-2029",
  "publisher": "African Development Bank",
  "source_tier": "primary",
  "source_url": "https://www.afdb.org/sites/default/files/documents/projects-and-operations/zambia_-_country_strategy_paper_2024-2029_0.pdf",
  "locator": "PDF p.42 [XV], Annex IV, energy operations planned under the previous strategy, row \"P-Z1-FA0-064 Zizabona Power Interconnection Project\" (2019; 17.9, 2.5, 2.5)",
  "says": "\"The Board could not consider this project for approval because infrastructure investments are not eligible under for TSF in Zimbabwe\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "tracks.funding.evidence[8]",
  "source": "S-AFDB-RISP-MTR-2024",
  "source_title": "Southern Africa - Joint Regional Integration Strategy Paper 2020-2026, Mid-Term Review and 2023 Regional Portfolio Performance Review Report",
  "publisher": "African Development Bank",
  "source_tier": "primary",
  "source_url": "https://www.afdb.org/sites/default/files/documents/projects-and-operations/southern_africa-joint_regional_integration_strategy_paper_2020-2026_mid-term_review_and_2023_regional_portfolio_performance_review_report.pdf",
  "locator": "PDF p.49 [XIX], indicative operational programme table, row 5 \"ZIZABONA Power Interconnection\"",
  "says": "\"ZIZABONA Power Interconnection 2023 100 ADF\"; \"Reason for variance with programming year: Zimbabwe is under Bank lending sanction and yet constitutes up to 90% ($55 million) of the Phase I of the project.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "financing.costs[0].cite",
  "source": "S-SARDC-ZIZABONA-2012",
  "source_title": "SADC lures investors for ZiZaBoNa energy project (Southern African News Features, SANF 12 No 28)",
  "publisher": "SARDC (Kizito Sikuka)",
  "source_tier": "secondary",
  "source_url": "https://sardc.net/en/southern-african-news-features/sadc-lures-investors-for-zizabona-energy-project/",
  "locator": "feature text, paragraph 2",
  "says": "\"Total funding requirement is US$223 million, comprising US$67 million equity and US$156 million debt financing.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "financing.costs[1].cite",
  "source": "S-PIDA-ZIZABONA",
  "source_title": "ZiZaBoNa Transmission Project, PIDA project database entry",
  "publisher": "African Union Development Agency (PIDA)",
  "source_tier": "secondary",
  "source_url": "https://map.au-pida.org/projects/show/7270001",
  "locator": "project page, Comments on economics",
  "says": "\"ALL-IN PROJECT FUNDING REQUIREMENT FOR THE FULL ZIZABONA PROJECT, INCL. CONTINGENCIES, OTHER PROJECT COSTS, FINANCING RELATED COSTS, INSURANCE AND WORKING CAPITAL IS ESTIMATED AT US$223M.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "financing.costs[2].cite",
  "source": "S-PIDA-PROSPECTUS-ZIZABONA",
  "source_title": "Zimbabwe Zambia Botswana Namibia (ZIZABONA) Interconnector Project, PIDA Investment Prospectus",
  "publisher": "African Union Development Agency (PIDA Investment Prospectus)",
  "source_tier": "secondary",
  "source_url": "https://au-pida.org/prospectus/project.php?id=100",
  "locator": "project header",
  "says": "\"USD 240.00M\" Total Project Cost",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "financing.costs[3].cite",
  "source": "S-ZM-M300-COMPACT",
  "source_title": "National Energy Compact for Zambia (Mission 300)",
  "publisher": "Government of Zambia (hosted by the World Bank)",
  "source_tier": "primary",
  "source_url": "https://www.worldbank.org/content/dam/theworldbankgroupasset/document/2026/m300-energy-compacts/Zambia-M300-AES-Compact.pdf",
  "locator": "PDF p.37, interconnector projects table, row 13, Investment Costs (USD million)",
  "says": "\"ZIZABONA Interconnector\" with 76 in the column \"Investment Costs (USD million)\" and capacity 700 MVA",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "financing.costs[4].cite",
  "source": "S-AFDB-ZIZABONA-ESIA-2018",
  "source_title": "Zambia-Zimbabwe-Botswana-Namibia Interconnector (ZiZaBoNa) - Phase A - ESIA Summary (project P-Z1-FA0-135)",
  "publisher": "African Development Bank",
  "source_tier": "primary",
  "source_url": "https://www.afdb.org/fileadmin/uploads/afdb/Documents/Environmental-and-Social-Assessments/Zambia-Zimbabwe-Botswana-Namibia_Interconnector__ZiZaBoNa__%E2%80%93_Phase_A_%E2%80%93_ESIA_Summary.pdf",
  "locator": "PDF p.5, project description",
  "says": "\"The estimated project cost is USD29 (UA19.5) million in Zimbabwe and USD3 (UA2.12) million in Zambia, to be further reviewed and updated.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "financing.costs[5].cite",
  "source": "S-AFDB-ZIZABONA-ESIA-2018",
  "source_title": "Zambia-Zimbabwe-Botswana-Namibia Interconnector (ZiZaBoNa) - Phase A - ESIA Summary (project P-Z1-FA0-135)",
  "publisher": "African Development Bank",
  "source_tier": "primary",
  "source_url": "https://www.afdb.org/fileadmin/uploads/afdb/Documents/Environmental-and-Social-Assessments/Zambia-Zimbabwe-Botswana-Namibia_Interconnector__ZiZaBoNa__%E2%80%93_Phase_A_%E2%80%93_ESIA_Summary.pdf",
  "locator": "PDF p.5, project description",
  "says": "\"The estimated project cost is USD29 (UA19.5) million in Zimbabwe and USD3 (UA2.12) million in Zambia, to be further reviewed and updated.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "financing.money[0].evidence[0]",
  "source": "S-PIDA-ZIZABONA",
  "source_title": "ZiZaBoNa Transmission Project, PIDA project database entry",
  "publisher": "African Union Development Agency (PIDA)",
  "source_tier": "secondary",
  "source_url": "https://map.au-pida.org/projects/show/7270001",
  "locator": "project page, Comments on finance",
  "says": "\"FUNDING OF APPROXIMATELY USD 34 MILLION HAS BEEN SECURED FOR COMPONENT A FROM THE AFRICAN DEVELOPMENT BANK (AFDB).\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "financing.money[1].evidence[0]",
  "source": "S-SARDC-ZIZABONA-2012",
  "source_title": "SADC lures investors for ZiZaBoNa energy project (Southern African News Features, SANF 12 No 28)",
  "publisher": "SARDC (Kizito Sikuka)",
  "source_tier": "secondary",
  "source_url": "https://sardc.net/en/southern-african-news-features/sadc-lures-investors-for-zizabona-energy-project/",
  "locator": "feature text, paragraph 2",
  "says": "\"DBSA has indicated that it is willing to contribute US$50 million over a 17-year horizon.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "financing.money[2].evidence[0]",
  "source": "S-SARDC-ZIZABONA-2012",
  "source_title": "SADC lures investors for ZiZaBoNa energy project (Southern African News Features, SANF 12 No 28)",
  "publisher": "SARDC (Kizito Sikuka)",
  "source_tier": "secondary",
  "source_url": "https://sardc.net/en/southern-african-news-features/sadc-lures-investors-for-zizabona-energy-project/",
  "locator": "feature text, paragraph 3",
  "says": "\"The French Development Agency pledged to commit between US$30 million and US$50 million, while the AfDB said it is prepared to pick up 40 percent of the debt financing required.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "bankability.basis[0]",
  "source": "S-AFDB-P-Z1-F00-043",
  "source_title": "ZIZABONA Power Interconnection Project (P-Z1-F00-043), project page",
  "publisher": "African Development Bank",
  "source_tier": "primary",
  "source_url": "https://www.afdb.org/en/projects-and-operations/p-z1-f00-043",
  "locator": "project details table",
  "says": "Status Completed; approval date 18-Dec-2012; total cost 1294874.7, currency UAC; implementing agency Southern Africa Power Pool (SAPP)",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "SAPP-P-0001",
  "path": "bankability.basis[1]",
  "source": "S-AFDB-ZIZABONA-AWARD-2024",
  "source_title": "Publication of contract award - ZiZaBoNa Project Preparation Support (PPS) under the Africa Energy Transition Catalyst Program",
  "publisher": "African Development Bank",
  "source_tier": "primary",
  "source_url": "https://www.afdb.org/sites/default/files/documents/project-related-procurement/publication_of_award_-_zizabona_project_preparation_support_pps_002.pdf",
  "locator": "award notice, single page (notice published 19 January 2024; the award date itself is not stated)",
  "says": "\"Name of Consultant Selected: Studio Pietrangeli\"; \"Contract Amount: 384463,51\"; \"Contract Commencement Date: 15/01/2024\"; \"Contract Duration: 12 Months\"; the assignment \"comprises the review of a feasibility study that was completed in 2017; as well as Environmental and Social Impact Assessment (ESIA) studies that were completed in 2012 and 2016.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0001",
  "path": "tracks.rules.evidence[0]",
  "source": "S-ERERA-PAUSTE-2019",
  "source_title": "Décision N°014/ERERA/19 portant approbation des Procédures d'Accès et d'Utilisation des Services de Transport du Système d'Echanges d'Energie Electrique Ouest Africain (PAUSTE)",
  "publisher": "ECOWAS Regional Electricity Regulatory Authority (ERERA / ARREC); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/decision-no-014-erera-19_approbation-des-pauste.pdf",
  "locator": "decision, PDF p.2 (OCR)",
  "says": "\"Les Procédures d'Accès et d'Utilisation des Services de Transport du Système d'Echanges d'Energie Electrique Ouest Africain (PAUSTE), ci-jointes, sont approuvées par le Conseil de Régulation.\"; \"Fait à Accra, République du Ghana, le 13 décembre 2019\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0001",
  "path": "tracks.rules.evidence[1]",
  "source": "S-ERERA-PAUSTE-2019",
  "source_title": "Décision N°014/ERERA/19 portant approbation des Procédures d'Accès et d'Utilisation des Services de Transport du Système d'Echanges d'Energie Electrique Ouest Africain (PAUSTE)",
  "publisher": "ECOWAS Regional Electricity Regulatory Authority (ERERA / ARREC); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/decision-no-014-erera-19_approbation-des-pauste.pdf",
  "locator": "printed p.98 / PDF p.100 (OCR)",
  "says": "\"Le tableau ci-dessous doit être rempli et mis à jour par l'OSM et approuvé par l'ARREC chaque année et publié (en octobre de chaque année) sur le SIMEOA\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0001",
  "path": "tracks.rules.evidence[2]",
  "source": "S-ERERA-RTTM-2026",
  "source_title": "Regional Transmission Tariff Methodology (RTTM), adopted by Resolution No. 020/ERERA/26",
  "publisher": "ECOWAS Regional Electricity Regulatory Authority (ERERA); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/resolution_020_mttr_en.pdf",
  "locator": "printed p.9 / PDF p.12",
  "says": "\"No cross-border tariff shall be applied; however, the compensation mechanism is established to remunerate the use of a transmission network by users from other networks within the WAPPITS.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0001",
  "path": "tracks.rules.evidence[3]",
  "source": "S-ERERA-RTTM-2026",
  "source_title": "Regional Transmission Tariff Methodology (RTTM), adopted by Resolution No. 020/ERERA/26",
  "publisher": "ECOWAS Regional Electricity Regulatory Authority (ERERA); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/resolution_020_mttr_en.pdf",
  "locator": "printed p.16 / PDF p.19",
  "says": "\"This Regional Transmission Tariff Methodology (RTTM), based on the Average Participation Method (APM), is approved by the ERERA Regulatory Council on 19th of March 2026 and is effective from the said date.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0001",
  "path": "tracks.rules.evidence[4]",
