  "record": "AFR-P-0001",
  "track": "delivery",
  "status": "operating_partial",
  "status_date": "2026-06",
  "as_of": "2026-10-26",
  "evidence_items": 2,
  "summary": "PAPSS's June 2026 coverage document lists live participants in 14 countries, among them Malawi, Tanzania, Zambia and Zimbabwe in SADC. South Africa is listed only on PAPSS's inbound-only \"Extended Network\", with 22 banks reachable and a note that additional integration may be required. Namibia, Botswana, Mozambique, Lesotho and Eswatini do not appear."
 },
 {
  "record": "AFR-P-0002",
  "track": "delivery",
  "status": "operating",
  "status_date": "2022-03-29",
  "as_of": "2026-10-28",
  "evidence_items": 5,
  "summary": "ATI said in March 2022 that it had provided guarantees under the facility for three solar plants in Malawi. Whether any power producer has drawn on the cover is not stated."
 },
 {
  "record": "AFR-T-0001",
  "track": "legal",
  "status": "in_force",
  "status_date": "2019-05-30",
  "as_of": "2026-10-27",
  "evidence_items": 5,
  "summary": "The Agreement entered into force on 30 May 2019. The African Union's status list of 22 May 2026 counts 54 signatures and 49 ratifications, with Benin, Libya, Somalia, South Sudan and Sudan not ratified and Eritrea not signed. The AU Assembly in February 2026 commended Somalia for ratifying and urged it to deposit its instrument. The AfCFTA Secretariat's July 2026 tracker counts 50 State Parties, Somalia among them with a note that its deposit has not been confirmed. tralac reports that Somalia deposited on 4 September 2026; the depositary's own record of that was not found in the sources read."
 },
 {
  "record": "AFR-T-0002",
  "track": "rules",
  "status": "approved",
  "status_date": "2022-02",
  "as_of": "2026-10-27",
  "evidence_items": 3,
  "summary": "The Council of Ministers adopted a directive in October 2021 letting countries whose tariff schedules met the agreed modalities trade preferentially among themselves before final schedules are agreed, and the AU Assembly adopted it in February 2022. A schedule then has to be verified and adopted, and gazetted at home, before a country can trade under it."
 },
 {
  "record": "AFR-T-0002",
  "track": "delivery",
  "status": "operating_partial",
  "status_date": "2026-07",
  "as_of": "2026-10-27",
  "evidence_items": 11,
  "summary": "By July 2026, 48 State Parties had tariff schedules adopted by the Council of Ministers, 26 had gazetted them and 12 had notified the Secretariat that they were trading under them. The 22 adopted but not gazetted include Angola and Zimbabwe in SADC, and Côte d'Ivoire and Senegal in ECOWAS. A year earlier the Secretary-General reported gazette notices from 24 State Parties, and 17 full schedules covering all tariff categories. The AU Assembly urged the rest to gazette and start trading by the end of 2026. The Guided Trade Initiative, a Secretariat pilot that matched firms in a few countries from October 2022, grew to 39 countries and ended in 2025; more than 12,000 certificates of origin had been notified by March 2026. Trade values under the Agreement were not found in the sources read."
 },
 {
  "record": "AFR-T-0003",
  "track": "rules",
  "status": "approved",
  "status_date": "2026-02-15",
  "as_of": "2026-10-27",
  "evidence_items": 4,
  "summary": "A good qualifies for AfCFTA tariffs only if it meets the rules of origin. In July 2025 the Secretary-General reported 92.43% of tariff lines agreed, with textiles and automotive products outstanding. In February 2026 the AU Assembly adopted \"the agreed rules in Appendix IV\" and took note of a Council of Ministers directive applying provisional rules for textiles and apparel. tralac reads this as 100% agreed; the decision read does not itself give a share or name the automotive rules."
 },
 {
  "record": "AFR-T-0004",
  "track": "rules",
  "status": "approved",
  "status_date": "2025",
  "as_of": "2026-10-27",
  "evidence_items": 2,
  "summary": "The Council of Ministers, at its 16th meeting in Kinshasa (in 2025; the report read does not give the date), adopted draft regulations for a continental transit guarantee system and an AfCFTA transit document, which the Secretary-General describes as groundwork for a single bond guarantee across the continent. The Secretariat and Afreximbank finalised a regulatory framework for the scheme, based on COMESA's. The next phase, engaging national stakeholders, financial institutions and insurers, had not been reported on in the sources read; whether any consignment has moved under the scheme was not found."
