Regulatory measure · Namibia

Moratorium on new generation licences for export

Record NAM-R-0002 · draft, not yet reviewed by a person

Status by track

RulesIn force · 5 Sep 2025sources checked 16 Oct 2026

First imposed from 5 March 2024 for 18 months; renewed from 5 September 2025 to 5 January 2029, or until transmission constraints are relieved. All evidence is from press reports of an ECB statement made in late July 2026.

  • moratorium on generation licences for export (first) · 5 Mar 2024
    a moratorium effective 5 March 2024 for 18 months, imposed on the ECB's suggestion, citing "constrained transmission capacity on interconnections" a moratorium effective 5 March 2024 for 18 months, imposed on the ECB's suggestion, citing "constrained transmission capacity on interconnections"Namibia halts issuance of licences to export electricity · article text · 5 Mar 2024not yet checked by a personChecked by machine match on the editor's PC, 18 Oct 2026: word for word (docs/quote-machine-match-2026-10-18.md); not yet checked by a personSecondary source: no ECB notice or Gazette notice for the first moratorium found
    Namibia halts issuance of licences to export electricity · article text · not yet checked by a person
  • moratorium on generation licences for export (renewal) · 5 Sep 2025
    the Minister renewed the moratorium on the ECB's recommendation, effective 5 September 2025, for 40 months the Minister renewed the moratorium on the ECB's recommendation, effective 5 September 2025, for 40 monthsECB renews moratorium on electricity generation licences for exports · article text · 5 Sep 2025paraphrase, not a quotationSecondary source: the ECB's statement and any Gazette notice could not be read
    ECB renews moratorium on electricity generation licences for exports · article text · paraphrase, not a quotation
  • moratorium on generation licences for export (renewal) · target: 5 Jan 2029
    the moratorium runs to 5 January 2029 "or until the existing transmission network constraints are alleviated" the moratorium runs to 5 January 2029 "or until the existing transmission network constraints are alleviated"ECB renews moratorium on electricity generation licences for exports · article text · target: 5 Jan 2029not yet checked by a personChecked by machine match on the editor's PC, 18 Oct 2026: word for word (docs/quote-machine-match-2026-10-18.md); not yet checked by a personSecondary source: the ECB's statement and any Gazette notice could not be read
    ECB renews moratorium on electricity generation licences for exports · article text · not yet checked by a person
  • moratorium on generation licences for export (renewal)
    "limited transmission capacity on interconnectors in neighbouring South Africa continues to restrict electricity exports" "limited transmission capacity on interconnectors in neighbouring South Africa continues to restrict electricity exports"ECB renews moratorium on electricity generation licences for exports · article textnot yet checked by a personChecked by machine match on the editor's PC, 18 Oct 2026: word for word (docs/quote-machine-match-2026-10-18.md); not yet checked by a personSecondary source: the ECB's statement and any Gazette notice could not be read
    ECB renews moratorium on electricity generation licences for exports · article text · not yet checked by a person
  • moratorium on generation licences for export (exemptions)
    exempted are plants with battery storage "intended specifically for night-time electricity export to the SAPP" (no condition attached), and IPPs taking part in NTCSA network upgrades, "subject to formal confirmation from the South African utility" exempted are plants with battery storage "intended specifically for night-time electricity export to the SAPP" (no condition attached), and IPPs taking part in NTCSA network upgrades, "subject to formal confirmation from the South African utility"ECB renews moratorium on electricity generation licences for exports · article textnot yet checked by a personChecked by machine match on the editor's PC, 18 Oct 2026: the earlier wording did not match; replaced with the source's wording as the match report gives it; not yet checked by a personSecondary source: the ECB's statement and any Gazette notice could not be read
    ECB renews moratorium on electricity generation licences for exports · article text · not yet checked by a person
Not established
  • The ECB's own statement and the legal instrument. Press reports appeared in late July 2026, about eleven months after the stated effective date; the gap is not explained.
  • Which South African lines or corridors limit exports. No source read names them.
  • The legal power used. Press reports cite section 21(1) of the Electricity Act, which sets criteria for licence applications; the text was not checked.
  • How much export capacity the moratorium holds back. The Brief reported in September 2023 that export licences totalling 1.2 GW had been issued against 780 MW of transfer capacity; that figure has not been checked.

Blockers

Connections

Institutions named

A role is shown only where a quoted source says what the institution does on this reform.

Reach: 2 cross-border links, 1 blockers, 2 institutions in 1 country. Counted from the records.