  "source": "S-ERERA-RTTM-2026",
  "source_title": "Regional Transmission Tariff Methodology (RTTM), adopted by Resolution No. 020/ERERA/26",
  "publisher": "ECOWAS Regional Electricity Regulatory Authority (ERERA); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/resolution_020_mttr_en.pdf",
  "locator": "printed p.14 / PDF p.17",
  "says": "\"The NRA shall make provision for the payments to be collected from the National Tariffs or for compensations paid to be offset against National Tariffs.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0001",
  "path": "tracks.rules.evidence[5]",
  "source": "S-ERERA-RETTAP-2026",
  "source_title": "Resolution No. 021/ERERA/26 approving the Regional Electricity Transmission Tariff Application Procedure (RETTAP)",
  "publisher": "ECOWAS Regional Electricity Regulatory Authority (ERERA); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/resolution_021_rettap_en_compressed.pdf",
  "locator": "PDF p.2 (OCR)",
  "says": "\"The Regional Electricity Transmission Tariff Application Procedure (RETTAP), hereby attached, is approved.\"; \"This Resolution shall enter into force from the date of its signature.\"; \"Done in Accra, Ghana , on March 19 , 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0001",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-ERERA-RTTM-2026",
  "source_title": "Regional Transmission Tariff Methodology (RTTM), adopted by Resolution No. 020/ERERA/26",
  "publisher": "ECOWAS Regional Electricity Regulatory Authority (ERERA); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/resolution_020_mttr_en.pdf",
  "locator": "printed p.15 / PDF p.18",
  "says": "\"ERERA shall review and approve the annual values determined in Article 14.1, as submitted by the SMO. The ERERA resolution approving the compensation for the year Y shall set the effective RCPs.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0002",
  "path": "tracks.rules.evidence[0]",
  "source": "S-WAPP-DEC-ICC-2012",
  "source_title": "Decision WAPP/45/DEC.02/11/12 relating to the Transition of WAPP Information and Coordination Center (ICC) to Regional System Market Operator",
  "publisher": "West African Power Pool, General Assembly (seventh session)",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/transition_of_wapp_information_and_coordination_center_icc_to_regional_system_market_operator.pdf",
  "locator": "PDF p.2",
  "says": "\"The Transition of the WAPP Information and Coordination Center (ICC) to Regional System Market Operator towards the establishment of the Regional Electricity market is adopted.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0002",
  "path": "tracks.rules.evidence[1]",
  "source": "S-WAPP-DEC-76-2017",
  "source_title": "Décision EEEOA/76/DEC.03/11/17 portant amendement de la Convention d'établissement de l'EEEOA relatif aux nouvelles attributions du Centre d'Information et de Coordination (CIC) de l'EEEOA en vue de lui permettre d'assurer les fonctions d'opérateur régional du système-marché pendant la 1re phase de mise en œuvre du marché régional de l'énergie électrique",
  "publisher": "West African Power Pool, General Assembly (twelfth session)",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/dec_76_amendement_convention_nvlles_attributions_cic.pdf",
  "locator": "PDF p.4 (OCR)",
  "says": "\"Le Centre d'Information et de Coordination de l'EEEOA (CIC) est un organe du Secrétariat Général chargé de promouvoir la coordination opérationnelle entre les propriétaires et exploitants du réseau de transport a travers un échange d'informations quotidien entre les centres de coordination opérationnelle des Membres de l'ÉEEOA. Le CIC est également chargé, dans le cadre du Marché Régional de l'Electricité, d'assurer les fonctions d'Opérateur du Système - Marché (OSM) conformément aux Régles du Marché Régional.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0002",
  "path": "tracks.rules.evidence[2]",
  "source": "S-ERERA-RETTAP-2026",
  "source_title": "Resolution No. 021/ERERA/26 approving the Regional Electricity Transmission Tariff Application Procedure (RETTAP)",
  "publisher": "ECOWAS Regional Electricity Regulatory Authority (ERERA); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/resolution_021_rettap_en_compressed.pdf",
  "locator": "PDF p.2 (OCR)",
  "says": "\"The Regional Electricity Transmission Tariff Application Procedure (RETTAP) is implemented by the Regional System and Market Operator, under the supervision of ERERA, in accordance with the provisions of the Regional Electricity Market Codes.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0002",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-WAPP-AR-2021",
  "source_title": "Rapport annuel 2021 de l'EEEOA (WAPP 2021 annual report, French edition)",
  "publisher": "West African Power Pool, General Secretariat",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/rapport_annuel_wapp_2021.pdf",
  "locator": "PDF p.29",
  "says": "\"Au sein du Secrétariat Général de l'EEEOA, le Département CIC est en charge des activités liées au Marché Régional de l'Electricité.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0002",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-WAPP-AR-2021",
  "source_title": "Rapport annuel 2021 de l'EEEOA (WAPP 2021 annual report, French edition)",
  "publisher": "West African Power Pool, General Secretariat",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/rapport_annuel_wapp_2021.pdf",
  "locator": "PDF p.31",
  "says": "\"en attendant la mise en service du système de gestion du marché (MMS), le Centre d'Information et de Coordination (CIC) effectue des essais de programmation des contrats bilatéraux sur le Marché. Quinze (15) contrats bilatéraux transfrontaliers sont programmés et confirmés quotidiennement par la Division Clientèle et Marché.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0002",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-BJ-GOUV-CIC-2023",
  "source_title": "Inauguration du Centre d'information et de Coordination du WAPP au Bénin : Le marché régional unifié de l'électricité désormais une réalité en Afrique de l'ouest",
  "publisher": "Government of the Republic of Benin (gouv.bj)",
  "source_tier": "primary",
  "source_url": "https://www.gouv.bj/article/2449/inauguration-centre-information-coordination-wapp-benin-marche-regional-unifie-electricite-desormais-realite-afrique-ouest/",
  "locator": "article text, first paragraph",
  "says": "\"Le Bénin est depuis ce vendredi 17 novembre 2023, la capitale des échanges d'énergie électrique entre 15 pays membres de la CEDEAO.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "tracks.legal.evidence[0]",
  "source": "S-ECOWAS-DIR-2-12-18",
  "source_title": "Directive C/DIR/2/12/18 on the Securitization of the Cross-Border Power Trade under the Regional Electricity Market",
  "publisher": "ECOWAS Council of Ministers (81st ordinary session, Abuja, 13 to 15 December 2018); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/directive-on-the-securitization-of-the-cross-border-power-trade-under-the-regional-electricity-market-2-1.pdf",
  "locator": "PDF p.10 (OCR)",
  "says": "\"This Directive shall enter into force on the date of its signature by the Chairperson of the Council of Ministers and shall be published in the Official Journal of the Community within thirty (30) days of its signature.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "tracks.legal.evidence[1]",
  "source": "S-ECOWAS-DIR-2-12-18",
  "source_title": "Directive C/DIR/2/12/18 on the Securitization of the Cross-Border Power Trade under the Regional Electricity Market",
  "publisher": "ECOWAS Council of Ministers (81st ordinary session, Abuja, 13 to 15 December 2018); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/directive-on-the-securitization-of-the-cross-border-power-trade-under-the-regional-electricity-market-2-1.pdf",
  "locator": "PDF p.3 (OCR)",
  "says": "\"NOTING that cross-border electricity trade among WAPP member utilities has led, in some cases, to accumulations of substantial payment arrears to electricity suppliers, resulting in Governments' intervention for clearance of their debt arrears;\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "tracks.legal.evidence[2]",
  "source": "S-ECOWAS-DIR-2-12-18",
  "source_title": "Directive C/DIR/2/12/18 on the Securitization of the Cross-Border Power Trade under the Regional Electricity Market",
  "publisher": "ECOWAS Council of Ministers (81st ordinary session, Abuja, 13 to 15 December 2018); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/directive-on-the-securitization-of-the-cross-border-power-trade-under-the-regional-electricity-market-2-1.pdf",
  "locator": "PDF p.7 (OCR; item numerals garbled in the scan)",
  "says": "\"adopting escrow accounts that ring-fence utility revenues, accompanied with ‘cascade or waterfall’ payment mechanisms that clarify the priority of payment of electricity creditors in situations of cash shortfall\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "tracks.legal.evidence[3]",
  "source": "S-ECOWAS-DIR-2-12-18",
  "source_title": "Directive C/DIR/2/12/18 on the Securitization of the Cross-Border Power Trade under the Regional Electricity Market",
  "publisher": "ECOWAS Council of Ministers (81st ordinary session, Abuja, 13 to 15 December 2018); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/directive-on-the-securitization-of-the-cross-border-power-trade-under-the-regional-electricity-market-2-1.pdf",
  "locator": "PDF p.7 (OCR; item numerals garbled in the scan)",
  "says": "\"introducing mechanism of payments guarantees with the involvement of the Technical and Financial Partners (TFP) for the benefit of the electricity supplier;\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "tracks.legal.evidence[4]",
  "source": "S-ECOWAS-DIR-2-12-18",
  "source_title": "Directive C/DIR/2/12/18 on the Securitization of the Cross-Border Power Trade under the Regional Electricity Market",
  "publisher": "ECOWAS Council of Ministers (81st ordinary session, Abuja, 13 to 15 December 2018); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/directive-on-the-securitization-of-the-cross-border-power-trade-under-the-regional-electricity-market-2-1.pdf",
  "locator": "PDF p.9 (OCR)",
  "says": "\"providing and enforcing a contractual template for the bilateral exchange of electricity between Member States that defines the conditions of power supply (firm, semi-firm or interruptible), incorporates suitable measures for sanctioning non-payment (through graduated disconnection) as well as non-delivery (through financial penalties that compensate the importer for back-up generation), and includes standard commercial bank guarantees backed-up by multilateral guarantees;\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "tracks.legal.evidence[5]",
  "source": "S-ECOWAS-DIR-2-12-18",
  "source_title": "Directive C/DIR/2/12/18 on the Securitization of the Cross-Border Power Trade under the Regional Electricity Market",
  "publisher": "ECOWAS Council of Ministers (81st ordinary session, Abuja, 13 to 15 December 2018); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/directive-on-the-securitization-of-the-cross-border-power-trade-under-the-regional-electricity-market-2-1.pdf",
  "locator": "PDF p.9 (OCR)",
  "says": "\"Member States shall adopt Legislative, Regulatory and Administrative Provisions required to enforce compliance with this Directive at the latest by 1st January 2020.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-ECOWAS-DIR-2-12-18",