 },
 {
  "record": "AFR-T-0005",
  "track": "legal",
  "status": "approved",
  "status_date": "2023-02-19",
  "as_of": "2026-10-27",
  "evidence_items": 3,
  "summary": "The AU Assembly adopted the Protocol on 19 February 2023, by its own text. It enters into force thirty days after the twenty-second ratification. No source read gives the number of ratifications or says it has entered into force; the Assembly in February 2026 urged member states to ratify it by the end of 2026. South Africa's trade minister said in May 2025 that South Africa would ratify it once its annexes are adopted. Once in force, the Protocol would terminate bilateral investment treaties between State Parties within five years, and it says State Parties shall not conclude new ones among themselves after its adoption; it defines a State Party as one for which the Protocol is in force. State Parties are to make \"best endeavours\" to align the regional economic communities' investment agreements with it within five to ten years of entry into force, and \"may take into account\" its requirements in agreements with Third Parties, which it defines as states not party to the Protocol. Which bilateral or regional agreements are affected was not found in the sources read."
 },
 {
  "record": "AFR-T-0005",
  "track": "rules",
  "status": "drafted",
  "status_date": "2025",
  "as_of": "2026-10-27",
  "evidence_items": 3,
  "summary": "An annex on preventing and settling investment disputes was still being negotiated in July 2025, with five member states asking for investor-state arbitration to be included. The Assembly had set February 2026 for finishing it. The Council of Ministers' press release of July 2026 still lists it as outstanding."
 },
 {
  "record": "MOZ-P-0001",
  "track": "delivery",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 2,
  "summary": ""
 },
 {
  "record": "MOZ-P-0001",
  "track": "funding",
  "status": "unknown",
  "status_date": "",
  "as_of": "",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "MOZ-P-0002",
  "track": "delivery",
  "status": "targeted",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 2,
  "summary": ""
 },
 {
  "record": "MOZ-P-0002",
  "track": "funding",
  "status": "unknown",
  "status_date": "",
  "as_of": "",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "MOZ-P-0003",
  "track": "delivery",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 4,
  "summary": "The line was energised on 8 August 2026, and a 5 MW import was used to test and commission the commercial metering. At the start of September, commercial trade was still waiting on a tariff. No source read shows the line in service after the tests, so the delivery status stays unknown."
 },
 {
  "record": "MOZ-P-0003",
  "track": "funding",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "MOZ-R-0001",
  "track": "legal",
  "status": "in_force",
  "status_date": "2022-10-09",
  "as_of": "2026-10-26",
  "evidence_items": 2,
  "summary": "The Electricity Law of 2022 bars a transmission or distribution concessionaire from refusing access and transit where there is technical capacity and access does not harm its own service-quality obligations, requires access without discrimination, and puts transit on a tariff approved by ARENE. It was published on 11 July 2022 and entered into force 90 days later."
 },
 {
  "record": "MOZ-R-0001",
  "track": "rules",
  "status": "in_force",
  "status_date": "2026-07-07",
  "as_of": "2026-10-26",
  "evidence_items": 2,
  "summary": "The concession regulation, approved on 31 March 2026 and in force on publication on 7 July 2026, requires the transmission concessionaire and the system operator to give third parties non-discriminatory access to the transmission network where capacity is available and access does not affect the regulatory levels of quality, efficiency, safety and reliability of the service and the system's operation, on payment of a transit tariff. The tariff is to be set \"in terms to be regulated\" by ARENE, and the regulation says transmission and distribution are subject to complementary regulation. Neither was found."
 },
 {
  "record": "MOZ-R-0001",
  "track": "delivery",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 0,
  "summary": "No source read shows a third party using Mozambique's transmission network under these rules, or an access contract signed under article 66."
 },
 {
  "record": "MOZ-R-0002",
  "track": "legal",
  "status": "in_force",
  "status_date": "2022-10-09",
  "as_of": "2026-10-26",
  "evidence_items": 2,
  "summary": "The 2022 law gives the management of the national electricity system to a public-law body with administrative, financial and asset autonomy, performing system operation and market operation, and leaves its statute to the Council of Ministers."
 },
 {
  "record": "MOZ-R-0002",
  "track": "rules",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 1,
  "summary": "On 7 July 2026, almost four years after the law took effect, the concession decree assigned the operator's functions to EDM, the state utility, until the statute is approved. So no separate operator had been set up by then. Whether a statute has been drafted was not found."
