Constraint (event) · Namibia, Zambia, South Africa
Planned outages on the Caprivi Link (Gerus-Zambezi HVDC), November 2025 to July 2026
Record SAPP-K-0003 · draft, not yet reviewed by a person
Evidence
Dates: 11 Nov 2025, 13 Nov 2025, 11 Mar 2026
- converter work, November 2025 · 11 Nov 2025"11&13 November NamPower Caprivi Link HVDC Converter at Zambezi and Gerus substations to implement control … system modifications required for operation in reduced voltage mode" "11&13 November NamPower Caprivi Link HVDC Converter at Zambezi and Gerus substations to implement control … system modifications required for operation in reduced voltage mode"not yet checked by a personSAPP Quarterly Report, October to December 2025 · p.9 (by index) · not yet checked by a person
- outages, March 2026 · Mar 2026further Gerus-Zambezi HVDC outages on 11 March and 15 to 29 March 2026 further Gerus-Zambezi HVDC outages on 11 March and 15 to 29 March 2026paraphrase, not a quotationSAPP Quarterly Report, January to March 2026 · p.14 · paraphrase, not a quotation
- planned outage, July 2026 · target: 22 Jul 2026a planned Gerus-Zambezi HVDC outage on 22 July 2026 a planned Gerus-Zambezi HVDC outage on 22 July 2026paraphrase, not a quotationSAPP Quarterly Report, April to June 2026 (Issue Q1-2026/27) · p.9 · paraphrase, not a quotation
Still unknown
- Worked example 01 records SAPP's November 2025 market report as saying an outage "in the Nampower network" on 11 and 13 November "affected the transmission of power from NTCSA to ZESCO" (SAPP-K-0002 there). The quarterly report places converter work on the Caprivi Link on the same dates. That the two are the same event is inferred from the matching dates; no SAPP document links them.
- How much energy is wheeled across Namibia between South Africa and Zambia. Not found.
Blockers
- Outages on transit routes affect trade between other countries · evidence of the constraint
Connections
- Joint action or dependency with Namibia's import reliance, Freeze on new export generation licences
Institutions named
A role is shown only where a quoted source says what the institution does on this reform.
Reach: 1 cross-border links, 1 blockers, 2 institutions in 2 countries or bodies. Counted from the records.