  "source_title": "Directive C/DIR/2/12/18 on the Securitization of the Cross-Border Power Trade under the Regional Electricity Market",
  "publisher": "ECOWAS Council of Ministers (81st ordinary session, Abuja, 13 to 15 December 2018); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/directive-on-the-securitization-of-the-cross-border-power-trade-under-the-regional-electricity-market-2-1.pdf",
  "locator": "PDF p.9 (OCR)",
  "says": "\"monitoring the compliance of Member States with the provisions of this Directive and regularly publishing information regarding the state of adoption of these measures.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-WAPP-AR-2021",
  "source_title": "Rapport annuel 2021 de l'EEEOA (WAPP 2021 annual report, French edition)",
  "publisher": "West African Power Pool, General Secretariat",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/rapport_annuel_wapp_2021.pdf",
  "locator": "PDF p.13",
  "says": "\"Il devait s'en suivre des réflexions sur la mise en place d'un Fonds Renouvelable de Soutien aux Liquidités (FRSL) qui est un système de garantie collective destiné à encourager le bon comportement des acteurs du Marché Régional de l'Electricité et à promouvoir le respect des termes et conditions des contrats d'achat et de fourniture d'électricité. Un Groupe de Travail a été mis en place pour conduire ces réflexions.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-WB-RESULTS-WA-2026",
  "source_title": "Accès à l'électricité en Afrique de l'Ouest : le pari réussi de l'intégration régionale (results story)",
  "publisher": "World Bank",
  "source_tier": "secondary",
  "source_url": "https://www.banquemondiale.org/fr/results/2026/05/11/connecting-west-africa-through-regional-power-integration-and-expanded-electricity-access",
  "locator": "section on the programme's next steps",
  "says": "\"Pour renforcer la confiance dans les échanges d'énergie, le programme mettra également en place un fonds renouvelable de renforcement de la liquidité, garantissant la ponctualité des paiements, en complément de réformes nationales visant à consolider la viabilité financière des compagnies d'électricité.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "bankability.basis[0]",
  "source": "S-ECOWAS-DIR-2-12-18",
  "source_title": "Directive C/DIR/2/12/18 on the Securitization of the Cross-Border Power Trade under the Regional Electricity Market",
  "publisher": "ECOWAS Council of Ministers (81st ordinary session, Abuja, 13 to 15 December 2018); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/directive-on-the-securitization-of-the-cross-border-power-trade-under-the-regional-electricity-market-2-1.pdf",
  "locator": "PDF p.7 (OCR; item numerals garbled in the scan)",
  "says": "\"adopting escrow accounts that ring-fence utility revenues, accompanied with ‘cascade or waterfall’ payment mechanisms that clarify the priority of payment of electricity creditors in situations of cash shortfall\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "bankability.basis[1]",
  "source": "S-ECOWAS-DIR-2-12-18",
  "source_title": "Directive C/DIR/2/12/18 on the Securitization of the Cross-Border Power Trade under the Regional Electricity Market",
  "publisher": "ECOWAS Council of Ministers (81st ordinary session, Abuja, 13 to 15 December 2018); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/directive-on-the-securitization-of-the-cross-border-power-trade-under-the-regional-electricity-market-2-1.pdf",
  "locator": "PDF p.7 (OCR; item numerals garbled in the scan)",
  "says": "\"introducing mechanism of payments guarantees with the involvement of the Technical and Financial Partners (TFP) for the benefit of the electricity supplier;\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "bankability.basis[2]",
  "source": "S-ECOWAS-DIR-2-12-18",
  "source_title": "Directive C/DIR/2/12/18 on the Securitization of the Cross-Border Power Trade under the Regional Electricity Market",
  "publisher": "ECOWAS Council of Ministers (81st ordinary session, Abuja, 13 to 15 December 2018); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/directive-on-the-securitization-of-the-cross-border-power-trade-under-the-regional-electricity-market-2-1.pdf",
  "locator": "PDF p.9 (OCR)",
  "says": "\"providing and enforcing a contractual template for the bilateral exchange of electricity between Member States that defines the conditions of power supply (firm, semi-firm or interruptible), incorporates suitable measures for sanctioning non-payment (through graduated disconnection) as well as non-delivery (through financial penalties that compensate the importer for back-up generation), and includes standard commercial bank guarantees backed-up by multilateral guarantees;\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "bankability.basis[3]",
  "source": "S-WAPP-AR-2021",
  "source_title": "Rapport annuel 2021 de l'EEEOA (WAPP 2021 annual report, French edition)",
  "publisher": "West African Power Pool, General Secretariat",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/rapport_annuel_wapp_2021.pdf",
  "locator": "PDF p.13",
  "says": "\"Il devait s'en suivre des réflexions sur la mise en place d'un Fonds Renouvelable de Soutien aux Liquidités (FRSL) qui est un système de garantie collective destiné à encourager le bon comportement des acteurs du Marché Régional de l'Electricité et à promouvoir le respect des termes et conditions des contrats d'achat et de fourniture d'électricité. Un Groupe de Travail a été mis en place pour conduire ces réflexions.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0003",
  "path": "bankability.risk_and_cost[0]",
  "source": "S-ECOWAS-DIR-2-12-18",
  "source_title": "Directive C/DIR/2/12/18 on the Securitization of the Cross-Border Power Trade under the Regional Electricity Market",
  "publisher": "ECOWAS Council of Ministers (81st ordinary session, Abuja, 13 to 15 December 2018); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/directive-on-the-securitization-of-the-cross-border-power-trade-under-the-regional-electricity-market-2-1.pdf",
  "locator": "PDF p.3 (OCR)",
  "says": "the directive's preamble notes that cross-border trade had in some cases led to substantial payment arrears and to governments intervening to clear them",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0004",
  "path": "tracks.rules.evidence[0]",
  "source": "S-ECOWAS-DIR-2-12-18",
  "source_title": "Directive C/DIR/2/12/18 on the Securitization of the Cross-Border Power Trade under the Regional Electricity Market",
  "publisher": "ECOWAS Council of Ministers (81st ordinary session, Abuja, 13 to 15 December 2018); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/directive-on-the-securitization-of-the-cross-border-power-trade-under-the-regional-electricity-market-2-1.pdf",
  "locator": "PDF p.2 (OCR)",
  "says": "\"CONSIDERING that the ERERA Regulatory Council has, through Resolution N°012/ERERA/18 of 22 June 2018, formally launched Phase 1 of ECOWAS Regional Electricity Market as of 29 June 2018;\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0004",
  "path": "tracks.rules.evidence[1]",
  "source": "S-ERERA-RETTAP-2026",
  "source_title": "Resolution No. 021/ERERA/26 approving the Regional Electricity Transmission Tariff Application Procedure (RETTAP)",
  "publisher": "ECOWAS Regional Electricity Regulatory Authority (ERERA); copy hosted by WAPP",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/resolution_021_rettap_en_compressed.pdf",
  "locator": "PDF p.1 (OCR)",
  "says": "\"MINDFUL of Resolution No. 018/ERERA/25 of 13 September 2025 approving the Regional Electricity Market Codes of West Africa (REMC-WA);\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0004",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-WAPP-AR-2021",
  "source_title": "Rapport annuel 2021 de l'EEEOA (WAPP 2021 annual report, French edition)",
  "publisher": "West African Power Pool, General Secretariat",
  "source_tier": "primary",
  "source_url": "https://www.ecowapp.org/sites/default/files/rapport_annuel_wapp_2021.pdf",
  "locator": "PDF p.31",
  "says": "\"Le groupe de travail technique EEEOA/ARREC a tenu du 06 au 08 avril 2021 à Accra une réunion de concertations pour définir les actions nécessaires au meilleur fonctionnement du Marché Régional. Au cours de cette rencontre, les premiers responsables ont convenu que le lancement de la Phase 2 du Marché Régional devrait intervenir dans un ou deux ans\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0004",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-WB-RESULTS-WA-2026",
  "source_title": "Accès à l'électricité en Afrique de l'Ouest : le pari réussi de l'intégration régionale (results story)",
  "publisher": "World Bank",
  "source_tier": "secondary",
  "source_url": "https://www.banquemondiale.org/fr/results/2026/05/11/connecting-west-africa-through-regional-power-integration-and-expanded-electricity-access",
  "locator": "section on the World Bank's approach",
  "says": "\"Fin 2025, les organismes de réglementation ont validé les tarifs du DAM\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0004",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-WB-RESULTS-WA-2026",
  "source_title": "Accès à l'électricité en Afrique de l'Ouest : le pari réussi de l'intégration régionale (results story)",
  "publisher": "World Bank",
  "source_tier": "secondary",
  "source_url": "https://www.banquemondiale.org/fr/results/2026/05/11/connecting-west-africa-through-regional-power-integration-and-expanded-electricity-access",
  "locator": "section on the World Bank's approach, same sentence",
  "says": "\"Fin 2025, [...] le WAPP a réalisé le premier essai de synchronisation avec des flux d'électricité ininterrompus à travers douze pays d'Afrique de l'Ouest.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "WAPP-R-0004",
  "path": "tracks.delivery.evidence[3]",
  "source": "S-WB-RESULTS-WA-2026",
  "source_title": "Accès à l'électricité en Afrique de l'Ouest : le pari réussi de l'intégration régionale (results story)",
  "publisher": "World Bank",
  "source_tier": "secondary",
  "source_url": "https://www.banquemondiale.org/fr/results/2026/05/11/connecting-west-africa-through-regional-power-integration-and-expanded-electricity-access",
  "locator": "results list, item on the regional market's launch (story published 11 May 2026)",
  "says": "\"Un nouveau marché « day-ahead » (DAM) est en cours de lancement, qui permettra aux compagnies d'acheter l'énergie dont elles ont besoin pour le lendemain à moindre coût\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-K-0001",
  "path": "evidence[0]",
  "source": "S-EWN-BMA-BEITBRIDGE-2026",
  "source_title": "BMA blames Zimbabwean bottlenecks for freight truck delays at Beitbridge",
  "publisher": "Eyewitness News, Puleng Maake",
  "source_tier": "secondary",
  "source_url": "https://www.ewn.co.za/2026/07/26/bma-blames-zimbabwean-bottlenecks-for-freight-truck-delays-at-beitbridge",
  "locator": "article text",
  "says": "the BMA attributes the July 2026 queues to \"congestion on the Zimbabwean side of the border\"; Zimbabwean authorities cited limited parking, abnormal loads occupying bays and slower processing by clearing agents",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-K-0001",
  "path": "evidence[1]",
  "source": "S-NZ-ZIMRA-BEITBRIDGE-2026",