 },
 {
  "record": "MOZ-R-0002",
  "track": "delivery",
  "status": "not_started",
  "status_date": "2026-07-07",
  "as_of": "2026-10-26",
  "evidence_items": 1,
  "summary": "As of the decree's publication, EDM performs the operator's functions; no separate body operates."
 },
 {
  "record": "MOZ-R-0003",
  "track": "legal",
  "status": "in_force",
  "status_date": "2022-10-09",
  "as_of": "2026-10-26",
  "evidence_items": 3,
  "summary": "Under the 2022 law, export may not prejudice national energy security, export tariffs may not be subsidised at the domestic market's expense, and exporters must meet the grid code and the operator's requirements. Imports are made by concessionaires whose contract authorises them, to supply their own consumers."
 },
 {
  "record": "MOZ-R-0003",
  "track": "rules",
  "status": "in_force",
  "status_date": "2026-07-07",
  "as_of": "2026-10-26",
  "evidence_items": 1,
  "summary": "The concession regulation of July 2026 covers concessions for import and export along with generation, transmission, distribution, trading and storage, and replaces the regulations of 2000 and 2005."
 },
 {
  "record": "MOZ-R-0003",
  "track": "delivery",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "NAM-P-0001",
  "track": "delivery",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-16",
  "evidence_items": 3,
  "summary": ""
 },
 {
  "record": "NAM-P-0001",
  "track": "funding",
  "status": "unknown",
  "status_date": "",
  "as_of": "",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "NAM-R-0001",
  "track": "legal",
  "status": "in_force",
  "status_date": "2007-11-15",
  "as_of": "2026-10-16",
  "evidence_items": 3,
  "summary": ""
 },
 {
  "record": "NAM-R-0001",
  "track": "rules",
  "status": "approved",
  "status_date": "2025-03-27",
  "as_of": "2026-10-16",
  "evidence_items": 4,
  "summary": "The ECB issued the MSB Market Rules in the Government Gazette on 19 December 2022. They set phases: Phase 1b from July 2021 to June 2026, and Phase 2 from 1 July 2026. A revised wheeling framework and grid codes were approved in March 2025 (press report). That Phase 2 has started was not found in the sources read."
 },
 {
  "record": "NAM-R-0001",
  "track": "delivery",
  "status": "operating_partial",
  "status_date": "2019-09",
  "as_of": "2026-10-16",
  "evidence_items": 3,
  "summary": ""
 },
 {
  "record": "NAM-R-0001",
  "track": "funding",
  "status": "not_applicable",
  "status_date": "",
  "as_of": "",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "NAM-R-0002",
  "track": "rules",
  "status": "in_force",
  "status_date": "2025-09-05",
  "as_of": "2026-10-16",
  "evidence_items": 5,
  "summary": "First imposed from 5 March 2024 for 18 months; renewed from 5 September 2025 to 5 January 2029, or until transmission constraints are relieved. All evidence is from press reports of an ECB statement made in late July 2026."
 },
 {
  "record": "SADC-P-0001",
  "track": "delivery",
  "status": "operating",
  "status_date": "2026-09",
  "as_of": "2026-10-26",
  "evidence_items": 4,
  "summary": "SADC-RTGS settles high-value payments between banks in 15 SADC countries. It settled only in rand from 2013 until the Reserve Bank and Banco Nacional de Angola announced the kwanza as a second settlement currency on 27 July 2026. In September 2026 it settled 163,588 transactions worth R279.5 billion."
 },
 {
  "record": "SADC-P-0002",
  "track": "delivery",
  "status": "operating",
  "status_date": "2026-09",
  "as_of": "2026-10-26",
  "evidence_items": 3,
  "summary": "TCIB, SADC's instant retail payment scheme, is managed and operated by BankservAfrica under a mandate from the SADC Payment System Oversight Committee. It went live with Namibia and Zimbabwe in November 2021. In September 2026 it settled 302 transactions worth about R306 million, with eight participants, against 163,588 transactions on SADC-RTGS in the same month."
 },
 {
  "record": "SADC-P-0003",
  "track": "delivery",
  "status": "operating",
  "status_date": "2022-03",
  "as_of": "2026-10-28",
  "evidence_items": 4,
  "summary": "The facility gives grants to prepare cross-border projects. SADC said in January 2021 that it had approved €20 million for 13 projects by 2019. Its 2022 Summit brochure gives a running total of US$20.2 million for 12 projects as of March 2022, after savings and cancellations."
