Obib-Oranjemund 400 kV line, Namibia's second interconnector to South Africa

Record NAM-P-0001 · draft, not yet reviewed by a person

Status by track

DeliveryUnknown · target Jul 2026, outcome not verifiedsources checked 16 Oct 2026
  • construction of NamPower's 92 km section · May 2025
    NamPower's section was built between November 2024 and May 2025, as the "second interconnector to Eskom" NamPower's section was built between November 2024 and May 2025, as the "second interconnector to Eskom"NamPower projects page (Obib-Oranjemund 400 kV interconnector; Auas-Kokerboom) · projects page, Obib-Oranjemund entry · May 2025paraphrase, not a quotation
    NamPower projects page (Obib-Oranjemund 400 kV interconnector; Auas-Kokerboom) · projects page, Obib-Oranjemund entry · paraphrase, not a quotation
  • Eskom's section · undated
    the third portion "is the construction by Eskom of the line from Orange River to the Oranjemond substation in South Africa - however this portion has not yet been completed" (the page spells it Oranjemond) the third portion "is the construction by Eskom of the line from Orange River to the Oranjemond substation in South Africa - however this portion has not yet been completed" (the page spells it Oranjemond)NamPower projects page (Obib-Oranjemund 400 kV interconnector; Auas-Kokerboom) · projects page, Obib-Oranjemund entrynot yet checked by a personChecked by machine match on the editor's PC, 18 Oct 2026: the earlier wording did not match; replaced with the source's wording as the match report gives it; not yet checked by a person
    NamPower projects page (Obib-Oranjemund 400 kV interconnector; Auas-Kokerboom) · projects page, Obib-Oranjemund entry · not yet checked by a person
  • commissioning · target: Jul 2026
    commissioning targeted for July 2026 commissioning targeted for July 2026NamPower projects page (Obib-Oranjemund 400 kV interconnector; Auas-Kokerboom) · projects page, Obib-Oranjemund entry · target: Jul 2026paraphrase, not a quotation
    NamPower projects page (Obib-Oranjemund 400 kV interconnector; Auas-Kokerboom) · projects page, Obib-Oranjemund entry · paraphrase, not a quotation
Not established
  • Whether the line was commissioned. No source after June 2026 was found.
  • Whether Eskom's section is complete, and how much transfer capacity the line adds.
FundingUnknownsources checked 16 Oct 2026
  • project cost
    NamPower gives the cost of its section as N$1.2 billion NamPower gives the cost of its section as N$1.2 billionNamPower projects page (Obib-Oranjemund 400 kV interconnector; Auas-Kokerboom) · projects page, Obib-Oranjemund entryparaphrase, not a quotation
    NamPower projects page (Obib-Oranjemund 400 kV interconnector; Auas-Kokerboom) · projects page, Obib-Oranjemund entry · paraphrase, not a quotation
Not established
  • How Eskom's section is funded.

Connections

Institutions named

A role is shown only where a quoted source says what the institution does on this reform.

Reach: 1 cross-border links, 0 blockers, 3 institutions in 2 countries or bodies. Counted from the records.