  "source_title": "Zimbabwe: ZIMRA Moves to Clear Beitbridge Truck Backlog As Border Congestion Persists (New Zimbabwe, via allAfrica)",
  "publisher": "New Zimbabwe / allAfrica",
  "source_tier": "secondary",
  "source_url": "https://allafrica.com/stories/202607280030.html",
  "locator": "article text",
  "says": "in the reporter's words ZIMRA \"says it is working urgently to clear heavy congestion at the Beitbridge Border Post\", and the cause was \"a combination of operational challenges affecting cargo processing on the Zimbabwean side\"; ZIMRA is quoted directly: \"ZIMRA is working with all border agencies to expedite cargo processing and restore normal traffic flow\" and \"We expect the backlog to be largely cleared within the next 24 hours, provided operating conditions remain stable\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-K-0001",
  "path": "observations[0]",
  "source": "S-SADC-BEITBRIDGE-2025",
  "source_title": "SADC conducts assessment study at Beitbridge border post connecting Zimbabwe and South Africa",
  "publisher": "SADC Secretariat",
  "source_tier": "primary",
  "source_url": "https://sadc.int/latest-news/sadc-conducts-assessment-study-beitbridge-border-post-connecting-zimbabwe-and-south",
  "locator": "news item text",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-K-0001",
  "path": "observations[1]",
  "source": "S-FN-BEITBRIDGE-2026-07",
  "source_title": "Beitbridge delays worsen",
  "publisher": "Freight News",
  "source_tier": "secondary",
  "source_url": "https://www.freightnews.co.za/article/beitbridge-delays-worsen",
  "locator": "article text",
  "says": "",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-P-0001",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-ZA-SANEWS-BMA-2026",
  "source_title": "BMA announces successful bidders for major border overhaul",
  "publisher": "SAnews (South African Government News Agency)",
  "source_tier": "primary",
  "source_url": "https://www.sanews.gov.za/south-africa/bma-announces-successful-bidders-major-border-overhaul",
  "locator": "article text",
  "says": "the Border Management Authority named bidders for Beitbridge and Oshoek (Baobab Concession), Lebombo (Raulux Consortium), Maseru Bridge (Kgorong Consortium), Kopfontein (Kopfontein Consortium) and Ficksburg Bridge (Imbani Consortium)",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZAF-P-0001",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-ZA-SANEWS-BMA-2026",
  "source_title": "BMA announces successful bidders for major border overhaul",
  "publisher": "SAnews (South African Government News Agency)",
  "source_tier": "primary",
  "source_url": "https://www.sanews.gov.za/south-africa/bma-announces-successful-bidders-major-border-overhaul",
  "locator": "article text",
  "says": "\"construction will begin later this year or early next year for some ports\", with a \"phased rollout\" over \"about a two-to-three-year period\" (about three years at Beitbridge and Lebombo)",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-P-0001",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-ZA-SANEWS-BMA-2026",
  "source_title": "BMA announces successful bidders for major border overhaul",
  "publisher": "SAnews (South African Government News Agency)",
  "source_tier": "primary",
  "source_url": "https://www.sanews.gov.za/south-africa/bma-announces-successful-bidders-major-border-overhaul",
  "locator": "article text, remarks of the BMA Commissioner",
  "says": "the upgrades would allow the implementation of the One-Stop Border Post model, \"improving efficiency and coordination with neighbouring countries\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-P-0001",
  "path": "financing.costs[0].cite",
  "source": "S-ZA-OV-Q1-2627",
  "source_title": "Operation Vulindlela progress report, Q1 2026/27",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/press/2026/Operation%20Vulindlela%20Progress%20Report%20Q1%20-%202026.pdf",
  "locator": "p.19, Reform 4",
  "says": "\"The R12.5 billion Public-Private Partnership marks the largest-ever investment\" in the land ports",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.legal.evidence[0]",
  "source": "S-ZA-PROC-236",
  "source_title": "Proclamation Notice 236 of 2024, commencement of the Electricity Regulation Amendment Act 38 of 2024",
  "publisher": "Government of South Africa, Government Gazette 51778",
  "source_tier": "primary",
  "source_url": "https://www.gov.za/sites/default/files/gcis_document/202412/51778pro236.pdf",
  "locator": "operative paragraph, PDF p.1 / printed Gazette p.3",
  "says": "the Act commenced on 1 January 2025, except the section 1 amendments to the definitions of \"reticulation\" and \"distribution power systems\", which await a later proclamation",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.legal.evidence[1]",
  "source": "S-ZA-NERSA-MO-2025",
  "source_title": "NERSA approves Market Operator licence for NTCSA and establishment of Electricity Market Advisory Forum (media statement)",
  "publisher": "National Energy Regulator of South Africa",
  "source_tier": "primary",
  "source_url": "https://www.nersa.org.za/files/files/2025/11/UpdatedMediastatement-NERSAapprovesMarketOperatorlicenceandestablishementofEMAFandGCAR.pdf",
  "locator": "media statement, p.1",
  "says": "\"a series of landmark decisions by the Energy Regulator on 27 November 2025\"; \"the approval of the Market Operator licence for the NTCSA\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[0]",
  "source": "S-ZA-OV-Q3-2526",
  "source_title": "Operation Vulindlela Phase II, Q3 2025/26 progress report",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/speeches/2026/Operation%20Vulindlela%20Q3%20Report%202026.pdf",
  "locator": "printed p.5 / PDF p.9, Next Steps",
  "says": "\"Submit the Market Code to NERSA for approval\" (February 2026)",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[1]",
  "source": "S-ZA-GBA-MARKETCODE",
  "source_title": "Report on NERSA's consultation on the Market Code and Market Rules",
  "publisher": "Green Building Africa",
  "source_tier": "secondary",
  "source_url": "https://www.greenbuildingafrica.co.za/nersa-extends-deadline-for-comments-on-south-africas-electricity-market-code-and-rules/",
  "locator": "article text",
  "says": "\"The Market Code and Market Rules application was formally submitted to NERSA by NTCSA on 25 February 2026.\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[2]",
  "source": "S-ZA-EN-SAWEM-DELAY",
  "source_title": "Launch of SAWEM delayed, but NTCSA says preparations are well advanced",
  "publisher": "Engineering News",
  "source_tier": "secondary",
  "source_url": "https://www.engineeringnews.co.za/article/launch-of-sawem-delayed-but-ntcsa-says-preparations-are-well-advanced-2026-04-10",
  "locator": "article text",
  "says": "NTCSA confirmed that \"the Market Code was formally submitted to Nersa for approval on February 25.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[3]",
  "source": "S-ZA-NERSA-CP-2026",
  "source_title": "Consultation Paper on the Market Code and Rules submitted by NTCSA",
  "publisher": "National Energy Regulator of South Africa",
  "source_tier": "primary",
  "source_url": "https://sapvia.co.za/wp-content/uploads/2026/05/Consultation-Paper-on-Market-Code-and-Rules.pdf",
  "locator": "PDF p.4; Table 2, PDF p.26",
  "says": "Table 2 dates the paper's publication 28 April 2026.",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[4]",
  "source": "S-ZA-NERSA-CP-2026",
  "source_title": "Consultation Paper on the Market Code and Rules submitted by NTCSA",
  "publisher": "National Energy Regulator of South Africa",
  "source_tier": "primary",
  "source_url": "https://sapvia.co.za/wp-content/uploads/2026/05/Consultation-Paper-on-Market-Code-and-Rules.pdf",
  "locator": "PDF p.4",
  "says": "\"The deadline for the submission of comments is 29 May 2026.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[5]",
  "source": "S-ZA-NERSA-CP-2026",
  "source_title": "Consultation Paper on the Market Code and Rules submitted by NTCSA",
  "publisher": "National Energy Regulator of South Africa",
  "source_tier": "primary",
  "source_url": "https://sapvia.co.za/wp-content/uploads/2026/05/Consultation-Paper-on-Market-Code-and-Rules.pdf",
  "locator": "Table 2, PDF p.26 (printed \"Page 26 of 27\")",
  "says": "NERSA's timetable row \"ER Approval the Market Code Submission | 31 July 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[6]",
  "source": "S-ZA-OV-Q1-2627",
  "source_title": "Operation Vulindlela progress report, Q1 2026/27",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/press/2026/Operation%20Vulindlela%20Progress%20Report%20Q1%20-%202026.pdf",
  "locator": "p.6-7",
  "says": "NERSA \"published a revised version of the Electricity Trading Rules as well as the Market Code ... for public comment\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[7]",
  "source": "S-ZA-EN-HEARING",
  "source_title": "SAETA urges timely finalisation of electricity market rules to unlock investment, competition",
  "publisher": "Engineering News (Sabrina Jardim)",
  "source_tier": "secondary",
  "source_url": "https://engineeringnews.co.za/article/saeta-urges-timely-finalisation-of-electricity-market-rules-to-unlock-investment-competition-2026-07-06",
  "locator": "article text (about para. 5)",
  "says": "the draft market code \"received broad support during a public hearing on July 1\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[8]",
  "source": "S-ZA-EN-HEARING",
  "source_title": "SAETA urges timely finalisation of electricity market rules to unlock investment, competition",
  "publisher": "Engineering News (Sabrina Jardim)",
  "source_tier": "secondary",
  "source_url": "https://engineeringnews.co.za/article/saeta-urges-timely-finalisation-of-electricity-market-rules-to-unlock-investment-competition-2026-07-06",
  "locator": "article text (about paras. 8 and 11)",
  "says": "NERSA \"has published for public consultation revised trading rules\", which govern bilateral trading outside SAWEM; \"Public comments ... close on July 27.\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[9]",
  "source": "S-ZA-SQ-TR-EXT1",
  "source_title": "NERSA extends public consultation deadline for South Africa's draft electricity trading rules to August 28, 2026",
  "publisher": "SolarQuarter",
  "source_tier": "secondary",
  "source_url": "https://solarquarter.com/2026/07/16/nersa-extends-public-consultation-deadline-for-south-africas-draft-electricity-trading-rules-to-august-28-2026/",
  "locator": "article text",
  "says": "\"The original closing date of July 29, 2026, has now been moved to Friday, August 28, 2026.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[10]",
  "source": "S-ZA-SQ-TR-EXT",
  "source_title": "NERSA extends deadline for comments on revised electricity trading rules in South Africa",
  "publisher": "SolarQuarter",
  "source_tier": "secondary",
  "source_url": "https://solarquarter.com/2026/08/31/nersa-extends-deadline-for-comments-on-revised-electricity-trading-rules-in-south-africa/",
  "locator": "article text",
  "says": "\"NERSA announced on August 26\" that the comment deadline, \"initially August 28, 2026\", was extended, so that the rules can be reviewed alongside the Electricity Pricing Policy",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[11]",
  "source": "S-ZA-SQ-TR-EXT",
  "source_title": "NERSA extends deadline for comments on revised electricity trading rules in South Africa",