 },
 {
  "record": "SADC-P-0003",
  "track": "funding",
  "status": "unknown",
  "status_date": "",
  "as_of": "",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "SAPP-P-0001",
  "track": "delivery",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-27",
  "evidence_items": 11,
  "summary": ""
 },
 {
  "record": "SAPP-P-0001",
  "track": "funding",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-27",
  "evidence_items": 9,
  "summary": ""
 },
 {
  "record": "WAPP-R-0001",
  "track": "rules",
  "status": "in_force",
  "status_date": "2026-03-19",
  "as_of": "2026-10-26",
  "evidence_items": 6,
  "summary": "In December 2019 ERERA approved regional transmission access procedures (PAUSTE) whose tariff table for point-to-point service is an annual template for the operator to fill in and ERERA to approve; every cell in the published table reads 0.0000. On 19 March 2026 ERERA adopted a new methodology, effective that day, under which no cross-border tariff is applied. Instead, the national systems whose networks carry cross-border flows are compensated by those that cause them, through a party designated in each control area, on amounts the regional operator proposes and ERERA approves each year; national regulators pass the amounts through national tariffs. ERERA approved the procedure for applying the methodology the same day. Neither document says how the 2026 methodology relates to the 2019 point-to-point tariff."
 },
 {
  "record": "WAPP-R-0001",
  "track": "delivery",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 1,
  "summary": "The methodology requires an ERERA resolution each year approving the net amount each compensation party pays or receives. No such resolution was found in WAPP's document library on 26 October 2026."
 },
 {
  "record": "WAPP-R-0002",
  "track": "rules",
  "status": "approved",
  "status_date": "2026-03-19",
  "as_of": "2026-10-26",
  "evidence_items": 3,
  "summary": "WAPP's General Assembly adopted the transition of WAPP's Information and Coordination Centre to a regional system and market operator on 2 November 2012. On 3 November 2017 it amended WAPP's founding agreement: the centre is an organ of WAPP's General Secretariat and also performs the system and market operator's functions during the market's first phase. ERERA's March 2026 transmission pricing procedure is to be implemented by \"the Regional System and Market Operator\" under ERERA's supervision. Whether that operator has since been made a body separate from the WAPP secretariat was not found in the sources read."
 },
 {
  "record": "WAPP-R-0002",
  "track": "delivery",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 3,
  "summary": "WAPP's 2021 annual report places the centre inside the General Secretariat, as a department in charge of the regional market. In 2021, pending its market management system, it was running scheduling tests for 15 cross-border bilateral contracts, confirmed daily. Benin's government reported the inauguration of the centre's building at Abomey-Calavi on 17 November 2023. Whether the market management system is now in service, and whether the centre now operates as the regional operator beyond tests, was not found in the sources read."
 },
 {
  "record": "WAPP-R-0003",
  "track": "legal",
  "status": "in_force",
  "status_date": "2018-12",
  "as_of": "2026-10-26",
  "evidence_items": 6,
  "summary": "In December 2018 the ECOWAS Council of Ministers adopted a directive, in force on signature, after noting that cross-border trade had in some cases led to substantial payment arrears and government intervention to clear them. It asks finance ministries for escrow accounts with payment waterfalls and payment guarantees, and asks ERERA and WAPP for a contract template that sanctions non-payment through graduated disconnection and includes commercial bank guarantees backed by multilateral guarantees. Member states were to adopt the national provisions by 1 January 2020."
 },
 {
  "record": "WAPP-R-0003",
  "track": "delivery",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 3,
  "summary": "The directive asks ERERA and WAPP to publish regularly on member states' adoption of its measures. No such publication, and no national measure citing the directive, was found in the sources read. WAPP's 2021 annual report says a working group of WAPP, ERERA and member utilities was still discussing a revolving liquidity support fund, a collective guarantee for the regional market, in 2021. In May 2026 the World Bank wrote that its programme \"will\" set up a revolving liquidity fund to guarantee timely payment; that fund's existence was not found in the sources read."
 },
 {
  "record": "WAPP-R-0004",
  "track": "rules",
  "status": "approved",
  "status_date": "2025-09-13",
  "as_of": "2026-10-26",
  "evidence_items": 2,
  "summary": "ERERA launched phase 1 of the regional market from 29 June 2018, under market rules it approved in 2015. On 13 September 2025 it approved the Regional Electricity Market Codes of West Africa; when the codes took effect was not read. Both facts come from recitals in later instruments; the 2015 rules and the 2025 codes themselves were not read."
 },
 {
  "record": "WAPP-R-0004",
  "track": "delivery",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 4,
  "summary": "Phase 1 was launched in June 2018. In April 2021, WAPP and ERERA's heads agreed that phase 2 should start \"within one or two years\", according to WAPP's 2021 annual report. In May 2026 the World Bank reported that regulators validated the day-ahead market's tariffs at the end of 2025, that WAPP ran its first synchronisation test across twelve countries, and that the day-ahead market was being launched. Whether the day-ahead market (phase 2) has begun trading was not found in the sources read."
 },
 {
  "record": "ZAF-P-0001",
  "track": "delivery",
  "status": "targeted",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 3,
  "summary": ""
 },
 {
  "record": "ZAF-P-0001",
  "track": "funding",
  "status": "unknown",
  "status_date": "",
  "as_of": "",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "ZAF-R-0001",
  "track": "legal",
  "status": "in_force",
  "status_date": "2025-01-01",
  "as_of": "2026-10-10",
  "evidence_items": 2,
  "summary": ""
 },
 {
  "record": "ZAF-R-0001",
  "track": "rules",
  "status": "consulting",
  "status_date": "2026-08-26",
  "as_of": "2026-10-27",
  "evidence_items": 17,
  "summary": "Market Code heard by NERSA on 1 July 2026, against NERSA's own target of approval by 31 July 2026. Trading Rules consultation extended twice, to 28 August and then 28 September 2026 (press reports), and reported on 6 October 2026 as still not finalised. A further consultation, on a regulatory framework for electricity trading platforms, opened on 4 October 2026; it is a separate instrument, so the status date stays with the Trading Rules extension. Approval of the Market Code or the Trading Rules not found (rechecked 27 October 2026)."
 },
 {
  "record": "ZAF-R-0001",
  "track": "delivery",
  "status": "operating_partial",
  "status_date": "2026-04",
  "as_of": "2026-10-27",
  "evidence_items": 5,
  "summary": ""
 },
 {
  "record": "ZAF-R-0001",
  "track": "funding",
  "status": "not_applicable",
  "status_date": "",
  "as_of": "",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "ZAF-R-0002",
  "track": "legal",
  "status": "unknown",
  "status_date": "",
  "as_of": "",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "ZAF-R-0002",
  "track": "delivery",
  "status": "targeted",
  "status_date": "",
  "as_of": "2026-10-10",
  "evidence_items": 2,
  "summary": ""
 },
 {
  "record": "ZAF-R-0002",
  "track": "funding",
  "status": "targeted",
  "status_date": "",
  "as_of": "2026-10-10",
  "evidence_items": 2,
  "summary": ""
 },
 {
  "record": "ZAF-R-0003",
  "track": "rules",
  "status": "unknown",
  "status_date": "",
  "as_of": "2026-10-10",
  "evidence_items": 1,
  "summary": ""
 },
 {
  "record": "ZAF-R-0003",
  "track": "delivery",
  "status": "operating_partial",
  "status_date": "2026-08-31",
  "as_of": "2026-10-10",
  "evidence_items": 1,
  "summary": ""
 },
 {
  "record": "ZAF-R-0003",
  "track": "funding",
  "status": "not_applicable",
  "status_date": "",
  "as_of": "",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "ZAF-R-0004",
  "track": "rules",
  "status": "in_force",
  "status_date": "2026-07-03",
  "as_of": "2026-10-26",
  "evidence_items": 4,
  "summary": "Access runs on Network Statements published by Transnet's infrastructure manager. A new iteration was published on 3 July 2026, with a final version incorporating industry input and an updated access tariff targeted for August 2026. A trade-press report of 21 September 2026 says Network Statement Version 4 has been gazetted; whether that is the same document is not established."
 },
 {
  "record": "ZAF-R-0004",
  "track": "delivery",
  "status": "targeted",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 4,
  "summary": ""
 },
 {
  "record": "ZAF-R-0004",
  "track": "funding",
  "status": "not_applicable",
  "status_date": "",
  "as_of": "",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "ZAF-R-0005",
  "track": "legal",
  "status": "in_force",
  "status_date": "2026-04-01",
  "as_of": "2026-10-26",
  "evidence_items": 4,
  "summary": "In force in part. The Act was assented to on 6 June 2024. The Regulator's establishment (Chapter 4, Part A) commenced on 1 April 2025 and Part B of Chapter 4 on 1 April 2026, both by Proclamation 224 of 2024. The Law Library's commencement history lists Chapter 2 (rail access, sections 5 to 10), Chapter 3 and Chapter 5 as not yet commenced. The status and its date refer to the Regulator's provisions, not to the rail access chapter. That listing predates the Amendment Act reported signed in March 2026, which was not read, so a later commencement of Chapter 2 cannot be ruled out."