  "publisher": "SolarQuarter",
  "source_tier": "secondary",
  "source_url": "https://solarquarter.com/2026/08/31/nersa-extends-deadline-for-comments-on-revised-electricity-trading-rules-in-south-africa/",
  "locator": "article text",
  "says": "the new deadline is \"Monday, September 28, 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[12]",
  "source": "S-ZA-EN-HEARING",
  "source_title": "SAETA urges timely finalisation of electricity market rules to unlock investment, competition",
  "publisher": "Engineering News (Sabrina Jardim)",
  "source_tier": "secondary",
  "source_url": "https://engineeringnews.co.za/article/saeta-urges-timely-finalisation-of-electricity-market-rules-to-unlock-investment-competition-2026-07-06",
  "locator": "article text (about para. 12)",
  "says": "according to SAETA's account of NERSA's indicative timelines, \"both the market code and the trading rules are expected to be finalised during August\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[13]",
  "source": "S-ZA-OV-Q1-2627",
  "source_title": "Operation Vulindlela progress report, Q1 2026/27",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/press/2026/Operation%20Vulindlela%20Progress%20Report%20Q1%20-%202026.pdf",
  "locator": "p.7, Next Steps",
  "says": "\"Finalise the Electricity Trading Rules and Market Code following submission of public comments\" (September 2026)",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[14]",
  "source": "S-ZA-TC-AUTOTRADE",
  "source_title": "Nersa wants five-year ban on automated electricity trading",
  "publisher": "TechCentral",
  "source_tier": "secondary",
  "source_url": "https://techcentral.co.za/nersa-ban-automated-electricity-trading/286941/",
  "locator": "article text (published 6 October 2026)",
  "says": "\"Rules for bilateral electricity trading are also still in flux.\" \"They have still not been finalised.\" (The state of the rules when the article was published; no milestone happened on that date.)",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[15]",
  "source": "S-ZA-NERSA-TPF-NOTICE",
  "source_title": "Invitation for written stakeholder comments and public hearing on the electricity trading platform regulatory framework",
  "publisher": "National Energy Regulator of South Africa",
  "source_tier": "primary",
  "source_url": "https://www.nersa.org.za/file/9558/MarkettradingPlatform_Notice.pdf",
  "locator": "title and date as listed on NERSA's homepage (the notice PDF could not be fetched)",
  "says": "\"Invitation for written stakeholder comments and public hearing on the electricity trading platform regulatory framework\", listed with the date 4 October 2026",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.rules.evidence[16]",
  "source": "S-ZA-GBA-TPF",
  "source_title": "NERSA opens consultation on electricity trading platform framework",
  "publisher": "Green Building Africa",
  "source_tier": "secondary",
  "source_url": "https://www.greenbuildingafrica.co.za/nersa-opens-consultation-on-electricity-trading-platform-framework/",
  "locator": "article text",
  "says": "written comments close on 31 October 2026, and a virtual public hearing is scheduled for 19 November 2026",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-ZA-OV-Q1-2627",
  "source_title": "Operation Vulindlela progress report, Q1 2026/27",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/press/2026/Operation%20Vulindlela%20Progress%20Report%20Q1%20-%202026.pdf",
  "locator": "p.6",
  "says": "\"the internal launch of SAWEM, now operating with 32 participants\"; internal trading launched in April 2026",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-ZA-OV-Q1-2627",
  "source_title": "Operation Vulindlela progress report, Q1 2026/27",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/press/2026/Operation%20Vulindlela%20Progress%20Report%20Q1%20-%202026.pdf",
  "locator": "p.6; p.7 roadmap",
  "says": "\"the successful launch of external trading in early 2027\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-ZA-PQ-NW3909",
  "source_title": "Written reply to parliamentary question NW3909 (Ms N S Sompa-Masiu), Minister of Electricity and Energy",
  "publisher": "National Assembly (reply text as published by the Parliamentary Monitoring Group)",
  "source_tier": "primary",
  "source_url": "https://pmg.org.za/committee-question/39762/",
  "locator": "reply text",
  "says": "\"phased introduction of limited external market participants from the second quarter of 2027\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.delivery.evidence[3]",
  "source": "S-ZA-PQ-NW3909",
  "source_title": "Written reply to parliamentary question NW3909 (Ms N S Sompa-Masiu), Minister of Electricity and Energy",
  "publisher": "National Assembly (reply text as published by the Parliamentary Monitoring Group)",
  "source_tier": "primary",
  "source_url": "https://pmg.org.za/committee-question/39762/",
  "locator": "reply text",
  "says": "\"a fully functional competitive wholesale electricity market by approximately 2030\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0001",
  "path": "tracks.delivery.evidence[4]",
  "source": "S-ZA-MW-SAWEM-SURV",
  "source_title": "NTCSA setting up market surveillance unit as part of preparations for SAWEM launch in April",
  "publisher": "Mining Weekly (Engineering News group)",
  "source_tier": "secondary",
  "source_url": "https://www.miningweekly.com/article/ntcsa-setting-up-market-surveillance-unit-as-part-of-preparations-for-sawem-launch-in-april-2026-09-30",
  "locator": "article text",
  "says": "\"SAWEM is scheduled to begin operating in April 2027\"; \"the market's formal launch was delayed from April 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0002",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-ZA-SANEWS-ITP",
  "source_title": "Update on Independent Transmission Projects programme",
  "publisher": "SAnews (South African Government News Agency)",
  "source_tier": "primary",
  "source_url": "https://www.sanews.gov.za/node/84692",
  "locator": "article text",
  "says": "a second draft RFP goes to \"the seven ITP PQBs\" before the end of 2026",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0002",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-ZA-SANEWS-ITP",
  "source_title": "Update on Independent Transmission Projects programme",
  "publisher": "SAnews (South African Government News Agency)",
  "source_tier": "primary",
  "source_url": "https://www.sanews.gov.za/node/84692",
  "locator": "article text",
  "says": "\"The final RFP is targeted for release in quarter 2 of the 2027 calendar year.\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0002",
  "path": "tracks.funding.evidence[0]",
  "source": "S-ZA-SANEWS-ITP",
  "source_title": "Update on Independent Transmission Projects programme",
  "publisher": "SAnews (South African Government News Agency)",
  "source_tier": "primary",
  "source_url": "https://www.sanews.gov.za/node/84692",
  "locator": "article text",
  "says": "\"The CGV was registered and incorporated on 12 August 2026.\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0002",
  "path": "tracks.funding.evidence[1]",
  "source": "S-ZA-SANEWS-ITP",
  "source_title": "Update on Independent Transmission Projects programme",
  "publisher": "SAnews (South African Government News Agency)",
  "source_tier": "primary",
  "source_url": "https://www.sanews.gov.za/node/84692",
  "locator": "article text",
  "says": "\"a binding CGV term sheet by the end of the first quarter of 2027\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0002",
  "path": "bankability.basis[0]",
  "source": "S-ZA-SANEWS-ITP",
  "source_title": "Update on Independent Transmission Projects programme",
  "publisher": "SAnews (South African Government News Agency)",
  "source_tier": "primary",
  "source_url": "https://www.sanews.gov.za/node/84692",
  "locator": "article text",
  "says": "\"The CGV was registered and incorporated on 12 August 2026.\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0002",
  "path": "bankability.basis[1]",
  "source": "S-ZA-SANEWS-ITP",
  "source_title": "Update on Independent Transmission Projects programme",
  "publisher": "SAnews (South African Government News Agency)",
  "source_tier": "primary",
  "source_url": "https://www.sanews.gov.za/node/84692",
  "locator": "article text",
  "says": "\"a binding CGV term sheet by the end of the first quarter of 2027\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0003",
  "path": "tracks.rules.evidence[0]",
  "source": "S-ZA-ESKOM-WHEEL",
  "source_title": "Wheeling of energy and net-billing policy, Rev 2",
  "publisher": "Eskom",
  "source_tier": "primary",
  "source_url": "https://www.eskom.co.za/distribution/wp-content/uploads/2026/07/Wheeling-of-Energy-and-Net-billing-policy.pdf",
  "locator": "cl. 3.1.1, scope",
  "says": "excludes \"Wheeling to/from other countries outside South Africa, as cross-border trading and wheeling will be addressed in a separate policy\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0003",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-ZA-VODACOM-VW",
  "source_title": "Vodacom and Eskom mark first anniversary of South Africa's virtual wheeling mechanism",
  "publisher": "Vodacom",
  "source_tier": "primary",
  "source_url": "https://www.vodacom.com/news-article.php?articleID=17027",
  "locator": "release text",
  "says": "the mechanism \"moved from agreement to commercial operation in September 2025\"; its first year ran \"from 1 September 2025 to 31 August 2026\"; \"Monthly refunds have been processed since November 2025\", following Eskom's \"reconciliation and confirmation of Vodacom's monthly claims\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0004",
  "path": "tracks.rules.evidence[0]",
  "source": "S-ZA-OV-Q1-2627",
  "source_title": "Operation Vulindlela progress report, Q1 2026/27",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/press/2026/Operation%20Vulindlela%20Progress%20Report%20Q1%20-%202026.pdf",
  "locator": "p.9, Reform 2",
  "says": "\"A new iteration of the Network Statement was published on 3 July 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0004",
  "path": "tracks.rules.evidence[1]",
  "source": "S-ZA-OV-Q1-2627",
  "source_title": "Operation Vulindlela progress report, Q1 2026/27",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/press/2026/Operation%20Vulindlela%20Progress%20Report%20Q1%20-%202026.pdf",
  "locator": "p.10, next steps",
  "says": "a final Network Statement incorporating industry input and an updated access tariff, targeted for August 2026",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0004",
  "path": "tracks.rules.evidence[2]",
  "source": "S-ZA-EN-TOCS-2026",
  "source_title": "Eleven private train operators gear up for mainline entry after concluding access agreements",
  "publisher": "Engineering News / Mining Weekly (Creamer Media), Terence Creamer",
  "source_tier": "secondary",
  "source_url": "https://www.miningweekly.com/article/eleven-private-train-operators-gear-up-for-mainline-entry-after-concluding-access-agreements-2026-05-13",
  "locator": "article text",
  "says": "Network Statement Version 3 set the basis for the slot allocation, including rail access fees",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0004",
  "path": "tracks.rules.evidence[3]",
  "source": "S-ZA-MW-NS4-2026",
  "source_title": "New version of rail Network Statement officially gazetted",