 },
 {
  "record": "ZAF-R-0005",
  "track": "delivery",
  "status": "targeted",
  "status_date": "",
  "as_of": "2026-10-26",
  "evidence_items": 3,
  "summary": ""
 },
 {
  "record": "ZAF-R-0005",
  "track": "funding",
  "status": "unknown",
  "status_date": "",
  "as_of": "",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "ZAF-R-0006",
  "track": "delivery",
  "status": "operating_partial",
  "status_date": "2026-01-01",
  "as_of": "2026-10-26",
  "evidence_items": 3,
  "summary": "The Durban Container Terminal Pier 2 concession took effect on 1 January 2026. By the Q1 2026/27 report Transnet had published requests for proposals for three more projects."
 },
 {
  "record": "ZAF-R-0006",
  "track": "funding",
  "status": "unknown",
  "status_date": "",
  "as_of": "",
  "evidence_items": 0,
  "summary": ""
 },
 {
  "record": "ZAF-R-0007",
  "track": "rules",
  "status": "consulting",
  "status_date": "2026-05-15",
  "as_of": "2026-10-26",
  "evidence_items": 3,
  "summary": "National Treasury published draft Capital Flow Management Regulations for comment on 17 April 2026. They would repeal the regulations of 1 December 1961 and take effect on publication in the Gazette. Treasury extended the comment deadline to 30 June 2026 and said it and the Reserve Bank would then revise the draft. Final regulations were not found in the sources read."
 },
 {
  "record": "ZAF-T-0001",
  "track": "legal",
  "status": "in_force",
  "status_date": "2024-01-31",
  "as_of": "2026-10-27",
  "evidence_items": 3,
  "summary": "The Council of Ministers endorsed the Southern African Customs Union's common tariff offer on 31 May 2023. South Africa gazetted it on 26 January 2024 (Notice R.4281), with effect from 31 January 2024. The offer covers Category A, 90% of the tariff book; the sensitive and excluded categories (the other 10%) were still being negotiated in 2025."
 },
 {
  "record": "ZAF-T-0001",
  "track": "rules",
  "status": "targeted",
  "status_date": "",
  "as_of": "2026-10-27",
  "evidence_items": 2,
  "summary": "The remaining 10% of the tariff book (7% sensitive products, liberalised more slowly, and 3% excluded) was expected to be concluded by October 2025 for adoption by the AU Summit in February 2026. Whether negotiations concluded, and an adopted SACU schedule for those categories, were not found in the sources read."
 },
 {
  "record": "ZAF-T-0001",
  "track": "delivery",
  "status": "operating_partial",
  "status_date": "2025-05",
  "as_of": "2026-10-27",
  "evidence_items": 3,
  "summary": "Trade under the offer began on 31 January 2024 with seven partners outside SADC (Algeria, Cameroon, Egypt, Ghana, Kenya, Rwanda and Tunisia); SARS certified the first two consignments, to Ghana and Kenya. By May 2025 the minister listed 23 countries implementing preferential trade, which gave South Africa and SACU new access to 13 countries outside SADC. Trade with SADC partners stays under the SADC Trade Protocol. South Africa is among the 12 State Parties the Secretariat lists as trading in July 2026. How much has been traded was not found in the sources read."
 },
 {
  "record": "ZMB-R-0001",
  "track": "legal",
  "status": "in_force",
  "status_date": "2024",
  "as_of": "2026-10-10",
  "evidence_items": 3,
  "summary": ""
 },
 {
  "record": "ZMB-R-0001",
  "track": "rules",
  "status": "consulting",
  "status_date": "2025-08",
  "as_of": "2026-10-27",
  "evidence_items": 9,
  "summary": "Market guidelines and pricing methodology approved in 2025; seven operational drafts consulted in August 2025; subsequent adoption not verified."
 },
 {
  "record": "ZMB-R-0001",
  "track": "delivery",
  "status": "operating_partial",
  "status_date": "2025",
  "as_of": "2026-10-27",
  "evidence_items": 8,
  "summary": ""
 },
 {
  "record": "ZMB-R-0001",
  "track": "funding",
  "status": "not_applicable",
  "status_date": "",
  "as_of": "",
  "evidence_items": 0,
  "summary": ""
 }
]