  "publisher": "Mining Weekly (Creamer Media), Terence Creamer",
  "source_tier": "secondary",
  "source_url": "https://www.miningweekly.com/article/new-version-of-rail-network-statement-officially-gazetted-2026-09-21",
  "locator": "article text",
  "says": "Network Statement Version 4, covering 2026/27 and 2027/28, published in Gazette No. 55426; it extends access contracts from 10 to 15 years, including for the first operators",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0004",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-ZA-EN-TOCS-2026",
  "source_title": "Eleven private train operators gear up for mainline entry after concluding access agreements",
  "publisher": "Engineering News / Mining Weekly (Creamer Media), Terence Creamer",
  "source_tier": "secondary",
  "source_url": "https://www.miningweekly.com/article/eleven-private-train-operators-gear-up-for-mainline-entry-after-concluding-access-agreements-2026-05-13",
  "locator": "article text",
  "says": "TRIM confirmed the agreements at a ceremony in Sandton on 13 May 2026; the operators are ARC South Africa, Barberry, Grindrod, Interlinks, IRACEMA, Menar, Minrail, Motheo Logistics, Sharp Logistics, The Railway Corporation and TLD Marine",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0004",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-ZA-OV-Q3-2526",
  "source_title": "Operation Vulindlela Phase II, Q3 2025/26 progress report",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/speeches/2026/Operation%20Vulindlela%20Q3%20Report%202026.pdf",
  "locator": "printed p.8 / PDF p.12, Reform 2 key milestones",
  "says": "\"the allocation of 41 slots\"; \"Seven of the eleven train operating companies (TOCs) allocated slots will commence operations on the\" freight rail network \"in the first quarter of 2027\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0004",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-ZA-OV-Q1-2627",
  "source_title": "Operation Vulindlela progress report, Q1 2026/27",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/press/2026/Operation%20Vulindlela%20Progress%20Report%20Q1%20-%202026.pdf",
  "locator": "p.10",
  "says": "\"Work is underway by the Transnet Infrastructure Manager (TRIM) and the TOCs to prepare for operations from early 2027\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0004",
  "path": "tracks.delivery.evidence[3]",
  "source": "S-ZA-EN-TOCS-2026",
  "source_title": "Eleven private train operators gear up for mainline entry after concluding access agreements",
  "publisher": "Engineering News / Mining Weekly (Creamer Media), Terence Creamer",
  "source_tier": "secondary",
  "source_url": "https://www.miningweekly.com/article/eleven-private-train-operators-gear-up-for-mainline-entry-after-concluding-access-agreements-2026-05-13",
  "locator": "article text, remarks of TRIM's chief executive",
  "says": "operators would \"enter at their own risk a network that had been neglected\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0005",
  "path": "tracks.legal.evidence[0]",
  "source": "S-ZA-ERTA-2024",
  "source_title": "Economic Regulation of Transport Act 6 of 2024, with commencement history",
  "publisher": "Law Library (lawlibrary.org.za), from Government Gazette 50799",
  "source_tier": "primary",
  "source_url": "https://lawlibrary.org.za/akn/za/act/2024/6",
  "locator": "document details",
  "says": "assented to on 6 June 2024; published 11 June 2024 in Government Gazette 50799",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0005",
  "path": "tracks.legal.evidence[1]",
  "source": "S-ZA-ERTA-2024",
  "source_title": "Economic Regulation of Transport Act 6 of 2024, with commencement history",
  "publisher": "Law Library (lawlibrary.org.za), from Government Gazette 50799",
  "source_tier": "primary",
  "source_url": "https://lawlibrary.org.za/akn/za/act/2024/6",
  "locator": "commencement history; s.29(1)",
  "says": "commenced 1 April 2025; s.29(1): \"The Transport Economic Regulator is hereby established as an organ of state within the public administration\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0005",
  "path": "tracks.legal.evidence[2]",
  "source": "S-ZA-ERTA-2024",
  "source_title": "Economic Regulation of Transport Act 6 of 2024, with commencement history",
  "publisher": "Law Library (lawlibrary.org.za), from Government Gazette 50799",
  "source_tier": "primary",
  "source_url": "https://lawlibrary.org.za/akn/za/act/2024/6",
  "locator": "commencement history",
  "says": "Part B of Chapter 4 commenced on 1 April 2026",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0005",
  "path": "tracks.legal.evidence[3]",
  "source": "S-ZA-ERTA-2024",
  "source_title": "Economic Regulation of Transport Act 6 of 2024, with commencement history",
  "publisher": "Law Library (lawlibrary.org.za), from Government Gazette 50799",
  "source_tier": "primary",
  "source_url": "https://lawlibrary.org.za/akn/za/act/2024/6",
  "locator": "commencement history; s.8(2)",
  "says": "the commencement history lists \"Chapter 2 (section 5–10)\" among provisions \"not yet commenced\"; s.8(2) would let either party to a failed access negotiation \"refer the matter to the Regulator for resolution\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0005",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-ZA-OV-Q3-2526",
  "source_title": "Operation Vulindlela Phase II, Q3 2025/26 progress report",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/speeches/2026/Operation%20Vulindlela%20Q3%20Report%202026.pdf",
  "locator": "printed p.9 / PDF p.13, Reform 2 next steps",
  "says": "\"Operationalise the Transport Economic Regulator (TER) with appointment of Board\" (April 2026)",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0005",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-ZA-OV-Q1-2627",
  "source_title": "Operation Vulindlela progress report, Q1 2026/27",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/press/2026/Operation%20Vulindlela%20Progress%20Report%20Q1%20-%202026.pdf",
  "locator": "p.10",
  "says": "\"An interim CEO has been appointed together with an independent Board\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0005",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-ZA-OV-Q1-2627",
  "source_title": "Operation Vulindlela progress report, Q1 2026/27",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/press/2026/Operation%20Vulindlela%20Progress%20Report%20Q1%20-%202026.pdf",
  "locator": "p.10",
  "says": "\"The TER will be fully operational from April 2027\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0006",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-ZA-OV-Q3-2526",
  "source_title": "Operation Vulindlela Phase II, Q3 2025/26 progress report",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/speeches/2026/Operation%20Vulindlela%20Q3%20Report%202026.pdf",
  "locator": "printed p.8 / PDF p.12, Reform 2 key milestones",
  "says": "\"Transnet and International Container Terminal Services Inc (ICTSI) have signed a 25-year agreement\"; \"Effective from 1 January 2026, the partnership will enable investment of more than R11 billion\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0006",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-ZA-OV-Q1-2627",
  "source_title": "Operation Vulindlela progress report, Q1 2026/27",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/press/2026/Operation%20Vulindlela%20Progress%20Report%20Q1%20-%202026.pdf",
  "locator": "p.10",
  "says": "\"Transnet published a request for proposals (RFP) for three major private sector participation projects\": the Ngqura Manganese Export Corridor, a rolling stock leasing company (LeaseCo), and the Cape Town Multipurpose Terminal (a 25-year concession)",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0006",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-ZA-OV-Q1-2627",
  "source_title": "Operation Vulindlela progress report, Q1 2026/27",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/press/2026/Operation%20Vulindlela%20Progress%20Report%20Q1%20-%202026.pdf",
  "locator": "p.11, next steps",
  "says": "\"Capacitate the PSP unit at DBSA through appointment of a permanent head\" (September to December 2026)",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0006",
  "path": "financing.costs[0].cite",
  "source": "S-ZA-OV-Q3-2526",
  "source_title": "Operation Vulindlela Phase II, Q3 2025/26 progress report",
  "publisher": "National Treasury / The Presidency",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/speeches/2026/Operation%20Vulindlela%20Q3%20Report%202026.pdf",
  "locator": "printed p.8 / PDF p.12, Reform 2 key milestones",
  "says": "\"Effective from 1 January 2026, the partnership will enable investment of more than R11 billion\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0007",
  "path": "tracks.rules.evidence[0]",
  "source": "S-ZA-CFM-DRAFT-2026",
  "source_title": "Draft Capital Flow Management Regulations, 2026 (regulations under section 9(1) of the Currency and Exchanges Act, 1933)",
  "publisher": "National Treasury",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/public%20comments/CapFlow/Draft%20Capital%20Flow%20Management%20Regulations%202026%20April.pdf",
  "locator": "regulation 32(1) (PDF page not determined; the reader returned no page breaks)",
  "says": "\"The Regulations published by Government Notice R. 1111 of 1 December 1961, are hereby repealed.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0007",
  "path": "tracks.rules.evidence[1]",
  "source": "S-ZA-SANEWS-CFM-2026",
  "source_title": "Draft Capital Flow Management Regulations out for public comment (SAnews)",
  "publisher": "SAnews (Government Communication and Information System)",
  "source_tier": "primary",
  "source_url": "https://www.sanews.gov.za/south-africa/draft-capital-flow-management-regulations-out-public-comment",
  "locator": "article text",
  "says": "the draft regulations appeared in Government Gazette No. 7375 on 17 April 2026 and would replace the Exchange Control Regulations of 1961; Treasury described a move to a \"positive bias\" approach, with fewer transactions needing prior approval and more emphasis on reporting and on monitoring high-impact and high-risk transactions",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0007",
  "path": "tracks.rules.evidence[2]",
  "source": "S-ZA-NT-CFM-EXT-2026",
  "source_title": "Media statement, extension of deadline for public comment on the draft Capital Flow Management Regulations",
  "publisher": "National Treasury",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/comm_media/press/2026/2026051501%20Media%20Statement%20-%20Extension%20of%20Deadline%20for%20Public%20Comment%20on%20the%20Draft%20Capital%20Flow%20Management%20Regulations.pdf",
  "locator": "PDF p.1 of 2",
  "says": "the deadline for public comment was extended from 18 May 2026 to 30 June 2026, \"following requests to allow stakeholders additional time to review\"; after it, National Treasury and the Reserve Bank will review the comments and revise the draft",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0007",
  "path": "evidence[0]",
  "source": "S-SARB-CEMA-2026",
  "source_title": "Currency and Exchanges Manual for Authorised Dealers (version 1.1.36)",
  "publisher": "South African Reserve Bank (Financial Surveillance Department)",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/financial-surveillance/financial-surveillance-documents/2026/Currency%20and%20Exchanges%20Manual%20for%20Authorised%20Dealers.pdf",
  "locator": "section B.2(A)(i), page 47 of 323 (footer 7/2020)",
  "says": "\"Except as provided for in subsections (B) to (J) below, residents are not allowed to transfer capital\" to countries outside the Common Monetary Area; other applications are considered on their merits",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0007",
  "path": "evidence[1]",
  "source": "S-SARB-CEMA-2026",
  "source_title": "Currency and Exchanges Manual for Authorised Dealers (version 1.1.36)",
  "publisher": "South African Reserve Bank (Financial Surveillance Department)",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/financial-surveillance/financial-surveillance-documents/2026/Currency%20and%20Exchanges%20Manual%20for%20Authorised%20Dealers.pdf",
  "locator": "section A.3(E)(iv), page 32 of 323",
  "says": "\"Investments and transfers of funds in Rand from/to South Africa to/from other CMA countries\" do not require the approval of the Financial Surveillance Department",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0007",
  "path": "evidence[2]",
  "source": "S-SARB-CEMA-2026",
  "source_title": "Currency and Exchanges Manual for Authorised Dealers (version 1.1.36)",
  "publisher": "South African Reserve Bank (Financial Surveillance Department)",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/financial-surveillance/financial-surveillance-documents/2026/Currency%20and%20Exchanges%20Manual%20for%20Authorised%20Dealers.pdf",
  "locator": "section B.2(B)(i)(a), page 49 of 323 (footer 12/2025)",
  "says": "resident individuals may invest abroad up to \"a total amount of R10 million per calendar year per private individual\"; larger amounts need an application",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0007",
  "path": "evidence[3]",
  "source": "S-SARB-CEMA-2026",
  "source_title": "Currency and Exchanges Manual for Authorised Dealers (version 1.1.36)",
  "publisher": "South African Reserve Bank (Financial Surveillance Department)",
  "source_tier": "primary",
  "source_url": "https://www.resbank.co.za/content/dam/sarb/what-we-do/financial-surveillance/financial-surveillance-documents/2026/Currency%20and%20Exchanges%20Manual%20for%20Authorised%20Dealers.pdf",
  "locator": "section B.2(C)(i)(a), page 54 of 323 (the text after the page 53 footer)",
  "says": "under \"Foreign direct investments not exceeding R5 billion per applicant company\", Authorised Dealers may approve investments by \"mandated state-owned companies\" and by \"companies wishing to make bona fide new outward foreign direct investments\" where the total cost \"does not exceed R5 billion per company per calendar year\"; the passage read sets no separate limit for investment elsewhere in Africa",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0007",
  "path": "evidence[4]",
  "source": "S-ZA-CFM-DRAFT-2026",
  "source_title": "Draft Capital Flow Management Regulations, 2026 (regulations under section 9(1) of the Currency and Exchanges Act, 1933)",
  "publisher": "National Treasury",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/public%20comments/CapFlow/Draft%20Capital%20Flow%20Management%20Regulations%202026%20April.pdf",
  "locator": "regulation 1 (definition of \"foreign currency\"); regulation 9(1)",
  "says": "the definition of \"foreign currency\" excludes \"the currencies of the Kingdom of Lesotho, the Republic of Namibia and the Kingdom of Eswatini\"; regulation 9(1) refers to destinations \"in the same monetary area\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0007",
  "path": "evidence[5]",
  "source": "S-ZA-CFM-DRAFT-2026",
  "source_title": "Draft Capital Flow Management Regulations, 2026 (regulations under section 9(1) of the Currency and Exchanges Act, 1933)",
  "publisher": "National Treasury",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/public%20comments/CapFlow/Draft%20Capital%20Flow%20Management%20Regulations%202026%20April.pdf",
  "locator": "regulation 4(1)",
  "says": "the draft keeps a permission rule: \"a person may not, except with the permission of the National Treasury or an authorised person\" carry out the transactions it lists",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-R-0007",
  "path": "evidence[6]",
  "source": "S-ZA-CFM-DRAFT-2026",
  "source_title": "Draft Capital Flow Management Regulations, 2026 (regulations under section 9(1) of the Currency and Exchanges Act, 1933)",
  "publisher": "National Treasury",
  "source_tier": "primary",
  "source_url": "https://www.treasury.gov.za/public%20comments/CapFlow/Draft%20Capital%20Flow%20Management%20Regulations%202026%20April.pdf",
  "locator": "regulations 1 and 3",
  "says": "the draft defines crypto assets and brings buying, selling, borrowing and lending them within the regulations",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZAF-T-0001",
  "path": "tracks.legal.evidence[0]",
  "source": "S-ZA-SARS-AFCFTA-2024",
  "source_title": "Letter to trade: Implementation of the African Continental Free Trade Area (AfCFTA) Agreement",
  "publisher": "South African Revenue Service (Rules of Origin and Trade Agreements)",
  "source_tier": "primary",
  "source_url": "https://www.sars.gov.za/wp-content/uploads/Docs/CandE/Letter-to-Trader-Implementation-of-AfCFTA-Agreement-1-Feb-2024.pdf",
  "locator": "PDF p.1 of 2",
  "says": "\"The Extraordinary Session of the AfCFTA Council of Ministers held on 31 May 2023 in Nairobi, Kenya, endorsed the SACU's Tariff Offer that was verified to be compliant with the modalities for tariff liberalisation with South Africa committing to operationalise the AfCFTA with effect from the 31 January 2024.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-T-0001",
  "path": "tracks.legal.evidence[1]",
  "source": "S-ZA-DTIC-NW2213-2025",
  "source_title": "Reply to question NW2213, Minister of Trade, Industry and Competition (National Assembly)",
  "publisher": "Minister of Trade, Industry and Competition (reproduced by the Parliamentary Monitoring Group)",
  "source_tier": "primary",
  "source_url": "https://pmg.org.za/committee-question/30233/",
  "locator": "reply to part (2), second paragraph",
  "says": "\"South Africa gazetted the SACU Provisional Schedule of Tariff Concessions (Category A covering 90% of the tariff book) on 26 January 2024\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-T-0001",
  "path": "tracks.legal.evidence[2]",
  "source": "S-ZA-SARS-TARIFF-2024",
  "source_title": "Tariff amendments 2024 (list of notices amending Schedule No. 1 to the Customs and Excise Act)",
  "publisher": "South African Revenue Service",
  "source_tier": "primary",
  "source_url": "https://www.sars.gov.za/legal-counsel/secondary-legislation/tariff-amendments/tariff-amendments-2024/",
  "locator": "table row for R.4281 (Gazette 26 January 2024, GG 50045)",
  "says": "\"Amendment to Part 1 of Schedule No. 1, by the substitution of various tariff subheadings to implement changes to the rates of customs duties in terms of the African Continental Free Trade Area (AfCFTA) Agreement\"; effective date column: \"With effect from 31 January 2024\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-T-0001",
  "path": "tracks.rules.evidence[0]",
  "source": "S-ZA-DTIC-NW2213-2025",
  "source_title": "Reply to question NW2213, Minister of Trade, Industry and Competition (National Assembly)",
  "publisher": "Minister of Trade, Industry and Competition (reproduced by the Parliamentary Monitoring Group)",
  "source_tier": "primary",
  "source_url": "https://pmg.org.za/committee-question/30233/",
  "locator": "reply to part (2), eighth paragraph",
  "says": "\"Final implementation of the Schedules of Tariff Concessions will be undertaken when the remaining 10% category of the tariff books (7% sensitive products – subject to a longer period of liberalisation; and 3% excluded products) have been finalised. This is expected to be concluded by October 2025\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-T-0001",
  "path": "tracks.rules.evidence[1]",
  "source": "S-ZA-DTIC-NW2213-2025",
  "source_title": "Reply to question NW2213, Minister of Trade, Industry and Competition (National Assembly)",
  "publisher": "Minister of Trade, Industry and Competition (reproduced by the Parliamentary Monitoring Group)",
  "source_tier": "primary",
  "source_url": "https://pmg.org.za/committee-question/30233/",
  "locator": "reply to part (2), eighth paragraph",
  "says": "the remaining 10% is expected to be concluded \"for adoption by the African Union (AU) Summit in February 2026\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-T-0001",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-ZA-SARS-AFCFTA-2024",
  "source_title": "Letter to trade: Implementation of the African Continental Free Trade Area (AfCFTA) Agreement",
  "publisher": "South African Revenue Service (Rules of Origin and Trade Agreements)",
  "source_tier": "primary",
  "source_url": "https://www.sars.gov.za/wp-content/uploads/Docs/CandE/Letter-to-Trader-Implementation-of-AfCFTA-Agreement-1-Feb-2024.pdf",
  "locator": "PDF pp.1-2 of 2",
  "says": "\"the Minister of Trade, Industry and Competition launched the implementation of the start of preferential trade by South Africa\" and \"SARS certified two consignments destined to Ghana and Kenya respectively\"; \"the actual trade commenced on the 31 January 2024 for the approved published tariff offers to and from the countries mentioned above\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-T-0001",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-ZA-SARS-AFCFTA-2024",
  "source_title": "Letter to trade: Implementation of the African Continental Free Trade Area (AfCFTA) Agreement",
  "publisher": "South African Revenue Service (Rules of Origin and Trade Agreements)",
  "source_tier": "primary",
  "source_url": "https://www.sars.gov.za/wp-content/uploads/Docs/CandE/Letter-to-Trader-Implementation-of-AfCFTA-Agreement-1-Feb-2024.pdf",
  "locator": "PDF p.1 of 2",
  "says": "\"The following countries have finalised the necessary domestic legislation for the implementation of their respective tariff reduction commitments and are legible to trade with South Africa under the AfCFTA: Algeria, Cameroon, Egypt, Ghana, Kenya, Rwanda, and Tunisia. It should be noted that trading with the SADC countries takes place under the SADC Trade Protocol.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-T-0001",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-ZA-DTIC-NW2213-2025",
  "source_title": "Reply to question NW2213, Minister of Trade, Industry and Competition (National Assembly)",
  "publisher": "Minister of Trade, Industry and Competition (reproduced by the Parliamentary Monitoring Group)",
  "source_tier": "primary",
  "source_url": "https://pmg.org.za/committee-question/30233/",
  "locator": "reply to part (2), fourth to sixth paragraphs",
  "says": "\"of the 48 adopted offers, the following 23 countries have started implementing preferential trade\"; \"The new market access for South Africa and SACU is to 13 non-SADC countries\"; \"South Africa and SACU member states' trade with Mauritius, Seychelles, Malawi, Zambia and Tanzania will continue under the SADC Trade Protocol and preferences.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZAF-T-0001",
  "path": "evidence[0]",
  "source": "S-ZA-DTIC-NW2213-2025",
  "source_title": "Reply to question NW2213, Minister of Trade, Industry and Competition (National Assembly)",
  "publisher": "Minister of Trade, Industry and Competition (reproduced by the Parliamentary Monitoring Group)",
  "source_tier": "primary",
  "source_url": "https://pmg.org.za/committee-question/30233/",
  "locator": "reply to part (2), seventh paragraph",
  "says": "\"As other countries implement their approved tariff offers, the countries will be added to the list of names in South Africa's domestic legislation with whom preferential trade under the AfCFTA can take place.\"",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.legal.evidence[0]",
  "source": "S-ZM-ACT-2019",
  "source_title": "Electricity Act No. 11 of 2019",
  "publisher": "Government of Zambia (copy via policyvault.africa)",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/document/electricity-act-2019",
  "locator": "date of assent; s.1; s.2; s.52(2)(m)",
  "says": "\"Date of Assent: 27th December, 2019\"; s.1: the Act comes into operation \"on the date appointed by the Minister by statutory instrument\"; s.2: \"open access\" means \"the availability of spare transmission or distribution capacity to any qualifying participant ... on nondiscriminatory terms and conditions\"; s.52(2)(m) provides for regulations on an \"open access framework\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.legal.evidence[1]",
  "source": "S-ZM-ERB-ESR-2025",
  "source_title": "2025 Energy Sector Report",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/esr/esr2026.pdf",
  "locator": "p.xvi, key regulations",
  "says": "\"Statutory Instrument (SI) No. 40 of 2024: The Electricity (Open Access) Regulations.\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.legal.evidence[2]",
  "source": "S-ZM-SI-15-2020",
  "source_title": "Electricity Act (Commencement) Order, 2020 (Statutory Instrument No. 15 of 2020)",
  "publisher": "Government of Zambia, Statutory Instruments issue of 21 February 2020 (copy via laws.africa)",
  "source_tier": "primary",
  "source_url": "https://commons.laws.africa/akn/zm/act/si/2020/15/media/publication/zm-act-si-2020-15-publication-document.pdf",
  "locator": "para. 2; date and signature",
  "says": "\"The Electricity Act, 2019, shall come into operation on the date of publication of this Order.\" Dated \"6th February, 2020\"; signed by the Minister of Energy",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.rules.evidence[0]",
  "source": "S-ZM-ERB-DG-2025",
  "source_title": "End of year press statement by the ERB Director-General",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/PressStatements/END-OF-YEAR-PRESS-STATEMENT-BY-THE-ERB-DG-24-DECEMBER-2025.pdf",
  "locator": "p.2",
  "says": "on 14 February 2025 the Minister of Energy \"OFFICIALLY LAUNCHED THE ELECTRICITY OPEN ACCESS\" framework",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.rules.evidence[1]",
  "source": "S-ZM-ERB-ESR-2025",
  "source_title": "2025 Energy Sector Report",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/esr/esr2026.pdf",
  "locator": "s.3.1.4, printed p.36 / PDF p.57",
  "says": "\"During the period under review and in line with the Electricity (Open Access) Regulations, Statutory Instrument (S.I.) No. 40 of 2024, the ERB approved Electricity Open Access Market Guidelines and the Electricity Open Access Transmission and Distribution Pricing Methodology.\" No approval day is given.",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.rules.evidence[2]",
  "source": "S-ZM-ERB-ESR-2025",
  "source_title": "2025 Energy Sector Report",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/esr/esr2026.pdf",
  "locator": "s.3.1.4, printed p.36 / PDF p.57",
  "says": "approved in the same sentence as the Market Guidelines (quoted above); no approval day is given",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.rules.evidence[3]",
  "source": "S-ZM-ERB-ESR-2025",
  "source_title": "2025 Energy Sector Report",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/esr/esr2026.pdf",
  "locator": "s.3.1.4, printed p.36 / PDF p.57",
  "says": "\"the ERB has also issued the Notice of Variation to the System Operator licence to accommodate new functions of the System Operator in S.I. 40 of 2024. A new trading licence for ZESCO as the designated Public Service Trader under the new Market Structure was approved.\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.rules.evidence[4]",
  "source": "S-ZM-ERB-DG-2025",
  "source_title": "End of year press statement by the ERB Director-General",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/PressStatements/END-OF-YEAR-PRESS-STATEMENT-BY-THE-ERB-DG-24-DECEMBER-2025.pdf",
  "locator": "p.2",
  "says": "\"THE ERB DEVELOPED THE OPEN ACCESS TRANSMISSION AND DISTRIBUTION PRICING METHODOLOGY.\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.rules.evidence[5]",
  "source": "S-ZM-ERB-CONSULT-2025",
  "source_title": "Invitation for stakeholder feedback on draft open access documents",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/invitation-for-stakeholder-feedback-on-draft-open-access-documents",
  "locator": "consultation notice",
  "says": "drafts out for stakeholder comment from 11 August 2025, deadline \"Sunday, 24th August 2025\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.rules.evidence[6]",
  "source": "S-ZM-ERB-ESR-2025",
  "source_title": "2025 Energy Sector Report",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/esr/esr2026.pdf",
  "locator": "s.3.1.4, printed p.36 / PDF p.57",
  "says": "the seven documents \"were drafted and underwent extensive stakeholder consultations\" in 2025",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.rules.evidence[7]",
  "source": "S-ZM-ERB-ESR-2025",
  "source_title": "2025 Energy Sector Report",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/esr/esr2026.pdf",
  "locator": "s.3.1.4, printed p.36 / PDF p.57",
  "says": "\"These consultations will continue into 2026\" (a forward statement; no 2026 consultation was found in the sources read)",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.rules.evidence[8]",
  "source": "S-ZM-GBA-OA-2026",
  "source_title": "Zambia's open access market builds new route beyond ZESCO",
  "publisher": "Green Building Africa (Bryan Groenendaal)",
  "source_tier": "secondary",
  "source_url": "https://www.greenbuildingafrica.co.za/zambias-open-access-market-builds-new-route-beyond-zesco/",
  "locator": "article text",
  "says": "\"supporting rules covering trading, metering, balancing and system operation remained under consultation into 2026\" (the state of the rules when the article was published; it names no adoption)",
  "quote_check": "unverified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.delivery.evidence[0]",
  "source": "S-ZM-ZESCO-PORTAL",
  "source_title": "Application for open access (online form)",
  "publisher": "ZESCO",
  "source_tier": "primary",
  "source_url": "https://openaccess.zesco.co.zm/application",
  "locator": "online form",
  "says": "live online application for long-, medium- or short-term access",
  "quote_check": "paraphrase",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.delivery.evidence[1]",
  "source": "S-ZM-ERB-AR-2025",
  "source_title": "ERB 2025 Annual Report",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/files/reports/ERB-2025-ANNUAL-REPORT.pdf",
  "locator": "Table 2-2, p.7",
  "says": "\"Trading of Electricity\" licences issued: 4 in 2025, 5 in 2024",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.delivery.evidence[2]",
  "source": "S-ZM-ERB-ESR-2025",
  "source_title": "2025 Energy Sector Report",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/esr/esr2026.pdf",
  "locator": "s.3.1.4, printed p.36 / PDF p.57",
  "says": "\"the transmission and distribution network service providers comprising ZESCO, CEC and NWEC launched the open access application digital platforms\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.delivery.evidence[3]",
  "source": "S-ZM-ERB-ESR-2025",
  "source_title": "2025 Energy Sector Report",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/esr/esr2026.pdf",
  "locator": "Table 3-2, printed p.35 / PDF p.56; Appendix 1, printed p.76 / PDF p.97",
  "says": "Table 3-2 counts 7 Wheeling Agreements and 5 System Operations Agreements among the 135 agreements the ERB approved in 2025. Appendix 1 lists all twelve with ZESCO as one party; the wheeling agreements total 435.00 MW of contracted capacity (Gouli 135.00; six others 50.00 each) and the system operation agreements 250.00 MW",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.delivery.evidence[4]",
  "source": "S-ZM-ERB-ESR-2025",
  "source_title": "2025 Energy Sector Report",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/esr/esr2026.pdf",
  "locator": "Table 3-10 \"GreenCo Monthly Electricity Sales (GWh) in 2025\", printed p.49 / PDF p.70",
  "says": "GreenCo's 2025 sales total \"572.12 GWh\": \"14.33 GWh\" in \"SAPP Competitive Market Sales\" and \"557.79 GWh\" in \"Domestic Client Sales\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.delivery.evidence[5]",
  "source": "S-ZM-ERB-ESR-2025",
  "source_title": "2025 Energy Sector Report",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/esr/esr2026.pdf",
  "locator": "Table 3-9 \"GreenCo Monthly Electricity Purchases (GWh)\", printed p.49 / PDF p.70",
  "says": "GreenCo's 2025 purchases total 737.86 GWh as stated: SAPP market 259.38, Chisamba Solar PV 115.63, bilateral imports 24.37, and \"Emergency Imports via ZESCO\" 338.37 (the four columns sum to 737.75). The table does not say which access arrangement each channel used. Its stated challenges include that \"the company relied on limited emergency imports\" (s.3.2.5.8.4)",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.delivery.evidence[6]",
  "source": "S-ZM-ERB-ESR-2025",
  "source_title": "2025 Energy Sector Report",
  "publisher": "Energy Regulation Board",
  "source_tier": "primary",
  "source_url": "https://www.erb.org.zm/wp-content/uploads/esr/esr2026.pdf",
  "locator": "s.3.2.3.1 and Figure 3-6, printed p.43 / PDF p.64",
  "says": "Figure 3-6 shows 2025 imports of 278,760 MWh (GreenCo), 485,628 (Kanona), 686,671 (CEC) and 2,119,698 (ZESCO). The text says \"IPTs undertook imports totalling 278.76GWh from Copperbelt Energy Corporation Plc (686.67GWh), Kanona Power Company Limited (485.63GWh) and GreenCo Power Services Limited (278.76 GWh)\"",
  "quote_check": "verified",
  "translation_check": ""
 },
 {
  "record": "ZMB-R-0001",
  "path": "tracks.delivery.evidence[7]",
  "source": "S-ZM-GBA-OA-2026",
  "source_title": "Zambia's open access market builds new route beyond ZESCO",
  "publisher": "Green Building Africa (Bryan Groenendaal)",
  "source_tier": "secondary",
  "source_url": "https://www.greenbuildingafrica.co.za/zambias-open-access-market-builds-new-route-beyond-zesco/",
  "locator": "article text, the paragraph on exports",
  "says": "Under \"Exports represent another significant source of demand\": \"National Transmission Company South Africa accounts for 100 MW of the 104.9 MW registered with private suppliers\"; Malawi's ESCOM accounts for the remaining 4.9 MW. The 104.9 MW is export demand only, separate from the domestic agreements the article covers elsewhere. Measure: capacity registered, in MW; denominator: all export demand registered with private suppliers (104.9 MW). Period: not defined by the source (no date is given for the registrations). The article does not say what kind of agreement they are.",
  "quote_check": "unverified",
  "translation_check": ""
 }
]